第一篇:隧道塌方總結(jié)1
隧道圍巖大變形研究分析
due to the influence of natural geological conditions, collapse accident often bring enormous damage to the tunnel construction in the large section tunnel excavation of road(or railroad)construction.engineering equipment and the safety of personnel are seriously threatened by the collapse of tunnel which has the character of high incidence and high risk.1、primary influence factors and types of tunnel collapse 1.1 The main factors of tunnel collapse There are many influence factors in tunnel collapse, generally can be divided into external and internal factors, internal factors are mainly refer to the engineering geological and hydrogeological conditions, external factors are mainly refer to improper design and construction.1)unfavorable geological conditions unfavorable geological mainly includes the weathered metamorphic rock, fractured rock mass and rock pile area, fault, karst cave, landslide, mudslide, swelling strata, etc.when the tunnel encountered to those geological condition,some slight negligence may lead to the collapse of tunnel.2)underground water Groundwater is one of the important factors influencing the stability of surrounding rock.it not only reduces the strength of rock which has high softening coefficient, and also reduces the shear strength of structure plane.3)geostress geostress mainly includes the bias, plasticity, landslides and high ground stress area, etc.,there are many instances of collapse happened in the entrance zone of the tunnel were caused by bias and landslide,extrusion destruction of tunnel is often caused by plastic pressure,and rock burst often occured in high ground stress area, etc.4)improper design and construction.At present, “New Austrian Tunnelling Method” is used to design and construction in most of the tunnel, However, the deviation understanding of the concept and connotation of the principle led to many failure in engineering.collapse of tunnel is induced by many factors and the mechanism is of more complex, therefore, improper treatment measures for the complex geological during the construction will easily cause the occurrence of collapse disasters.1.2 analysis of collapse types there are many types of partitioning method, generally based on the cause of collapse, form, scale, mechanism, etc.it mainly divides into the following five kinds of forms.1)Partial collapse:Mainly happened in large blocky rock mass, the rock mass is cutted by structure surface and formed into different shapes of unstable structure.After cavern excavation, the friction direction of unstable structure surface slide and collapse occured.2)Arch collapse:Typically occur in layered rock mass or broken rock mass, it has two kinds, one kind is in the range of the pit, only occur in the arch department;Another kind is expanding arch collapse, including wall collapse.3)Deformed collapse:collapse induced by special geological conditions(caves, sinkhole, etc.), shallow buried and bias.4)swelling rock tunnel collapse:Due to high inflation pressure acts on the shotcrete support;The expansion of the rock body reduces the friction and shear strength;High water pressure accumulation。
5)Large deformation of tunnel the rock burst:surrounding rock large deformation problem of deep buried,long-large tunnels and underground engineering under high geostress condition has become a problem in underground engineering and become a major issue to be solved.2、deformation analysis for surrounding rock of tunnels With the rapid development of tunnel and underground engineering, the characteristic of its long-scale-deep are increasingly obvious, and it is prone to geological disasters,such as large deformation of surrounding rock in certain geological and environmental geological conditions.Based on a lot of literature retrieval, it is obviously that surrounding rock large deformation is a kind of great hazardous geology casualty of tunnel and underground engineering.2.1 current research of large deformation of Tunnel surrounding rock though a lot of domestic and foreign scholars have done a lot of exploration efforts, due to the large deformation theory research is not mature, as well as the complexity of on-site geological rock mass condition, the current research work is mainly manifested in the following aspects.1)The concept for large deformation there is no form a consistent and clear definition About the large deformation of surrounding rock, Some scholars according to whether the deformation of surrounding rock is within the reserved deformation of primary support to define it.Also some scholars think it shouldn't be defined by the absolute value of the deformation which is the external performance of large deformation problem.It should be defined by the essence that the surrounding rock occurs shear deformation,deflection,rupture and failure under the shear stress, and causes the rock mass squash the underground cavity.2)analysis of the soft rock so far,Rock engineering community has been unable toreach a consensus on the concept of soft rock, the definition of soft rock is more than a dozen.the definition of soft rock of ISRM(international society for rock mechanics, 1990,1993)is refers to the uniaxial compressive strength of rock was 0.5 ~ 25 mpa;In 1984 coal mine term discussion(kunming),soft rock is defined as “l(fā)ow strength, high porosity ,poor cementation and affected by structural plane cutting and weathering or contains a lot of expansive clay minerals and loose, soft rock(body)”;And some scholars also divide it into geological soft rock and engineering soft rock and so on.3)
People generally divide it into two types base on the formation mechanism of the surrounding rock large deformation.The first type is caused when redistribution stress exceeds surrounding rock's strength after tunnel excavation, which makes the surrounding rock be plasticity.the other type is caused when certain minerals in the rock react with water and inflation.swelling mineral and water are significant for the expansion deformation.2.2 type and mechanism of Large deformation of tunnel surrounding rock Tunnel surrounding rock large deformation can be defined as: a kind of plastic deformation and failure with progressive and obvious time effect of tunnel and underground engineering surrounding rock, it is different from brittle failure of rock burst and distinguish it from collapse and slide, etc, which are caused by the rock's structure plane of surrounding rock loose zone.1)the type of Large deformation of tunnel surrounding rock According to the analysis of typical examples and the research on mechanism of large deformation, classification on the large deformation was carried out base on different controlled conditions: controlled by lithology of surrounding rock , controlled by the structure of surrounding rock and affected by artificial excavation disturbance.在公路(或鐵路)隧道大斷面開挖施工中,由于自然地質(zhì)條件、施工等的影響,常會發(fā)生塌方事故,給隧道施工帶來極大危害。塌方以其高發(fā)性、高危性嚴(yán)重威脅著工程設(shè)備和人員安全。本報告從塌方的類型、塌方的影響因素進(jìn)行了總結(jié),并對隧道中的大變形進(jìn)行了一定的介紹。
1、隧道塌方類型及塌方主要影響因素 1.1隧道塌方主要影響因素 影響隧道塌方的因素很多,大體上可分為內(nèi)因和外因,內(nèi)因主要是指工程地質(zhì)和水文地質(zhì)條件,外因主要是指設(shè)計和施工不當(dāng)。
1)不良地質(zhì)條件
不良地質(zhì)主要包括風(fēng)化變質(zhì)巖體、裂隙發(fā)育巖體、崩塌巖堆地區(qū)、斷層帶、溶洞、滑坡、泥石流、膨脹性地層等,當(dāng)隧道從這些巖體中通過時,如稍有疏忽,就可能發(fā)生大塌方。
2)地下水
地下水是影響圍巖穩(wěn)定的重要因素之一。這不但能使巖石強(qiáng)度降低,特別是軟化系數(shù)較大的巖石,而且使結(jié)構(gòu)面的抗剪強(qiáng)度減小。對于斷層,地下水影響更大,一般張性斷層是儲水結(jié)構(gòu),壓性斷層帶中斷層糜棱巖是隔水的,而另一側(cè)的破碎帶為含水的,當(dāng)揭穿斷層后,便時常發(fā)生突發(fā)性涌水導(dǎo)致塌方。
3)地壓
地壓主要包括偏壓、塑性地壓、滑坡及高地應(yīng)力區(qū)等,偏壓和滑坡在隧道洞口段造成的塌方實例很多,塑性地壓引起隧道擠出性破壞也時有發(fā)生,高地應(yīng)力區(qū)的完整堅硬巖體常發(fā)生巖爆等。
4)設(shè)計和施工不當(dāng)
目前,大多數(shù)隧道都號稱采用“新奧法”設(shè)計和施工,由于對“新奧法”概念和原則的內(nèi)涵理解有偏差,所以在許多工程中遭到失敗。
由于塌方誘發(fā)因素多、機(jī)理復(fù)雜,因此,在施工中針對復(fù)雜地質(zhì)時若處理措施不當(dāng),將極易造成塌方災(zāi)害的發(fā)生。
1.2塌方類型分析
塌方類型的劃分方法有多種,一般根據(jù)塌方的原因、形式、規(guī)模、機(jī)理、發(fā)生的部位等進(jìn)行劃分,主要分為以下五種形態(tài):
1)局部塌方:主要發(fā)生在大塊狀巖體中,由于巖體被結(jié)構(gòu)面切割后構(gòu)成不同形狀的不穩(wěn)定結(jié)構(gòu)體。洞室開挖后,不穩(wěn)定結(jié)構(gòu)面的摩擦力向洞內(nèi)滑移而發(fā)生塌方。
2)拱形塌方:一般發(fā)生在層狀巖體或破碎塊巖體中,它有兩類,一類是在坑跨范圍內(nèi),僅出現(xiàn)在拱部;另一類是包括側(cè)壁崩塌在內(nèi)的擴(kuò)大的拱形塌方。
3)異形塌方:由于特殊地質(zhì)條件(溶洞、陷穴等),淺埋、偏壓隧道等原因產(chǎn)生的塌方。4)膨脹巖隧道塌方:由于高膨脹壓力作用在噴混凝土支護(hù)上;巖土體的膨脹原因使摩擦和剪切強(qiáng)度損失,造成很大的巖石材料重力荷載;高水壓力積聚等造成隧道塌方。
5)大變形的隧道和巖爆:高地應(yīng)力狀態(tài)下的深埋、長大隧道及地下工程的圍巖大變形問題已經(jīng)成為困擾地下工程界的難題和尚待進(jìn)行深人研究的重大課題之一。
2、隧道圍巖大變形分析
隨著隧道工程以及地下工程的迅猛發(fā)展,其長、大、深的特點日趨明顯,而在一定的圍巖地質(zhì)和環(huán)境地質(zhì)條件下則往往易于發(fā)生圍巖大變形等地質(zhì)災(zāi)害。根據(jù)大量文獻(xiàn)檢索結(jié)果顯示,隧道工程圍巖大變形已是困擾地下工程界的一個重大問題。
2.1隧道圍巖大變形研究現(xiàn)狀
國內(nèi)外學(xué)者已經(jīng)做過不少的探索工作,但由于大變形理論的研究不盡成熟,加之現(xiàn)場地質(zhì)巖體狀況復(fù)雜性,目前的研究工作主要表現(xiàn)在以下方面。
1)大變形的定義
關(guān)于圍巖大變形,目前還沒有形成一致的和明確的定義。有的學(xué)者提出根據(jù)圍巖變形是否超出初期支護(hù)的預(yù)留變形量來定義大變形。也有的學(xué)者認(rèn)為,不能從變形量的絕對值大小來定義大變形問題,具有顯著的變形值是大變形問題的外在表現(xiàn),其本質(zhì)是由剪應(yīng)力產(chǎn)生的巖體的剪切變形發(fā)生錯動、斷裂分離破壞,巖體將向地下空洞方向產(chǎn)生壓擠推變形來定義大變形。
2)關(guān)于軟巖的分析
至今巖石工程學(xué)界仍未就軟巖的概念達(dá)成共識,軟巖的定義有十幾種之多。ISRM(國際巖石力學(xué)學(xué)會1990,1993)定義的軟巖是指單軸抗壓強(qiáng)度為0.5~25MPa的一類巖石;1984年煤礦礦壓名詞討論會(昆明)將軟巖定義為“強(qiáng)度低、空隙大、膠結(jié)程度差、受結(jié)構(gòu)面切割及風(fēng)化影響或含有大量易膨脹粘土礦物的松、散、軟、弱巖層(體)”;還有的學(xué)者將軟巖劃分為地質(zhì)軟巖和工程軟巖兩類等等。
3)大變形機(jī)制
人們一般按形成機(jī)制將圍巖大變形分為兩類:一是開挖形成的應(yīng)力重分布超過圍巖強(qiáng)度而發(fā)生塑性化。二是巖石中的某些礦物和水反應(yīng)而發(fā)生膨脹。水及某些(膨脹性)礦物的存在,對于膨脹變形是必須的。
2.2、隧道圍巖大變形的類型與機(jī)制
隧道圍巖大變形可以定義為:隧道及地下工程圍巖的一種具有累進(jìn)性和明顯時間效應(yīng)的塑性變形破壞,它既區(qū)別于巖爆運動脆性破壞,又區(qū)別于圍巖松動圈中受限于一定結(jié)構(gòu)面控制的坍塌、滑動等破壞。
1)隧道圍巖大變形的類型分析
根據(jù)對圍巖大變形典型實例的分析和對大變形機(jī)制研究,可以按照不同的受控條件對大變形進(jìn)行類型劃分:受圍巖巖性控制的大變形,受圍巖結(jié)構(gòu)構(gòu)造控制的大變形和受人工采掘擾動影響的大變形三大類型
2)large deformation mechanism of Tunnel surrounding rock 2)隧道圍巖大變形機(jī)制研究
圍巖的變形破壞首先取決于圍巖性質(zhì),其中包括圍巖體的巖性、結(jié)構(gòu)條件,其次受到圍巖的環(huán)境條件即地應(yīng)力的大小、地下水的發(fā)育分布狀況的影響,同時也與圍巖的支護(hù)條件密切相關(guān)。
一般而言,隧道變形將經(jīng)歷初始變形、等速變形及加速變形3個階段。在隧道開挖初期,由于圍巖變形剛開始,巖體內(nèi)應(yīng)力場和位移場處于線性變化階段,處于力學(xué)平衡狀態(tài),這時圍巖處于初始變形階段。隨著開挖過程的進(jìn)行、圍巖地應(yīng)力釋放、應(yīng)力狀態(tài)重新分布,引起某些區(qū)域局部變形、微裂隙產(chǎn)生、應(yīng)力增加,使得巖體內(nèi)部微裂隙不斷增加和擴(kuò)展。這時圍巖處于等速變形階段。隨著圍巖變形的增長,裂隙進(jìn)一步擴(kuò)展、連通、叢集,甚至局部貫通,圍巖發(fā)生較大的變形,變形速率持續(xù)增加,直至整體失穩(wěn)坍塌,這時圍巖處于加速變形階段。若局部變形發(fā)展過程中,圍巖系統(tǒng)受到外界干擾(如:降雨、人工影響、振動等),則將促使其變形和破壞過程的加速發(fā)展。
3、隧道圍巖大變形的預(yù)測
在大變形的預(yù)測方面,目前國內(nèi)外尚無實用的預(yù)測大變形的方法、日本學(xué)者viladkar(1995)提出利用地層Q值的“臨界埋深法”,當(dāng)實際埋深大于臨界埋深時,圍巖應(yīng)視之為擠壓性圍巖,具有發(fā)生大變形的條件。但此種方法與開挖斷面及支護(hù)不發(fā)生關(guān)系,與支護(hù)變形量的大小也無內(nèi)在聯(lián)系,當(dāng)實際埋深大于臨界埋深時可能發(fā)生的支護(hù)變形值有多大難以確定。
大變形的預(yù)測另一方法是,對于一個具有錨噴支護(hù)的洞室,采用彈塑性理論解析公式計算其在地應(yīng)力作用下的最終洞壁位移,然后確定位移與地應(yīng)力及巖體強(qiáng)度三者的關(guān)系(繪出曲線圖形),如已知地應(yīng)力及巖體強(qiáng)度支護(hù)位移值及大變形的等級可從圖中查得。
4、隧道圍巖大變形的支護(hù)對策
交通隧道的支護(hù)包括初期支護(hù)和二次襯砌。對于軟巖隧道,支護(hù)的首要任務(wù)是如何遏制初期支護(hù)的大變形。隨著人們對大變形現(xiàn)象認(rèn)識不斷深化,提出了各種各樣的支護(hù)措施和手段,這些支護(hù)措施基本可以分為以下三大類
1)剛性支護(hù)
這種支護(hù)措施的核心是通過加大支護(hù)結(jié)構(gòu)的強(qiáng)度和剛度來抵抗巨大的圍巖壓力,這種支護(hù)措施無論從技術(shù)上還是從經(jīng)濟(jì)上,都是欠合理的,現(xiàn)在已經(jīng)較少采用。
2)可縮支護(hù)
這種支護(hù)的理論依據(jù)是允許圍巖發(fā)生適度的變形,以降低作用于結(jié)構(gòu)的支護(hù)壓力,從而減少超挖量并降低支護(hù)強(qiáng)度。
可縮支護(hù)系統(tǒng)在國內(nèi)外煤礦巷道支護(hù)方面已經(jīng)取得一些成功的經(jīng)驗,但該方法只允許適度變形,若超出支護(hù)體系的允許變形范圍,這類支護(hù)結(jié)構(gòu)一般很難抵擋圍巖的巨大壓力,該方法在交通隧道支護(hù)中的應(yīng)用效果并不理想。
3)錨、注一體化圍巖加固--支護(hù)系統(tǒng)
錨噴襯砌作為隧道初期支護(hù)的主要手段,也構(gòu)成了永久襯砌的重要組成部分。噴錨襯砌是一種加固圍巖、充分利用圍巖自承能力的一種支護(hù)襯砌形式,并且快速及時,可以節(jié)約勞動力及成本,作為復(fù)合式襯砌的初期支護(hù)在工程實際應(yīng)用中日益受到重視。
5、隧道工程圍巖大變形實例
首例嚴(yán)重的交通隧道軟弱圍巖大變形應(yīng)該是1906年竣工的長19.8km的辛普倫Ⅰ線隧道。此后,日本的惠那山(Enasan)公路隧道、奧地利的陶恩(Tauern)隧道、阿爾貝格(Arlberg)隧道等都是典型的隧道圍巖大變形災(zāi)害工程事例。中國的青藏線4.0km長的關(guān)角隧道、寶中線3.136km長的木寨嶺隧道及1.904km長的堡子梁隧道、南昆線上的穿越煤系地層的家竹箐鐵路隧道、在建的國道317線鷓鴣山公路隧道(4.442km),以及鐵山隧道(2.099km)等工程均出現(xiàn)了不同形式和程度的圍巖大變形情況,給工程建設(shè)造成極大的困難。
木寨嶺隧道是國道212線連接西南和西北的重要通道之一,長1710m,東西引線總長9010m。隧道位于高海拔地區(qū),不僅埋深較大(272.28m),而且工程地質(zhì)條件極為復(fù)雜。自開工以來,隧道發(fā)生強(qiáng)烈變形和破壞,嚴(yán)重困擾著施工安全并影響工期。5.1木寨嶺隧道工程地質(zhì)環(huán)境
木寨嶺隧道為深埋大跨度公路隧道,由于其罕見的復(fù)雜地質(zhì)條件,斷層發(fā)育,巖體破碎軟弱、地下水豐富,地應(yīng)力高,隧道成洞條件及自穩(wěn)能力極差,圍巖變形和隧道破壞嚴(yán)重。5.2木寨嶺隧道變形破壞特征 1)圍巖變形特征
隧道開挖后,圍巖變形非常強(qiáng)烈,其表現(xiàn)為變形量大、初期變形快且變形速率大、變形持續(xù)時間長、空間分布不均勻和不對稱、隧道某些地段重復(fù)性變形等特征。2)隧道破壞特征 木寨嶺隧道洞身主要為含炭頁巖,巖體軟弱破碎,褶皺發(fā)育,圍巖自穩(wěn)能力差。開挖過程中局部經(jīng)常出現(xiàn)掉塊和塌方現(xiàn)象。變形破壞最嚴(yán)重的區(qū)域為各斷層破碎帶。其主要的破壞特征有初期支護(hù)變形破壞、掌子面變形破壞、仰拱變形破壞和二次襯砌的變形破壞。5.3木寨嶺隧道圍巖大變形機(jī)理分析
木寨嶺隧道圍巖大變形是在巖性((膨脹性巖石)、地下水和地應(yīng)力場綜合作用下,因開挖卸荷,圍巖發(fā)生塑性流動和膨脹所致。隧道圍巖壓力同時包括形變圍巖壓力和膨脹圍巖壓力,此即為該隧道大變形和嚴(yán)重破壞的原因和本質(zhì)。5.4大變形處治實踐
通過正確認(rèn)識圍巖變形破壞機(jī)制,根據(jù)圍巖動態(tài)演化規(guī)律,從塑性變形和圍巖膨脹兩方面,通過封閉工作面、錨注支護(hù)與自進(jìn)式錨桿和聯(lián)合支護(hù)體系,快速“強(qiáng)行”支護(hù),確保了大變形軟巖段返修成功,同時可為后續(xù)段的施工提供參考。
6、結(jié)語
進(jìn)入21世紀(jì),地下空間的開發(fā)利用將以新的深度和廣度發(fā)展,交通隧道、水工隧道及其它地下工程“長、大、深、群”的特點將更加顯著。深埋長大隧道工程軟巖大變形問題的進(jìn)一步深人研究將是今后地下工程界的一個重大課題。對大變形機(jī)理的正確認(rèn)識和合理描述、圍巖大變形預(yù)測、錨、注、噴一體化(錨、注為核心)圍巖加固--支護(hù)技術(shù)的進(jìn)一步完善、優(yōu)化,是今后隧道圍巖大變形問題討論和研究的重點。
第二篇:隧道塌方整治
寶蘭二線新玉石咀1號隧道塌方整治對策探討
摘 要 寶蘭二線新玉石咀1號隧道施工中曾多次發(fā)生塌方、掉塊,其中進(jìn)口端較大的一次塌方5600m3,并有11人困于洞中,搶險及整治施工十分危險,隨時有發(fā)生更大規(guī)模塌方的可能,形勢險迫,經(jīng)過及時勘察,合理整治,成功通過了塌方段。本文分析了隧道的工程地質(zhì)條件、影響隧道施工的地質(zhì)因素及病害產(chǎn)生原因,針對塌方整治的難點,總結(jié)了處理和預(yù)防塌方的對策措施。關(guān)鍵詞 隧道塌方 整治 對策
1.概況
寶蘭二線新玉石咀1號隧道為雙線曲線隧道,位于隴西土店子站東渭河北岸,隧道進(jìn)口里程為DK1536+125,出口里程為DK1536+688,隧道全長為563m。隧道開挖由進(jìn)口端開始,通過黃土進(jìn)入巖層后掉塊,塌方事故不斷。在掌子面掘進(jìn)至SK1536+270、護(hù)拱打至DK1536+260~+270,隧道襯砌到DK1536+
216、仰拱做到DK1536+230時,發(fā)生在DK1536+270段的5600m3塌方為最大,洞頂形成一直徑10余米、高10余米的穹窿,造成施工人員11人困于洞中,生死不明(后經(jīng)全力搶救脫險)。由于塌方段穹窿頂與洞外沖溝溝底對應(yīng),頂板薄,且均為土體,隨時有塌通天甚至引發(fā)洞外高陡山坡塌滑的可能,加之圍巖松動,掉塊不斷,給搶險施工帶來極大的風(fēng)險,因而,搶險措施和塌方整治對策成為隧道繼續(xù)施工掘進(jìn)的焦點和重點。
2.隧道工程地質(zhì)特征
2.1 地形地貌
隧道位于渭河峽谷區(qū),兩岸地形起伏較大,相對高差大于100m,北岸自然山坡高陡,坡度一般在40o以上,地表植被貧乏,黃土地貌景觀,沖溝、陷穴等現(xiàn)象發(fā)育。2.2 地層巖性
勘察與施工揭示,工點范圍內(nèi)地層有第四系上更新統(tǒng)風(fēng)積砂質(zhì)黃土,有由接觸變質(zhì)、動力變質(zhì)及區(qū)域變質(zhì)作用形成的壓碎巖、板巖、片巖和燕山期花崗巖。
1)砂質(zhì)黃土淡黃色,土質(zhì)均勻,粉粒為主,具孔隙及垂直節(jié)理,半干硬,II級普通土,σ0=150kpa,II類圍巖;具IV級自重濕陷性,濕陷土層厚12m。主要分布于隧道進(jìn)口及洞身段山體表層,厚10~30m。出口處為坡積成因,夾雜碎、塊石,工程地質(zhì)相對較差。
2)壓碎巖以花崗巖為主,局部礦物呈定向排列為花片麻巖,顏色澠雜,青灰、灰黑色為主,壓碎或鱗片變晶結(jié)構(gòu),帶狀及片麻狀構(gòu)造,節(jié)理、裂隙發(fā)育,風(fēng)化嚴(yán)重,局部呈砂、土狀,IV級軟石為主,σ0=500~1000kpa,III~IV類圍巖,多見于花崗巖與板巖、片巖接觸帶附近。
3)板巖、片巖灰色、灰褐色為主,變晶結(jié)構(gòu),板狀、片狀構(gòu)造,受接觸蝕變及構(gòu)造影響,板理、片理及小的斷層構(gòu)造發(fā)育,巖層破碎,風(fēng)化嚴(yán)重,IV級軟石為主,σ0=600~800kpa,III~IV類圍巖。一般見于花崗巖之上,局部呈捕虜體于花崗巖之中。4)花崗巖青灰、灰白色,礦物成分以石英、長石、云母為主,中、粗粒結(jié)構(gòu),塊狀構(gòu)造,巖體受構(gòu)造影響嚴(yán)重,節(jié)理、裂隙發(fā)育,石質(zhì)堅硬,風(fēng)化嚴(yán)重或極嚴(yán)重,風(fēng)化層一般2~5m,局部厚達(dá)10m,為10m, 級軟石,σ0=500~800kpa,以下V級次堅石,σ0=1200kpa,IV類圍巖。2.3 水文地質(zhì)
隧道在勘測及施工期間未遇到較大地下水,僅在雨季施工時偶見少量下滲的基巖裂隙水,對隧道圍巖及施工不構(gòu)成影響。
3.影響隧道施工的地質(zhì)因素
3.1 地形地貌因素
本隧位于渭河峽谷區(qū)北岸既有線靠山一側(cè),線間距20~50m,既有線在此以填方或半填半挖形式通過山坡坡腳,高陡的山坡,發(fā)育的沖溝、陷穴,對隧道進(jìn)、出口的塌方往往直接影響,由于塌方,引起洞頂?shù)乇黹_裂變形,對坡角的既有鐵路構(gòu)成重大安全隱患,處理不當(dāng),變形進(jìn)一步發(fā)展勢必直接威脅既有線行車安全,給II線隧道施工造成極大困難。故而,必須嚴(yán)控和妥善處理好隧道進(jìn)、出口段的塌方。3.2 地層巖性因素
隧道原設(shè)計圖系根據(jù)進(jìn)口一個鉆孔和現(xiàn)場調(diào)查資料填繪,與工程有關(guān)只顯示上更新統(tǒng)砂質(zhì)黃土和燕山期花崗巖兩種較單一地層。然在隧道施工開挖中實際還遇到壓碎花崗巖(部分為花崗片麻巖)及板巖、片巖等較軟弱巖層。而且,在隧道施工中,開挖掌子面較多在侵入的花崗巖與板巖、片巖等的蝕變接觸帶附近。巖相的復(fù)雜與變化,嚴(yán)重制約了隧道的掘進(jìn),帶來了許多意想不到的麻煩。3.3 地質(zhì)構(gòu)造因素
勘察及開挖顯示,本隧未穿越大的斷層構(gòu)造,但從隧道掘進(jìn)中所遇巖性、巖相變化大,較多為動力變質(zhì)、區(qū)域變質(zhì)作用形成的巖層;圍巖節(jié)理、裂隙發(fā)育,局部有斷層破碎帶寬度1~2m的小的斷層切割,巖層破碎等情況仍可認(rèn)定:隧道圍巖受構(gòu)造影響嚴(yán)重,巖層風(fēng)化破碎,而原資料勘測人員顯然對此認(rèn)識不足,很大程度上影響了隧道設(shè)計和施工掘進(jìn)。
3.4 不良地質(zhì)因素
主要為高自重濕陷性黃土問題。隧道范圍廣布的"級自重濕陷性黃土及衍生的黃土沖溝、陷穴等,是隧道尤其是進(jìn)、出口段施工的隱患,往往給隧道施工帶來意想不到的不利影響,本隧道施工中幾次較大的坍方變形,與其不無關(guān)系。
4.塌方原因分析
縱觀本隧施工所遇幾次較大塌方,除前述地質(zhì)因素外,分析原因無外乎以下幾點:(1)對隧道地質(zhì)條件的變化及復(fù)雜性認(rèn)識不足,工程措施不到位或針對性不強(qiáng)。這其中有勘測設(shè)計存在的問題,更有監(jiān)理、施工的因素,出現(xiàn)問題及時反映,及時有針對性采取變更加強(qiáng)措施,即可避免事故或減少損失。
(2)施工單位急功近利,為趕工期、搶進(jìn)度,往往忽視設(shè)計文件中要求或設(shè)計、配合施工人員屢次強(qiáng)調(diào)的“做好超前支護(hù)、控制臺階的開挖長度,做到先棚后挖,支護(hù)襯砌緊跟”的施工原則,在進(jìn)、出口段及軟弱巖層開挖中,臺階過長、二次襯砌與掌子面距離過大,以至出現(xiàn)坍方,影響了隧道的正常施工。(3)部分工程施工措施不到位,如對進(jìn)口端洞頂沖溝內(nèi)黃土陷穴的調(diào)查、回填不及時,對塌方的產(chǎn)生起到了一定的促進(jìn)作用。(4)由于在一定段落內(nèi)隧道位于侵入巖與片巖的蝕變接觸帶及部分?jǐn)鄬优c風(fēng)化破碎帶中,蝕變接觸帶等出現(xiàn)在隧道開挖面的里程段落不定,沒有規(guī)律,而且片巖捕虜體在開挖斷面上的位置也毫無規(guī)律,給制定隧道的施工方案及支護(hù)參數(shù)帶來了一定的困難,在遇到地質(zhì)條件變化時,不能及時的改變施工方法,是造成塌方的一個因素。
5.塌方整治的難點及對策措施
5.1 進(jìn)口端5600m3 塌方整治難點及對策措施 本塌方發(fā)生在進(jìn)口端DK1536+227~+247 長20m段,向前距開挖掌子面23m.,往后距隧道襯砌終點11m。塌方處初期支護(hù)垮塌,洞頂已塌至黃土層中,形成高十余米的穹窿,距其外對應(yīng)的沖溝溝底僅約10m。鑒于塌方后圍巖松動,掉塊不斷,洞頂土體薄,隨時有塌通天甚至引發(fā)洞外高陡山坡的塌滑變形,給清坍搶險帶來更大風(fēng)險,因而,安全施工,避免變形擴(kuò)大至難以控制,成為塌方整治的難點。
針對塌方整治的難點,經(jīng)多方共商,集思廣益,制定施工搶險措施如下:
(1)對DK1536+216(二襯終點)~+227長11m段既有施工支護(hù)進(jìn)行加強(qiáng),采用Φ42焊管(4m長)梅花形布置,注漿錨固;加噴C20混凝土10cm厚,確保塌方段兩端不再繼續(xù)產(chǎn)生塌方。(2)從DK1536+224開始在拱部用Φ100鋼管按環(huán)向間距0.5m做棚架(攔擋大塊落石)并掛網(wǎng)(攔擋小塊落石),同時按1榀/m架立型鋼做為棚架支撐,并用Φ200鋼管做豎向支撐至塌方頂,至DK1536+247止,長23m。
(3)在已完成棚架保護(hù)下清理塌落堆積物,同時用焊接方法按每次1m向前延伸棚架和型鋼支撐,并做豎向支撐、清坍,循環(huán)作業(yè)一直到未塌方支護(hù)地段(DK1536+247)。(4)在塌方段支護(hù)穩(wěn)定后,塌方頂部噴射C20混凝土15cm防護(hù)層;在該段起拱線以上部分做排架和模板,泵送混凝土澆筑1m厚護(hù)拱(拱頂)。
(5)在拱部護(hù)拱混凝土強(qiáng)度達(dá)到70%以后,拆除排架、模板,切割豎向支撐鋼管進(jìn)行下部施工———采用馬口形式開挖,架立鋼架支撐、澆筑混凝土,在護(hù)拱強(qiáng)度達(dá)到要求后,緊跟進(jìn)行襯砌混凝土施工,在DK1536+216~+260長44m段采用鋼筋混凝土襯砌予以加強(qiáng)。
(6)塌方段拱部襯砌背后穹窿空洞采用黃土水泥漿(水泥摻量10%)注漿回填。5.2 出口端1000m3塌方整治難點及對策措施
塌方發(fā)生在DK1536+625~635段,拱部以上覆蓋層約20m, 已塌通,山體表面形成一直徑約10m,深12m左右的井狀陷坑,坑壁陡直,靠山側(cè)表層坡積碎石厚8~10m,中密狀,下伏向河陡傾的片巖、板巖。陷坑所在山坡高陡,坡度近45o;洞內(nèi)進(jìn)口端襯砌至DK1536+599,出口端襯砌至DK1536+640,相距41m;進(jìn)口端施工掌子面在DK1536+627,出口端施工掌子面在DK1536+630,相距僅3m,已為塌落物覆蓋,塌方尤其陷坑的進(jìn)一步發(fā)展,勢必造成上方山體的失穩(wěn),危及位于坡腳的既有線行車安全,形勢險迫。為此,現(xiàn)場提出的治理原則是,迅速先治理洞外塌落的陷坑,避免其進(jìn)一步發(fā)展,引起山坡變形,危及行車安全,后進(jìn)行洞內(nèi)塌方整治施工。采報措施以下。1)陷坑的處理
(1)查明陷坑外山坡變形情況,觀測變形發(fā)展,增設(shè)觀測、預(yù)警崗哨;準(zhǔn)備防水布,雨天及時封蓋坑口,防止表水流入,惡化坡體條件。
(2)根據(jù)現(xiàn)場實際情況(地形條件、材料及機(jī)具設(shè)備等資源),在確??颖诩捌麦w穩(wěn)定和行車安全的前提下,靈活采取包括坑內(nèi)掛網(wǎng)、錨噴、支護(hù);坑外截、排水,夯填地表裂縫等措施。2)隧道內(nèi)的處理
(1)鑒于隧道上半斷面曾以導(dǎo)坑貫通,坍塌后地表陷落,塌方體以松散碎、塊石土為主,同意DK1536+627~630長3m, 段圍巖類別由IV類變更為1類。(2)施工支護(hù)予以加強(qiáng),設(shè)1榀/m的格柵鋼梁,拱部設(shè)超前小導(dǎo)管。
(3)DK1536+620~+640長20m 段襯砌類型采用“專隧(93)0030~23”,襯砌拱墻采用C20鋼筋混凝土。
(4)DK1536+627~+630長3m 段以2榀/m鋼筋格柵加強(qiáng)支護(hù),并模筑C20混凝土50cm厚護(hù)拱。(5)塌方段襯砌完成后,及時對陷坑進(jìn)行恢復(fù)原地表回填夯實,并在表面設(shè)粘土隔水層,厚50cm。
6.結(jié)束語
本隧道在各方關(guān)注和施工單位努力下業(yè)已掘通,各種塌方事故依照所制定整治措施也已順利治理完成,回顧和反思隧道施工所遇塌方問題,有以下經(jīng)驗教訓(xùn)值得汲取。(1)隧道與其它工程的不同之處是對施工安全的要求更高,任何疏漏、謬誤,在隧道施工中都有可能造成無法挽回的人員傷亡和經(jīng)濟(jì)損失;而隧道工程地質(zhì)勘察又不能做到像其他工程那樣慎密,從而導(dǎo)致隧道工程施工地質(zhì)條件變數(shù)較大,本隧道及本線其他一些隧道事故多發(fā),變更頻繁的事例再次證實了這一點。控制這個變數(shù),靠得是一線地質(zhì)人員深入細(xì)致的地質(zhì)工作,靠的是廣大地質(zhì)工作者的責(zé)任心和事業(yè)心。
(2)縱觀本線多個隧道施工中出現(xiàn)的塌方掉塊問題,絕大部分與隧道初期支護(hù)不及時或二次襯砌距施工掌子面距離過遠(yuǎn)密切相關(guān),各方尤其是施工單位對此應(yīng)充分加以重視,急功近利,往往因小失大,得不償失。魏家磨1號、琥珀等巖質(zhì)隧道,二襯距掌子面最遠(yuǎn)時達(dá)230m、190m,在基巖裂隙水及風(fēng)化作用下,初期支護(hù)無力抵抗變形發(fā)展,以至隧道多次發(fā)生塌方、掉塊、變形、開裂,教訓(xùn)可謂深重。
(3)隧道施工工程地質(zhì)條件的變化固然無法精準(zhǔn)地預(yù)料,然施工單位對不同地質(zhì)條件的施工應(yīng)變能力應(yīng)是可以調(diào)整的,至少做到遇地質(zhì)條件變化及時向設(shè)計單位反饋、及時采取調(diào)整變更措施是容易的。而現(xiàn)在較多的施工單位不知何故,遇事或遇地質(zhì)條件變化不反映或不聽從設(shè)計單位意見,自行解決,處理措施不當(dāng)時,往往惡化了施工地質(zhì)條件,給后續(xù)工作帶來許多無謂的困難和麻煩,問題的癥結(jié)有待查找、總結(jié)。最后要強(qiáng)調(diào)的是,隧道施工,安全與質(zhì)量并重,工期與進(jìn)度從屬,無論是建設(shè)單位、施工單位還是監(jiān)理單位都應(yīng)遵從這一點。
第三篇:隧道塌方變更方案 -
關(guān)于隧道進(jìn)口段大管棚塌孔變更方案
210國道 項目部:
依據(jù)由貴部邀請相關(guān)專家、設(shè)計、監(jiān)理、施工單位相關(guān)人員等參加的“就隧道進(jìn)口段初支變形、侵界等問題處理方案研討會”會議紀(jì)要決定,遵照公路管理局 “指示精神,結(jié)合施工圖紙及有關(guān)設(shè)計規(guī)范,經(jīng)計算論證:確定隧道進(jìn)口段初支變形、侵界等問題加固處理具體方案如下:
一、洞口仰坡裂縫部分
(1)對地表及仰坡裂縫處采用摻水泥土封堵密實,做好防排水措施,避免雨季來臨雨水下滲,造成仰坡失穩(wěn);
(2)明洞由25m增長至35m,洞門形式改為端墻式,明洞施工完畢后及時進(jìn)行回填,對仰坡形成反壓,防止仰坡滑塌;
(3)原設(shè)計明洞兩側(cè)邊坡底部(明洞回填)漿砌片石改為C15素混凝土;
(4)洞頂截水溝由漿砌片石改為C20素混凝土,溝底、溝壁混凝土厚10cm,溝底、溝壁混凝土內(nèi)設(shè)φ6單層鋼筋網(wǎng),網(wǎng)格尺寸15×15cm,具體尺寸見“洞頂截水溝尺寸圖”;
洞頂截水溝尺寸圖
(5)施工期間加強(qiáng)地表裂縫的觀察及地表沉降、位移觀測,如有異常,及時聯(lián)系設(shè)計單位并反饋數(shù)據(jù)。
二、進(jìn)口變形段部分
(1)停止掌子面的掘進(jìn),對掌子面附近的支護(hù)結(jié)構(gòu)進(jìn)行加強(qiáng),減緩隧道變形速率。隧道二襯施工以先明后暗的施工順序,待明洞施工完成反壓使仰坡山體相對穩(wěn)定后,再行洞內(nèi)二襯施工。
(2)洞口(K48+437.8)至掌子面(K48+523)上臺階底部未增設(shè)臨時仰拱處全部增設(shè)I20a工字鋼臨時仰拱,噴射混凝土厚度26cm。
(3)K48+491.5~K48+523段在隧道全環(huán)設(shè)置φ50注漿小導(dǎo)管,導(dǎo)管縱向間距同初支拱架,環(huán)向間距1.0m,導(dǎo)管長4.0m,采用1:0.8水泥水玻璃雙液漿,注漿壓力為0.8~1.2Mpa。
(4)K48+491.5~K48+523段對應(yīng)鋼拱架隔榀安裝門形鋼架支撐,鋼架采用與拱架相同的I20a工字鋼,與拱架連接處鑿除拱架混凝土保護(hù)層,與拱架焊接牢固,門架支撐見“I20a臨時門架支撐圖”。
(5)采用全站儀掃描斷面,獲得精確斷面量測數(shù)據(jù),根據(jù)數(shù)據(jù)確定需換拱段落、范圍。
(6)根據(jù)斷面量測數(shù)據(jù)對需換拱段落既有支護(hù)結(jié)構(gòu)及圍巖進(jìn)行
加強(qiáng),以0.6×0.8m(縱向×環(huán)向)的間距設(shè)置φ50注漿小導(dǎo)管,導(dǎo)管長4.0m,采用1:0.8水泥水玻璃雙液漿,注漿壓力為0.8~1.2Mpa。
(7)同一部位換拱鑿除砼不超過2榀,并間隔2榀進(jìn)行?;炷凌彸捎萌斯わL(fēng)鎬進(jìn)行,不得采用大型設(shè)備振動沖擊鑿除,新舊工字鋼采用鋼板幫焊連接。
(8)換拱段初支混凝土強(qiáng)度等級C25;
(9)換拱段二次襯砌鋼筋主筋(N1、N2、N3、N4)型號由φ22改為φ25,N5鋼筋由φ10改為φ12,鋼筋間距20×30cm(箍筋環(huán)向間距30cm)。
三、掌子面恢復(fù)施工后施工措施
(1)在仰拱施做至掌子面20米后再行掌子面開挖,洞內(nèi)相似圍巖段開挖采取單側(cè)壁導(dǎo)坑加臨時仰拱法施工;上臺階拱腳每側(cè)打設(shè)6根鎖腳錨管,下臺階拱腳每側(cè)打設(shè)4根鎖腳錨管,錨管與鋼拱架使用鋼板進(jìn)行連接固定。
(2)開挖下導(dǎo)時,應(yīng)先施做兩側(cè)矮邊墻(墻角擴(kuò)大基礎(chǔ)),后再進(jìn)行下導(dǎo)開挖。矮邊墻應(yīng)及時跟進(jìn)。
(3)鋼拱架間距由75cm調(diào)整為50cm;
(4)超前措施改為φ50雙層超前注漿小導(dǎo)管,導(dǎo)管每根長4.5m,縱向每榀打設(shè),環(huán)向間距30cm,拱頂135°范圍內(nèi)布設(shè),小導(dǎo)管第一層打入角度7°,第二層打入角度30~35°;徑向全環(huán)設(shè)置φ50注漿小導(dǎo)管,全斷面注漿,導(dǎo)管與鋼拱架焊接牢固,其余參數(shù)同原設(shè)計;
(5)臨時支護(hù)參數(shù)鋼拱架采用I20a型鋼,縱向間距0.5m,采用
φ50超前小導(dǎo)管,長度4.5m,環(huán)向間距0.4m,徑向采用φ22早強(qiáng)砂漿錨桿,長度4.0m,環(huán)向間距1.0m,縱向每榀打設(shè),錨桿需與鋼拱架焊接牢靠。
(6)該段二襯施做時,每50m設(shè)置一道沉降縫;
(7)在存在承壓水的圍巖處,貫通初支與圍巖打向上傾角30度的泄水孔,泄水孔直徑50mm,深4m;
(8)二次襯砌鋼筋主筋(N1、N2、N3、N4)型號由φ22改為φ25,N5鋼筋由φ10改為φ12,鋼筋間距20×30cm(箍筋環(huán)向間距30cm)。
四、特別注意事項
(1)在雨季來臨之前,必須完成對仰坡坡腳的反壓處理及洞頂截水溝施工作業(yè)。
(2)施工時,務(wù)必加強(qiáng)監(jiān)控量測工作,提供真實、可靠、準(zhǔn)確的監(jiān)控量測數(shù)據(jù),通過現(xiàn)場量測掌握圍巖和支護(hù)的變化參數(shù),加強(qiáng)動態(tài)管理,以指導(dǎo)施工作業(yè)。
(3)增設(shè)專職安全人員,隨時做好洞內(nèi)外沉降及變形觀察工作,并做好觀察記錄,發(fā)現(xiàn)安全隱患,立即匯報,采取應(yīng)急措施,確保整個施工階段安全生產(chǎn)。
二O一二年三月八日
6002.176022766.R***80.8注:2.a.b.c.d節(jié)點處設(shè)置縱向連接I20工字鋼,兩榀鋼架支撐長度根據(jù)實際情況來定;3.I20工字鋼之間連接方式為焊接。5
1.圖中支護(hù)鋼架尺寸以厘米為單位;
第四篇:隧道塌方事故應(yīng)急演練總結(jié)
東莞地鐵項目部隧道坍塌事故應(yīng)急演練總
結(jié)
為檢驗《坍塌事故現(xiàn)場處置方案》的針對性和可實施性,切實提高預(yù)防和處置突發(fā)坍塌事故的應(yīng)急救援水平,全面檢閱項目部各部門“快速反應(yīng)、部門聯(lián)動、專業(yè)保障、綜合處置、事故調(diào)查和善后處理”的能力,2013年3月25日上午9點30分,隧道坍塌事故應(yīng)急救援演練在東莞市軌道交通R2線2309標(biāo)臨時豎井成功舉行,現(xiàn)將演練的有關(guān)情況總結(jié)如下。
一、演練基本情況
本次演練由東莞地鐵項目部項目經(jīng)理胡瑞任總指揮,項目安全總監(jiān)曾愛明任副總指揮各部門參加演練,參演人員16人,本次演練以臨時豎井隧道在進(jìn)行掌子面施工過程中由于土方發(fā)生小面積巖體坍塌,二名作業(yè)人員被砸傷為背景,應(yīng)急救援預(yù)案啟動、各部門協(xié)同救援為主線,人工施救、專業(yè)施救等手段展開救援,演練歷時一小時,達(dá)到了預(yù)期效果,取得圓滿成功。
二、演練的主要工作
1、指定方案,分解任務(wù),扎實做好籌備準(zhǔn)備工作。為確保演練能夠安全順利進(jìn)行,使演練更具操作性和實效性,演練《演練過程》經(jīng)過嚴(yán)格細(xì)化和審核。從內(nèi)容上深化了各個階段,從實戰(zhàn)上強(qiáng)化了各種環(huán)節(jié)。
1、組織有力,明確責(zé)任,切實做好協(xié)調(diào)配合工作,項目部要求各參加演練部門根據(jù)演練總體目標(biāo),按照演練方案明確各自在坍塌事故現(xiàn)場處置方案中職責(zé)、任務(wù),細(xì)化演練分工,落實演練車輛,人員和裝備。為貫徹“安全第一”的方針,本著發(fā)現(xiàn)問題,完善方案的原則,各部門在項目部安質(zhì)部的組織下,積極配合,協(xié)同作戰(zhàn),在3月25日上午9點30分進(jìn)行了一次演練。
2、深化內(nèi)容,落實措施,堅實做好各項保障工作。本次演練所需資金由項目部安全專項資金解決。在人員、裝備、通訊得到保障的同時,為演練提供了有力的資金保障。
三、演練成效及存在問題
本次演練時間緊,任務(wù)重,全體參加部門和人員沒有絲毫懈怠發(fā)揚了密切配合,群策群力,協(xié)同作戰(zhàn)、精益求精的工作作風(fēng)。使演練取得了圓滿成功。演練成效主要,表現(xiàn)三個方面:
1、提高了應(yīng)急管理工作的認(rèn)識,增強(qiáng)了應(yīng)急演練的意識。加強(qiáng)應(yīng)急管理,是關(guān)系國家經(jīng)濟(jì)社會發(fā)展全局和人民群生命財產(chǎn)安全的大事。是全面落實科學(xué)發(fā)展觀,構(gòu)建社會主義和諧社會的重要內(nèi)容,是中鐵十一局集團(tuán)有限公司堅持以人為本、安全第一、健康至上、環(huán)保優(yōu)先、誠信守法、優(yōu)質(zhì)高效、持續(xù)改進(jìn)的重要體現(xiàn)。通過演練,讓我們看到重視應(yīng)急管理工作,開展經(jīng)常性、針對性德演練是十分必要德。演練還教育了廣大參建人員,對增強(qiáng)他們隧道安全工作和應(yīng)急救援處置的認(rèn)識起到了積極作用。
2、鍛煉了隧道救援隊伍的能力,提高了應(yīng)急救援的水平。通過演練,進(jìn)一步提高了隧道應(yīng)急救援隊伍的技能熟練程度和專業(yè)水平,為隧道坍塌事故實際救援處置提供了經(jīng)驗和方法,為確保建立一支拉得出、打的響、戰(zhàn)得勝的優(yōu)秀應(yīng)急救援隊伍奠定了基礎(chǔ),同時,通過演練,進(jìn)一步明確了各部門在應(yīng)急救援中的職責(zé)和任務(wù),并熟悉掌握應(yīng)急救援處置程序、方法和注意事項,有效地提高了整體應(yīng)急救援的反應(yīng)能力、指揮水平和實戰(zhàn)能力,增強(qiáng)了各部門、人員之間的協(xié)調(diào)。
3、完善了隧道應(yīng)急救援的體系,增強(qiáng)了預(yù)案的可操作性。事前預(yù)防固然重要,但事后救援也必不可少。演練可以發(fā)現(xiàn)問題、檢驗預(yù)案的可行性,為實現(xiàn)“統(tǒng)一指揮、反應(yīng)靈敏、協(xié)調(diào)有序、運轉(zhuǎn)高效”的應(yīng)急管理機(jī)制目標(biāo)和進(jìn)一步健全完善隧道事故應(yīng)急救援預(yù)案體系和處置程序探索了方法、提拱了經(jīng)驗、明確了目標(biāo)。找到了差距。通過演練和組織觀摩,進(jìn)一步促使各項安全措施、防范措施、應(yīng)急預(yù)案真正的落實到實處。
雖然演練取得了成功,但是,我們也從中發(fā)現(xiàn)一些問題,需要我們在日后的工作中加以改進(jìn):一是演練中通訊不夠暢通。今后做好通訊設(shè)備的調(diào)試工作,并要有相應(yīng)的備用通訊方式。二是演練后要加強(qiáng)現(xiàn)場安全警示及現(xiàn)場除險工作。為切實確保安全,應(yīng)在演練場地區(qū)域設(shè)置明顯的警示標(biāo)志,防止人員進(jìn)入,發(fā)生意外事故。
四、今后工作打算 在以后的安全生產(chǎn)中以隱患排查治理為主線,深化安全生產(chǎn)和應(yīng)急管理工作,切實提高我部應(yīng)對突發(fā)事件的能了,主要做好以下幾個方面:
1、要提高認(rèn)識,增強(qiáng)應(yīng)急管理責(zé)任、緊迫感和使命感。為強(qiáng)化應(yīng)急管理工作,要全面落實科學(xué)發(fā)展觀,堅持以人為本、預(yù)防為主,以落實和完善應(yīng)急預(yù)案為基礎(chǔ),居安思危,增強(qiáng)憂患意識,正確分析突發(fā)事件的風(fēng)險和挑戰(zhàn),進(jìn)一步提高對應(yīng)急管理工作重要性的認(rèn)識,明確責(zé)任,常抓不懈,努力提高我部的應(yīng)急體系建設(shè)管理水平。
2、要健全體制,要根據(jù)實際情況制定和完善相應(yīng)的應(yīng)急預(yù)案,明確各類突發(fā)事件的防范措施和處置程序。并加強(qiáng)對預(yù)案的動態(tài)管理,很抓預(yù)案落實工作,經(jīng)常性德開展預(yù)案演練,不斷增強(qiáng)預(yù)案的針對性和時效性。
3、要突出重點,開展對各類安全生產(chǎn)隱患的排查和治理。要組織力量認(rèn)真開展安全生產(chǎn)隱患排查治理工作,全面掌握本合同段各類安全生產(chǎn)隱患情況,建立分級、分類管理制度,落實綜合防范和處置措施,實際動態(tài)管理和監(jiān)控,加強(qiáng)協(xié)作隊伍之間的協(xié)調(diào)配合。對可能引發(fā)的安全隱患,要組織力量限期整改,特別是要加強(qiáng)對高危險業(yè)的安全檢查,發(fā)現(xiàn)隱患要采取措施,盡快消除。
4、要預(yù)防為主,加強(qiáng)對突發(fā)事件的信息報告和預(yù)警工作,要進(jìn)一步建立健全信息報告工作制度,明確信息報告的責(zé)任主體,對遲報、漏報、瞞報、謊報行為要依法追究責(zé)任。在加強(qiáng)信息報告工作的同時,通過建立舉報獎勵制度,不斷擴(kuò)寬信息報送渠道。建立預(yù)警信息通報與發(fā)布制度。
東莞地鐵項目經(jīng)理部 二0一三年三月二十五日
第五篇:隧道塌方應(yīng)急預(yù)案
中鐵十局大連地鐵205項目部 隧道施工安全事故應(yīng)急預(yù)案 總則 1.1編制目的
提高項目部對隧道施工重大安全事故的快速反應(yīng)能力,確保及時、有效地進(jìn)行應(yīng)對處理,預(yù)防和最大限度地減少隧道施工安全事故造成的人身傷亡、財產(chǎn)損失和負(fù)面社會影響。1.2編制依據(jù)
依據(jù)濟(jì)鐵公司《安全生產(chǎn)事故應(yīng)急預(yù)案管理辦法》、《安全生產(chǎn)事故應(yīng)急響應(yīng)及救援預(yù)案》以及《中華人民共和國安全生產(chǎn)法》、《建設(shè)工程安全生產(chǎn)管理條例》等法律法規(guī)和有關(guān)規(guī)定,制定本預(yù)案。1.3適用范圍
在大連地鐵205項目部施工區(qū)域范圍內(nèi),隧道工程施工發(fā)生安全事故和災(zāi)難時啟動本預(yù)案: 2.事故可能發(fā)生的地點和可能造成的后果 2.1事故可能發(fā)生的地點
隧道施工過程中,重點是淺埋段、以及復(fù)雜地質(zhì)、不良地質(zhì)隧道工程施工現(xiàn)場。
2.2隧道施工過程中,可能發(fā)生坍塌、冒頂、有害氣體中毒、突發(fā)大量涌水涌泥、透水等事故,可能造成以下后果:
(1)施工人員受到打擊、被坍塌土體掩埋以及因中毒、爆炸、淹溺等造成人身傷害。
(2)施工人員被困在洞內(nèi),如不及時解救,會因缺氧、缺水和缺食等危及生命安全。
(3)工程實體遭受破壞,施工機(jī)械設(shè)備、物料、通風(fēng)設(shè)備、電線路等遭到損壞。3 組織機(jī)構(gòu)與職責(zé) 3.1 組織機(jī)構(gòu)
3.1.1項目部隧道施工安全事故應(yīng)急領(lǐng)導(dǎo)小組
組 長:項目經(jīng)理;孫連勇
副組長:總工程師;肖剛,項目部生產(chǎn)副經(jīng)理;匡德友、劉勇,安全生產(chǎn)總監(jiān);王成。
成 員:項目部綜合辦公室、安質(zhì)部、物資部、工程技術(shù)部、財務(wù)部。
應(yīng)急領(lǐng)導(dǎo)小組日常辦公室設(shè)在安全質(zhì)量部,安全質(zhì)量部部長兼任辦公室主任。
3.1.2應(yīng)急領(lǐng)導(dǎo)小組下設(shè)機(jī)構(gòu)
3.1.2.1通信聯(lián)絡(luò)組:組長單位為項目部辦公室,成員單位為安全質(zhì)量部、綜合部。
3.1.2.2后勤保障組:物資部和綜合部。3.1.2.3專家組:組長單位指揮部安全管理組。
3.1.2.4 搶險組:組長單位項目負(fù)責(zé)人,成員單位為參與搶險的各施工單位。
3.1.2.5宣傳組:組長單位為綜合科。
3.1.2.6治安保衛(wèi)組:組長單位為安質(zhì)部,成員單位為分包單位專兼職保衛(wèi)人員。
3.1.2.7救護(hù)組:組長單位為項安質(zhì)部、綜合科。3.2職責(zé)
3.2.1應(yīng)急領(lǐng)導(dǎo)小組:貫徹落實黨和國家關(guān)于安全生產(chǎn)的方針政策、法律法規(guī);組織建立完善項目部應(yīng)急組織體系,制定項目部應(yīng)急預(yù)案和應(yīng)急工作制度;組織開展應(yīng)急救援工作,以最快的速度和最有效的辦法控制事態(tài)發(fā)展,把事故傷亡人數(shù)和經(jīng)濟(jì)損失以及負(fù)面影響降到最低限度;及時向上級報告事故情況;組織對事故進(jìn)行調(diào)查、處置;組織事故善后處理工作;組織開展事故應(yīng)急技術(shù)研究、應(yīng)急知識宣傳教育等工作。
3.2.2通信聯(lián)絡(luò)組:負(fù)責(zé)事故應(yīng)急救援期間的通信聯(lián)絡(luò)工作。3.2.3后勤保障組:負(fù)責(zé)后勤保障工作,做好各級搶險人員的食宿和交通安排。
3.2.4專家組:負(fù)責(zé)對事故現(xiàn)場作出安全性鑒定,在盡可能短的時間內(nèi)研究制定出搶險、加固等處置方案,指導(dǎo)搶險救援工作。3.2.5 搶險組:根據(jù)確定的方案,負(fù)責(zé)事故搶險救援的具體實施工作。3.2.6宣傳組:負(fù)責(zé)事故的信息和新聞發(fā)布,接待各級新聞媒體采訪,努力減少對企業(yè)的負(fù)面影響。
3.2.7治安保衛(wèi)組:負(fù)責(zé)閑雜人員的疏散,維持現(xiàn)場治安秩序,做好現(xiàn)場保衛(wèi)工作。
3.2.8救護(hù)組:負(fù)責(zé)組織對傷員進(jìn)行急救,并協(xié)助專業(yè)醫(yī)務(wù)人員進(jìn)行傷員救護(hù),做好傷亡者家屬的慰問、安撫工作。
3.2.9調(diào)查取證組:負(fù)責(zé)勘察事故現(xiàn)場,進(jìn)行調(diào)查取證,搜集有關(guān)物證等材料,在應(yīng)急結(jié)束后如實、完整、及時送交事故調(diào)查領(lǐng)導(dǎo)小組。4 應(yīng)急準(zhǔn)備
4.1項目經(jīng)理部必須認(rèn)真研究承擔(dān)項目的工程特點,制定相應(yīng)的應(yīng)急預(yù)案,建立和完善應(yīng)急組織機(jī)構(gòu)和應(yīng)急救援隊伍,加強(qiáng)宣傳教育、培訓(xùn)、監(jiān)督檢查工作,防患于未然。
4.2各隧道施工項目必須根據(jù)各自項目特點,配備必要的救援器材和設(shè)備,建立設(shè)備器材清單,如:挖掘機(jī)、裝載機(jī)、自卸汽車、氣焊、氣割設(shè)備、大型抽水設(shè)備、撐頂材料、應(yīng)急電話,傷員急救車輛以及配備急救藥箱、擔(dān)架、外傷救護(hù)用品等。4.3各單位必須定期檢查本單位應(yīng)急預(yù)案的編制和應(yīng)急準(zhǔn)備情況,應(yīng)急救援組織應(yīng)定期演練,使所有員工熟悉事故緊急處理的程序和方法,器材、設(shè)備等應(yīng)設(shè)專人進(jìn)行維護(hù)和管理。
4.4 項目經(jīng)理部必須向全體施工人員公布本項目應(yīng)急指揮機(jī)構(gòu)成員、工地管理人員的聯(lián)系電話,確保信息渠道暢通。5 事故報告 5.1應(yīng)急通訊
5.1.1項目部應(yīng)急領(lǐng)導(dǎo)小組辦公室
電話:辦公室;0411-39521516項目經(jīng)理;*** 5.2隧道施工各類安全生產(chǎn)事故,不論事故大小、何種原因,都必須執(zhí)行事故報告制度。
5.3發(fā)生事故后必須按照《中鐵十局集團(tuán)有限公司傷亡事故調(diào)查處理辦法》相關(guān)要求,將事故單位、事故發(fā)生的時間、地點,事故經(jīng)過、傷亡人數(shù)、傷亡人員自然狀況、采取的應(yīng)急措施、調(diào)查和善后組織工作及初步分析的原因等采用電話、傳真、電報或其它快速方法,在規(guī)定的時間內(nèi)向濟(jì)鐵公司報告。
5.4事故情況按施工現(xiàn)場→項目部應(yīng)急機(jī)構(gòu)→分公司應(yīng)急機(jī)構(gòu)→濟(jì)鐵公司應(yīng)急機(jī)構(gòu)的順序,按照先簡要后詳細(xì)的原則快速上報,確保應(yīng)急預(yù)案的快速啟動。
5.5當(dāng)發(fā)生本預(yù)案第3條所列情況之一時,事故單位必須在事故發(fā)生1小時內(nèi)將初步情況(事故發(fā)生的時間、地點、傷亡人數(shù)、傷亡程度)以電話方式快速報告給濟(jì)鐵公司應(yīng)急領(lǐng)導(dǎo)小組辦公室(或濟(jì)鐵公司辦公室),4小時內(nèi)將事故發(fā)生經(jīng)過、人員傷亡等詳細(xì)情況傳真至濟(jì)鐵公司應(yīng)急領(lǐng)導(dǎo)小組辦公室。6 應(yīng)急響應(yīng) 6.1報警 6.1.1當(dāng)工地發(fā)生安全事故后,現(xiàn)場人員應(yīng)立即大聲呼叫,將事故信息準(zhǔn)確傳出。聽到呼叫的任何人,均有責(zé)任將信息以電話、口頭傳達(dá)等方式報告給與其最近的項目部管理人員或項目部應(yīng)急指揮機(jī)構(gòu)的任何成員,使消息迅速報告到項目部安全事故應(yīng)急領(lǐng)導(dǎo)小組,啟動應(yīng)急預(yù)案。
6.1.2當(dāng)有人員傷害時,報警員負(fù)責(zé)打急救電話120,報告發(fā)生傷亡傷害的地點、傷害類型,同時告知工程附近醒目標(biāo)志,以利急救中心迅速判斷方位。
6.1.3項目部迅速將事故情況向(分)公司應(yīng)急領(lǐng)導(dǎo)小組上報,分公司應(yīng)急領(lǐng)導(dǎo)小組向公司應(yīng)急領(lǐng)導(dǎo)小組逐級快速上報。6.2啟動應(yīng)急預(yù)案
6.2.1各級應(yīng)急領(lǐng)導(dǎo)小組根據(jù)事故性質(zhì)、影響程度和職責(zé)權(quán)限,啟動相應(yīng)級別的應(yīng)急預(yù)案。應(yīng)急領(lǐng)導(dǎo)小組成員及搶險隊伍一旦接到通知,立即奔赴事故現(xiàn)場,按照各自職責(zé)分工迅速開展各項救援工作。6.2.2項目部應(yīng)急預(yù)案啟動后,立即成立現(xiàn)場指揮部,項目經(jīng)理任指揮長,相關(guān)部門負(fù)責(zé)人及事故單位負(fù)責(zé)人任副指揮長,組織、指揮各職能小組開展搶險救援并及時向上級領(lǐng)導(dǎo)及相關(guān)部門報告。6.3組織搶險
6.3.1在上一級應(yīng)急領(lǐng)導(dǎo)小組未到達(dá)現(xiàn)場前,下一級的應(yīng)急領(lǐng)導(dǎo)小組要立即組織義務(wù)搶險隊員和施工現(xiàn)場員工進(jìn)行初步搶險,對事態(tài)進(jìn)行控制,防止傷害事故進(jìn)一步擴(kuò)大。
6.3.2上一級應(yīng)急指揮機(jī)構(gòu)到達(dá)現(xiàn)場后,迅速調(diào)動一切力量,采取一切手段,以最快的速度和最有效的辦法控制事故的狀態(tài),并將人員傷亡、經(jīng)濟(jì)損失、負(fù)面社會影響降低到最低程度。6.4應(yīng)急措施
6.4.1人員疏散是減少人員傷亡擴(kuò)大的關(guān)鍵,一旦發(fā)生安全事故,現(xiàn)場疏散組負(fù)責(zé)組織現(xiàn)場人員首先撤離至安全區(qū)域,撤離危險場所后,立即清點現(xiàn)場施工人員數(shù)量。
6.4.2搶險前,應(yīng)首先檢查修復(fù)損壞的電線路、通風(fēng)設(shè)施,避免觸電傷害,確保洞內(nèi)通風(fēng)良好。發(fā)生透水和突發(fā)大量涌水涌泥事故應(yīng)首先切斷透水區(qū)域36V以上電源。
6.4.3對被困人員施救前,搶險隊?wèi)?yīng)首先按照初步方案進(jìn)行搶險,待專家組研究制定出詳細(xì)方案后,再按詳細(xì)方案組織實施。專家組應(yīng)根據(jù)現(xiàn)場的實際情況,在盡可能短的時間內(nèi)研究、制定出具體搶險方案。6.4.4一般情況下,可采取的搶救措施
6.4.4.1坍塌、冒頂事故搶險前,應(yīng)先檢查事故地點是否已經(jīng)安全,當(dāng)確認(rèn)無危險后,方可實施搶救,否則應(yīng)先采取撐、頂、噴射速凝混凝土等可靠的加固支護(hù)措施,確保搶險人員的安全。
6.4.4.2如有施工人員被困在洞內(nèi),而搶救需要較長時間時,在可能條件下,必須盡快予以通風(fēng)、排水、供給水和食物,避免被困人員因缺氧、缺水、淹溺而危及生命安全。
6.4.4.3搶救被土體掩埋的傷員,不得使用機(jī)械、工具,應(yīng)人工清除,避免對傷員造成二次傷害。
6.4.4.4突發(fā)大量涌水、涌泥、透水事故時,迅速組織大功率污水泵、泥漿泵等抽水設(shè)備進(jìn)行抽水,同時組織潛水員進(jìn)入深水區(qū)進(jìn)行搜救,發(fā)現(xiàn)遇難人員及時救出。
6.4.4.5發(fā)生有害氣體中毒或瓦斯爆炸事故,應(yīng)迅速組織大功率風(fēng)機(jī)對隧道進(jìn)行通風(fēng),同時迅速組織救援人員,戴上防毒面具,進(jìn)入隧道救出受傷人員。對隧道內(nèi)有毒氣體進(jìn)行監(jiān)測,查明有毒氣體性質(zhì)及濃度,必須確認(rèn)氣體濃度在0.5%以下時方可正常進(jìn)入隧道。6.4.4.6現(xiàn)場對傷員應(yīng)迅速采取供氧、人工呼吸、止血等自救措施,以使傷害降低到最低限度。在急救醫(yī)生到來后(或?qū)麊T直接送達(dá)就近醫(yī)院后),應(yīng)將傷員受傷原因和已經(jīng)采取的救護(hù)措施詳細(xì)告訴醫(yī)生。6.5應(yīng)急搶險救援工作需地方部門配合時,各級應(yīng)急指揮機(jī)構(gòu)應(yīng)在濟(jì)鐵公司應(yīng)急領(lǐng)導(dǎo)小組的統(tǒng)一領(lǐng)導(dǎo)下,與“110”應(yīng)急聯(lián)動中心、公安、衛(wèi)生、消防、民政等政府有關(guān)部門及時聯(lián)系,密切合作,共同開展應(yīng)急搶險救援工作。6.6宣傳報道
在應(yīng)急領(lǐng)導(dǎo)小組的領(lǐng)導(dǎo)下,宣傳組具體負(fù)責(zé)事故的信息和新聞發(fā)布,確保信息準(zhǔn)確、及時傳遞,并根據(jù)國家有關(guān)法律法規(guī)的規(guī)定向社會公布。6.7現(xiàn)場保護(hù)
現(xiàn)場總指揮在組織自救的同時,應(yīng)派人保護(hù)現(xiàn)場,為今后的事故調(diào)查處理提供真實依據(jù)。7 善后處置
根據(jù)上級主管部門的要求,盡快對事故現(xiàn)場進(jìn)行清理,采取切實可行的防范措施,避免類似的事故再次發(fā)生,并積極做好傷亡人員的善后處理工作,盡快恢復(fù)生產(chǎn),減少因事故造成的損失。8 應(yīng)急保障 8.l宣傳教育
南華、華泉、華北路站要有計劃、有目的、有針對性地開展事故預(yù)防知識和應(yīng)急措施的宣傳,增強(qiáng)事故的防范意識,提高防范和應(yīng)急反應(yīng)能力。8.2通信與信息保障
依托現(xiàn)有的有線、無線通信系統(tǒng)和互聯(lián)網(wǎng)系統(tǒng),形成應(yīng)急通訊保障系統(tǒng),確保應(yīng)急期間相關(guān)信息及時、準(zhǔn)確、可靠地傳輸和有效實施指揮。
8.3物資設(shè)備保障 各區(qū)間隧道施工項目必須根據(jù)各自項目特點,配備必要的救援器材和設(shè)備,建立設(shè)備器材清單。如大型機(jī)械設(shè)備、物料配備困難,不能滿足可能的應(yīng)急救援需要的,應(yīng)當(dāng)就近聯(lián)系地方或其他單位,建立起資源信息庫,確保應(yīng)急時可以快速調(diào)用。9 應(yīng)急結(jié)束
9.1應(yīng)急領(lǐng)導(dǎo)小組根據(jù)事故搶險救援工作進(jìn)展和結(jié)束情況,及時向上級報告。
9.2應(yīng)急狀態(tài)結(jié)束后,應(yīng)急領(lǐng)導(dǎo)小組組織各有關(guān)部門、單位,及時作出書面報告。書面報告的基本內(nèi)容是:事故發(fā)生及搶險救援經(jīng)過;事故原因;事故造成的后果,包括傷亡人員情況及經(jīng)濟(jì)損失等;應(yīng)急預(yù)案效果及評估情況;應(yīng)吸取的經(jīng)驗教訓(xùn)等。10 事故調(diào)查處理
10.1按照《中鐵十局集團(tuán)公司傷亡事故調(diào)查處理辦法》、《中鐵十局濟(jì)鐵公司安全生產(chǎn)事故應(yīng)急響應(yīng)及救援預(yù)案》有關(guān)規(guī)定進(jìn)行調(diào)查處理。
10.2 調(diào)查取證組進(jìn)行初步調(diào)查取證,并參加政府或上級組織的事故聯(lián)合調(diào)查組,在調(diào)查取證工作結(jié)束后,要盡快寫出事故調(diào)查報告,如實、完整、及時送交事故調(diào)查領(lǐng)導(dǎo)小組。
10.3 事故調(diào)查領(lǐng)導(dǎo)小組根據(jù)事故調(diào)查報告,本著“四不放過”的原則,查清事故原因,落實事故責(zé)任,監(jiān)督制定和落實糾正預(yù)防措施,對責(zé)任單位、責(zé)任人進(jìn)行處分、處罰,編寫事故調(diào)查分析報告,并按規(guī)定上報上級單位和地方政府。11 與相關(guān)應(yīng)急預(yù)案的銜接
11.1本預(yù)案以《中鐵十局濟(jì)鐵公司安全生產(chǎn)事故應(yīng)急響應(yīng)及救援預(yù)案》為基礎(chǔ),針對隧道施工安全事故特點而制定,以提高隧道施工安全事故應(yīng)急響應(yīng)的快速性和可實施性。