第一篇:鋼筋混凝土框架畢業(yè)設(shè)計(jì)
鋼筋混凝土框架畢業(yè)設(shè)計(jì)
作者:月月
下載:6 次
上傳時(shí)間:2007-10-11
文件大?。?301k
推薦人:yueyue1983(已傳論文 3 套)
簡介: 本設(shè)計(jì)的題目是濰坊假日酒店,它是一座位于濰坊市經(jīng)濟(jì)技術(shù)開發(fā)區(qū)的三星級(jí)賓館,該建筑的1、2層為公共活動(dòng)部分,3~8層為客房部分,結(jié)構(gòu)形式為混凝土框架結(jié)構(gòu)。整體來講,設(shè)計(jì)過程分為三個(gè)部分。
1.建筑設(shè)計(jì):包括平面布局、立面造型設(shè)計(jì),除此之外還考慮了人流疏散、消防、防火、采光、通風(fēng)等各方面。2.結(jié)構(gòu)設(shè)計(jì):首先進(jìn)行結(jié)構(gòu)的選型,然后進(jìn)行內(nèi)力計(jì)算,內(nèi)力計(jì)算包括水平荷載以及豎向荷載的計(jì)算,荷載計(jì)算完畢就開始進(jìn)行樓板、框架柱、樓梯以及基礎(chǔ)的配筋計(jì)算。3.施工組織設(shè)計(jì):首先我計(jì)算了工程的工程量以及勞動(dòng)量,然后開始確定施工方案、施工流程、施工機(jī)械的選擇以及施工過程中應(yīng)該注意的事項(xiàng)。最后擬訂了施工進(jìn)度以及施工平面布置。關(guān)鍵詞:建筑設(shè)計(jì),簡介: 本設(shè)計(jì)的題目是濰坊假日酒店,它是一座位于濰坊市經(jīng)濟(jì)技術(shù)開發(fā)區(qū)的三星級(jí)賓館,該建筑的1、2層為公共活動(dòng)部分,3~8層為客房部分,結(jié)構(gòu)形式為混凝土框架結(jié)構(gòu)。整體來講,設(shè)計(jì)過程分為三個(gè)部分。
1.建筑設(shè)計(jì):包括平面布局、立面造型設(shè)計(jì),除此之外還考慮了人流疏散、消防、防火、采光、通風(fēng)等各方面。2.結(jié)構(gòu)設(shè)計(jì):首先進(jìn)行結(jié)構(gòu)的選型,然后進(jìn)行內(nèi)力計(jì)算,內(nèi)力計(jì)算包括水平荷載以及豎向荷載的計(jì)算,荷載計(jì)算完畢就開始進(jìn)行樓板、框架柱、樓梯以及基礎(chǔ)的配筋計(jì)算。3.施工組織設(shè)計(jì):首先我計(jì)算了工程的工程量以及勞動(dòng)量,然后開始確定施工方案、施工流程、施工機(jī)械的選擇以及施工過程中應(yīng)該注意的事項(xiàng)。最后擬訂了施工進(jìn)度以及施工平面布置。關(guān)鍵詞:建筑設(shè)計(jì),結(jié)構(gòu)設(shè)計(jì),施工組織設(shè)計(jì)關(guān)鍵字:混凝土,框架,結(jié)構(gòu)設(shè)計(jì),施工組織設(shè)計(jì)
第二篇:畢業(yè)設(shè)計(jì)開題報(bào)告4-鋼筋混凝土多層、多跨框架軟件開發(fā).
畢業(yè)設(shè)計(jì)開題報(bào)告4-鋼筋混凝土多層、多跨框架軟件開發(fā)
1.課題名稱:
鋼筋混凝土多層、多跨框架軟件開發(fā) 2.項(xiàng)目研究背景:
所要編寫的結(jié)構(gòu)程序是混凝土的框架結(jié)構(gòu)的設(shè)計(jì),建筑指各種房屋及其附屬的構(gòu)筑物。建筑結(jié)構(gòu)是在建筑中,由若干構(gòu)件,即組成結(jié)構(gòu)的單元如梁、板、柱等,連接而構(gòu)成的能承受作用(或稱荷載)的平面或空間體系。
編寫算例使用建設(shè)部最新出臺(tái)的《混凝土結(jié)構(gòu)設(shè)計(jì)規(guī)范》gb50010-2002,該規(guī)范與原混凝土結(jié)構(gòu)設(shè)計(jì)規(guī)范gbj10-89相比,新增內(nèi)容約占15%,有重大修訂的內(nèi)容約占35%,保持和基本保持原規(guī)范內(nèi)容的部分約占50%,規(guī)范全面總結(jié)了原規(guī)范發(fā)布實(shí)施以來的實(shí)踐經(jīng)驗(yàn),借鑒了國外先進(jìn)標(biāo)準(zhǔn)技術(shù)。3.項(xiàng)目研究意義:
建筑中,結(jié)構(gòu)是為建筑物提供安全可靠、經(jīng)久耐用、節(jié)能節(jié)材、滿足建筑功能的一個(gè)重要組成部分,它與建筑材料、制品、施工的工業(yè)化水平密切相關(guān),對發(fā)展新技術(shù)。新材料,提高機(jī)械化、自動(dòng)化水平有著重要的促進(jìn)作用。
由于結(jié)構(gòu)計(jì)算牽扯的數(shù)學(xué)公式較多,并且所涉及的規(guī)范和標(biāo)準(zhǔn)很零碎。并且計(jì)算量非常之大,近年來,隨著經(jīng)濟(jì)進(jìn)一步發(fā)展,城市人口集中、用地緊張以及商業(yè)競爭的激烈化,更加劇了房屋設(shè)計(jì)的復(fù)雜性,許多多高層建筑不斷的被建造。這些建筑無論從時(shí)間上還是從勞動(dòng)量上,都客觀的需要計(jì)算機(jī)程序的輔助設(shè)計(jì)。這樣,結(jié)構(gòu)軟件開發(fā)就顯得尤為重要。
一棟建筑的結(jié)構(gòu)設(shè)計(jì)是否合理,主要取決于結(jié)構(gòu)體系、結(jié)構(gòu)布置、構(gòu)件的截面尺寸、材料強(qiáng)度等級(jí)以及主要機(jī)構(gòu)構(gòu)造是否合理。這些問題已經(jīng)正確解決,結(jié)構(gòu)計(jì)算、施工圖的繪制、則是另令人辛苦的具體程序設(shè)計(jì)工作了,因此原來在學(xué)校使用的手算方法,將被運(yùn)用到具體的程序代碼中去,精力就不僅集中在怎樣利用所學(xué)的結(jié)構(gòu)知識(shí)來設(shè)計(jì)出做法,還要想到如何把這些做法用代碼來實(shí)現(xiàn),4.文獻(xiàn)研究概況
在不同類型的結(jié)構(gòu)設(shè)計(jì)中有些內(nèi)容是一樣的,做框架結(jié)構(gòu)設(shè)計(jì)時(shí)關(guān)鍵是要減少漏項(xiàng)、減少差錯(cuò),計(jì)算機(jī)也是如此的。
建筑結(jié)構(gòu)設(shè)計(jì)統(tǒng)一標(biāo)準(zhǔn)(gbj68-84)該標(biāo)準(zhǔn)是為了合理地統(tǒng)一各類材料的建筑結(jié)構(gòu)設(shè)計(jì)的基本原則,是制定工業(yè)與民用建筑結(jié)構(gòu)荷載規(guī)范、鋼結(jié)構(gòu)、薄壁型鋼結(jié)構(gòu)、混凝土結(jié)構(gòu)、砌體結(jié)構(gòu)、木結(jié)構(gòu)等設(shè)計(jì)規(guī)范以及地基基礎(chǔ)和建筑抗震等設(shè)計(jì)規(guī)
范應(yīng)遵守的準(zhǔn)則,這些規(guī)范均應(yīng)按本標(biāo)準(zhǔn)的要求制定相應(yīng)的具體規(guī)定。制定其它土木工程結(jié)構(gòu)設(shè)計(jì)規(guī)范時(shí),可參照此標(biāo)準(zhǔn)規(guī)定的原則。本標(biāo)準(zhǔn)適用于建筑物(包括一般構(gòu)筑物)的整個(gè)結(jié)構(gòu),以及組成結(jié)構(gòu)的構(gòu)件和基礎(chǔ);適用于結(jié)構(gòu)的使用階段,以及結(jié)構(gòu)構(gòu)件的制作、運(yùn)輸與安裝等施工階段。本標(biāo)準(zhǔn)引進(jìn)了現(xiàn)代結(jié)構(gòu)可靠性設(shè)計(jì)理論,采用以概率理論為基礎(chǔ)的極限狀態(tài)設(shè)計(jì)方法分析確定,即將各種影響結(jié)構(gòu)可靠性的因素都視為隨機(jī)變量,使設(shè)計(jì)的概念和方法都建立在統(tǒng)計(jì)數(shù)學(xué)的基礎(chǔ)上,并以主要根據(jù)統(tǒng)計(jì)分析確定的失效概率來度量結(jié)構(gòu)的可靠性,屬于“概率設(shè)計(jì)法”,這是設(shè)計(jì)思想上的重要演進(jìn)。這也是當(dāng)代國際上工程結(jié)構(gòu)設(shè)計(jì)方法發(fā)展的總趨勢,而我國在設(shè)計(jì)規(guī)范(或標(biāo)準(zhǔn))中采用概率極限狀態(tài)設(shè)計(jì)法是迄今為止采用最廣泛的國家。
結(jié)構(gòu)的作用效應(yīng) 常見的作用效應(yīng)有: 1.內(nèi)力。
軸向力,即作用引起的結(jié)構(gòu)或構(gòu)件某一正截面上的法向拉力或壓力; 剪力,即作用引起的結(jié)構(gòu)或構(gòu)件某一截面上的切向力; 彎矩,即作用引起的結(jié)構(gòu)或構(gòu)件某一截面上的內(nèi)力矩;
扭矩,即作用引起的結(jié)構(gòu)或構(gòu)件某一截面上的剪力構(gòu)成的力偶矩。2.應(yīng)力。如正應(yīng)力、剪應(yīng)力、主應(yīng)力等。
3.位移。作用引起的結(jié)構(gòu)或構(gòu)件中某點(diǎn)位變(線位移)或某線段方向的改變(角位移)。
4.撓度。構(gòu)件軸線或中面上某點(diǎn)在彎短作用平面內(nèi)垂直于軸線或中面的線位移。5.變形。作用引起的結(jié)構(gòu)或構(gòu)件中各點(diǎn)間的相對位移。變形分為彈性變形和塑性變形。
6.應(yīng)變:如線應(yīng)變、剪應(yīng)變和主應(yīng)變等。
極限狀態(tài) 整個(gè)結(jié)構(gòu)或結(jié)構(gòu)的一部分超過某一特定狀態(tài)就不能滿足設(shè)計(jì)規(guī)定的某一功能要求,此特定狀態(tài)稱為該功能的極限狀態(tài)。極限狀態(tài)可分為兩類:
1.承載能力極限狀態(tài)。結(jié)構(gòu)或結(jié)構(gòu)構(gòu)件達(dá)到最大承載能力或達(dá)到不適于繼續(xù)承載的變形的極限狀態(tài):
(1)整個(gè)結(jié)構(gòu)或結(jié)構(gòu)的一部分作為剛體失去平衡(如傾覆等);
(2)結(jié)構(gòu)構(gòu)件或連接因材料強(qiáng)度被超過而破壞(包括疲勞破壞),或因過度的塑性變形而不適于繼續(xù)承載;(3)結(jié)構(gòu)轉(zhuǎn)變?yōu)闄C(jī)動(dòng)體系;
(4)結(jié)構(gòu)或結(jié)構(gòu)構(gòu)件喪失穩(wěn)定(如壓屈等)。
2.正常使用極限狀態(tài)。結(jié)構(gòu)或結(jié)構(gòu)構(gòu)件達(dá)到使用功能上允許的某一限值的極限狀態(tài)。出現(xiàn)下列狀態(tài)之一時(shí),即認(rèn)為超過了正常使用極限狀態(tài):(1)影響正常使用或外觀的變形;
(2)影響正常使用或耐久性能的局部損壞(包括裂縫);(3)影響正常使用的振動(dòng);(4)影響正常使用的其它特定狀態(tài)。
結(jié)構(gòu)設(shè)計(jì)的基本任務(wù),是在結(jié)構(gòu)的可靠與經(jīng)濟(jì)之間選擇一種合理的平衡,力求以最低的代價(jià),使所建造的結(jié)構(gòu)在規(guī)定的條件下和規(guī)定的使用期限內(nèi),能滿足預(yù)定的安全性、適用性和耐久性等功能要求。為達(dá)到這個(gè)目的,人們采用過多種設(shè)計(jì)方法。以現(xiàn)代觀點(diǎn)看,可劃分為定值設(shè)計(jì)法和概率設(shè)計(jì)法兩大類。
1.定值設(shè)計(jì)法。將影響結(jié)構(gòu)可靠度的主要因素(如荷載、材料強(qiáng)度、幾何參數(shù)、計(jì)算公式精度等)看作非隨機(jī)變量,而且采用以經(jīng)驗(yàn)為主確定的安全系數(shù)來度量結(jié)構(gòu)可靠性的設(shè)計(jì)方法,即確定性方法。此方法要求任何情況下結(jié)構(gòu)的荷載效應(yīng)s(內(nèi)力、變形、裂縫寬度等)不應(yīng)大于結(jié)構(gòu)抗力r(強(qiáng)度、剛度、抗裂度等),即s≤r。在20世紀(jì)70年代中期前,我國和國外主要都采用這種方法。
2.概率設(shè)計(jì)法:將影響結(jié)構(gòu)可靠度的主要因素看作隨機(jī)變量,而且采用以統(tǒng)計(jì)為主確定的失效概率或可靠指標(biāo)來度量結(jié)構(gòu)可靠性的設(shè)計(jì)方法,即非確定性方法。此方法要求按概率觀念來設(shè)計(jì)結(jié)構(gòu),也就是出現(xiàn)結(jié)構(gòu)荷載效應(yīng)3大于結(jié)構(gòu)抗力r(s>r)的概率應(yīng)小于某個(gè)可以接受的規(guī)定值。這種方法是20世紀(jì)40年代提出來的,至70年代后期在國際上已進(jìn)入實(shí)用階段。我國自80年代中期,結(jié)構(gòu)設(shè)計(jì)方法開始由定值法向概率法過渡。面向?qū)ο缶幊?/p>
使創(chuàng)建windows程序較為容易的關(guān)鍵技術(shù)是面向?qū)ο缶幊?,或oop。這種技術(shù)可以創(chuàng)建可重用組建,它是程序的組成模塊。幾個(gè)定義
控件 提供程序可見界面的可重用對象。控件的示例有文本框、標(biāo)簽和命令按鈕。事件 由用戶或操作系統(tǒng)引發(fā)的動(dòng)作。事件的示例有擊鍵、單擊鼠標(biāo)、一段時(shí)間的限制,或從端口接收數(shù)據(jù)。
方法 嵌入在對象定義中的程序代碼,它定義對象怎樣處理信息并響應(yīng)某事件。例如,數(shù)據(jù)庫對象有打開紀(jì)錄集并從一個(gè)記錄移動(dòng)到另一個(gè)記錄的方法。對象 程序的基本元素,它含有定義其特征的屬性,定義其任務(wù)和識(shí)別它可以響應(yīng)的事件的方法??丶痛绑w是visual basic中所有對象的示例。過程 為完成任務(wù)而編寫的代碼段。過程通常用于響應(yīng)特定的事件。
屬性 對象的特征,如尺寸、位置、顏色或文本。屬性決定對象的外觀,有時(shí)也決定對象的行為。屬性也用于為對象提供數(shù)據(jù)和從對象取回信息。5.設(shè)計(jì)主要內(nèi)容
本軟件適用于現(xiàn)澆鋼筋混凝土多層、多跨的框架的設(shè)計(jì)。畢業(yè)設(shè)計(jì)要完成的工作包括:
1.平面鋼架分析程序的改造
對結(jié)構(gòu)力學(xué)教研室版平面鋼架分析程序進(jìn)行修改和補(bǔ)充。要求:
(1 編寫自動(dòng)生成節(jié)點(diǎn)坐標(biāo)和單元節(jié)點(diǎn)編號(hào)的程序,或以圖形方式輸入計(jì)算簡圖。(2 修改程序,使之適合多工況內(nèi)力計(jì)算;(3 根據(jù)輸入、輸出數(shù)據(jù)的特點(diǎn),設(shè)計(jì)適當(dāng)?shù)娜藱C(jī)界面。輸出應(yīng)可選的顯示各構(gòu)件端力和內(nèi)力圖。2.編寫鋼筋混凝土多層多跨框架機(jī)構(gòu)的構(gòu)件設(shè)計(jì)程序
(1 根據(jù)有關(guān)的規(guī)范,應(yīng)明確計(jì)算的各種荷載(恒載、樓屋面活載、風(fēng)荷載和地震作用等)的計(jì)算方法,在次基礎(chǔ)上編寫自動(dòng)生成各種荷載作用下的結(jié)點(diǎn)荷載和單元荷載的程序。
地震作用按底部剪力法確定。自振周期用經(jīng)驗(yàn)公式確定。
(2 計(jì)算各種荷載單獨(dú)作用時(shí)框架各桿件的內(nèi)力。計(jì)算結(jié)構(gòu)存放在各自的桿端力(隨機(jī))文件中。
對豎向荷載下的梁端彎距進(jìn)行塑性調(diào)幅。
(3 在(2中產(chǎn)生的桿端力文件基礎(chǔ)上,分別計(jì)算各種可能的荷載組合下,梁、柱控制截面的內(nèi)力。計(jì)算結(jié)果存放在適當(dāng)?shù)奈募小?/p>
(4 從(3生成的文件中選出最不利組合,同時(shí)給出截面配筋。梁、柱截面配筋的確定應(yīng)考慮抗震設(shè)計(jì)的要求。
(5 部分編程較熟練的同學(xué)可根據(jù)計(jì)算結(jié)果和構(gòu)造規(guī)定,用auto-cad vba 繪制梁、柱配筋圖。5.成果形式
本畢業(yè)設(shè)計(jì)的成果應(yīng)包括:
1.可運(yùn)行的、并能給出正確計(jì)算結(jié)果的源程序
在存放源程序的軟盤中,應(yīng)至少有一個(gè)算例的數(shù)據(jù)文件,可在基本不需另外鍵入數(shù)據(jù)的前提下,顯示正確地運(yùn)行結(jié)果。2.軟件使用手冊
這是為用戶準(zhǔn)備的關(guān)于軟件使用方法、操作步驟和其他必要的文字材料。3.軟件說明書
這是軟件作者的工作檔案,是軟件維護(hù)的基本資料。其中應(yīng)包括:
(1 軟件所依據(jù)的工作檔案、力學(xué)和工程結(jié)構(gòu)模型的較為詳細(xì)的描述,主要的計(jì)算公式及其使用的符號(hào)的含義,重要算法的文字說明:
(2 程序的結(jié)構(gòu):模塊的劃分的情況、各模塊相互之間的關(guān)系及各模塊的功能;(3 帶有較為詳細(xì)的注釋的源程序文本。其中應(yīng)注明各標(biāo)識(shí)符的含義(盡可能的采用通用公式中的符號(hào))。各程序段的功能、相應(yīng)的數(shù)學(xué)公式和特殊算法的說明;(4 為使他人根據(jù)軟件說明書讀懂你的程序所必需的其他資料。(5 部分編程較熟練的同學(xué)可遞交梁、柱配筋圖紙一張。4.對自己所編程序的評(píng)價(jià)
(1 對算例計(jì)算結(jié)果的合理性進(jìn)行必要的分析;
(2 總結(jié)軟件設(shè)計(jì)過程中的經(jīng)驗(yàn)和及教訓(xùn),提出設(shè)計(jì)改進(jìn)意見。以上各項(xiàng)資料處源程序文本以軟盤形式提交外,其余均用計(jì)算機(jī)打印。6.進(jìn)度計(jì)劃
第一周 畢業(yè)實(shí)習(xí),參觀工程,收集資料。
第二周 需求分析:描述計(jì)算機(jī)模型,編些初步的軟件說明書。第三周 軟件設(shè)計(jì):選擇模塊劃分的方案
第四周 模塊設(shè)計(jì):數(shù)據(jù)輸入界面設(shè)計(jì)(梁柱截面數(shù)據(jù))或 數(shù)據(jù)輸入界面設(shè)計(jì)(可視化圖形輸入)第五周 數(shù)據(jù)輸入界面設(shè)計(jì)(框架數(shù)據(jù)、附加荷載)
第六周 模塊設(shè)計(jì):荷載計(jì)算(恒載、活載),相應(yīng)的內(nèi)力計(jì)算 第七周 荷載計(jì)算(風(fēng)荷載、地震作用),相應(yīng)的內(nèi)力計(jì)算 第八周 模塊設(shè)計(jì):梁配筋計(jì)算 第九周 梁荷載組合,確定梁配筋 第十周 梁荷載組合,確定梁配筋 第十一周 模塊設(shè)計(jì):柱配筋計(jì)算 第十二周 柱荷載組合,確定柱配筋 第十三周 柱荷載組合,確定柱配筋
第十四周 軟件測試 或用autocad vba 繪制梁、柱配筋圖; 第十五周 軟件測試
第十六周 整理源程序,編寫軟件說明數(shù)和用戶手冊
第十七周 編寫軟件說明書和用戶手冊,形成畢業(yè)設(shè)計(jì)全部文件,準(zhǔn)備答辯。第十八周 畢業(yè)答辯上一頁
第三篇:鋼筋混凝土框架涵現(xiàn)澆施工工藝
鋼筋混凝土框架涵現(xiàn)澆施工工藝
一、適用范圍
根據(jù)本標(biāo)段涵洞工程特點(diǎn)以及工期要求,對所有的框架涵均采用現(xiàn)澆施工。
二、鋼筋砼框架涵現(xiàn)澆施工工藝及方法 ⑴工藝流程
鋼筋砼框架涵現(xiàn)澆施工工藝流程見圖1。
測量定位基礎(chǔ)開挖、處理鋼筋試驗(yàn)鋼筋加工運(yùn)輸模板設(shè)計(jì)加工墊層施工底板鋼筋綁扎底板模板安裝底板砼施工模板設(shè)計(jì)加工鋼筋試驗(yàn)鋼筋加工運(yùn)輸模板設(shè)計(jì)加工立邊墻內(nèi)模及頂板支架立頂板模板邊墻及頂板鋼筋綁扎邊墻外模安裝邊墻及頂板砼灌注施工模板拆除防水層施工過渡段施工涵口附屬工程施工鋼筋模板驗(yàn)收砼拌制砼試塊制作、檢測砼配合比設(shè)計(jì)鋼筋模板驗(yàn)收砼拌制砼試塊制作、檢測砼配合比設(shè)計(jì)
圖1 框架涵現(xiàn)澆施工工藝流程圖
⑵工藝方法 ①軟基加固處理
本標(biāo)段的框架涵部分處于路基軟基處理段上,軟基處理主要采用φ0.5m的CFG樁,其具體施工方法、工藝同路基加固與邊坡防護(hù)工程的施工方法。
②基礎(chǔ)施工
根據(jù)框架涵施工安排,在地基處理完成且達(dá)到設(shè)計(jì)要求后,再進(jìn)行開挖。基礎(chǔ)開挖處理完畢后按施工圖紙進(jìn)行換填砂夾碎石墊層施工,然后測量定位,進(jìn)行底板鋼筋的綁扎以及模板的安裝。
在基礎(chǔ)施工過程中,于基坑四周設(shè)擋水埝和臨時(shí)排水溝,下雨前,采用防水篷布覆蓋基坑,防止雨水進(jìn)入基坑,浸泡地基,雨天不進(jìn)行基坑開挖和基礎(chǔ)砼澆筑。
③涵體鋼筋砼施工 箱體砼施工先進(jìn)行水質(zhì)化驗(yàn)和原材料試驗(yàn),根據(jù)氣候條件摻加外加劑,選擇施工配合比。在基坑開挖及處理完成后,經(jīng)檢驗(yàn)合格簽證,即可施工墊層,現(xiàn)場綁扎鋼筋。底板鋼筋綁扎必須將兩側(cè)邊墻的豎筋一塊綁扎到位,采取適宜的固定底板上、下層鋼筋及邊墻鋼筋的定位措施,做好底板下層鋼筋的支墊,保證底層鋼筋的保護(hù)層厚度。底板模板比較簡單,但必須注意箱內(nèi)邊墻底部斜角模板設(shè)置準(zhǔn)確,要有可靠的定位設(shè)施,保證灌注砼中不發(fā)生偏位,給上部立模造成困難或產(chǎn)生質(zhì)量缺陷。砼施工分兩部分進(jìn)行,第一部分灌注底板及邊墻腳斜坡體部分,第二部分則一次澆注邊墻及頂板。砼采用拌和站集中拌制,滑槽入模,插入式振搗器振搗。斜坡段邊墻的灌注,滯后于底板約1.0~1.5小時(shí),即待底板砼沉凝后于初凝前再接灌上部砼,以免砼灌注搗固時(shí),砼從底部隆起,造成施工困難。底板砼灌注后,要注意控制箱內(nèi)板面標(biāo)高及抹平收漿,進(jìn)行二次壓面,并及時(shí)遮蓋,以防砼水份蒸發(fā)產(chǎn)生塑性開裂,同時(shí),及時(shí)進(jìn)行澆水養(yǎng)護(hù),防止砼早期干縮而產(chǎn)生裂紋。
邊墻及箱頂砼采取一次性澆注。在底板砼強(qiáng)度達(dá)到規(guī)范要求后,即可進(jìn)行測量復(fù)核及放樣,安立墻內(nèi)模及箱頂?shù)装澹潴w內(nèi)模采用竹膠模板,按模板設(shè)計(jì)尺寸下料制做加工,做到大塊拼縫嚴(yán)密、板面平整。內(nèi)模支架采用碗扣式支架,縱橫剪刀撐加固,在支架頂部鋪設(shè)方木和底模。
內(nèi)模安立后,即可綁扎邊墻及頂板鋼筋,頂板兩層鋼筋間設(shè)立支架體系,確保施工中頂層鋼筋不發(fā)生凹陷變位。鋼筋綁扎完畢并經(jīng)自檢,監(jiān)理復(fù)驗(yàn)合格、簽證后,即可安設(shè)外模。外模采用制式鋼模板,邊墻內(nèi)外模按砼灌注受力情況設(shè)置φ16拉桿,采用φ20塑料管防護(hù)拉桿,以確保所有拉桿均能拆除。
邊墻砼對稱灌注,并設(shè)串筒,使砼由串筒下灌,防止沖擊模板及砼離析,采用人工攤平,分層搗固。灌注到頂板部位后,對灌注進(jìn)行周密安排,防止產(chǎn)生施工冷縫,頂板灌注一次到位。對頂板頂面要嚴(yán)格控制標(biāo)高,及時(shí)抹平、收漿、遮蓋及防護(hù),防止頂面受到破損或開裂。
砼澆注完成后,及時(shí)并加強(qiáng)養(yǎng)護(hù),根據(jù)氣溫條件養(yǎng)生采用薄膜加草袋覆蓋蓄熱增溫養(yǎng)護(hù),確保砼強(qiáng)度正常增長。
為防止箱體因二次澆注在邊墻腳施工縫處滲漏,除對施工縫按規(guī)范要求認(rèn)真進(jìn)行處理外,在邊墻全長范圍內(nèi)埋設(shè)δ=3mm鋼板作為止水帶。
④涵體防水層的施工
箱體的邊墻及頂部防水層,是箱涵安全使用極其重要的設(shè)施,將按設(shè)計(jì)要求嚴(yán)格控制防水材料質(zhì)量和施工工藝,做到涂刷均勻、粘貼齊全、密貼、粘合良好、搭接嚴(yán)密、長度合格,并按要求認(rèn)真做好防水層的防護(hù)設(shè)施,確保使用中不發(fā)生滲漏。
三、質(zhì)量偏差控制及糾正措施
1、鋼筋混凝土框架涵施工應(yīng)符合現(xiàn)行《鐵路混凝土與砌體工程施工規(guī)范》(TB10210)的有關(guān)規(guī)定。
2、涵身混凝土澆筑可分為兩階段施工。先澆筑底板(包括下梗肋),當(dāng)?shù)装寤炷翉?qiáng)度達(dá)到設(shè)計(jì)強(qiáng)度的50%后,再施工中、邊墻及頂板混凝土。當(dāng)澆筑的混凝土量較大,兩階段施工有困難時(shí),也可以分三階段施工,但中、邊墻的施工縫不應(yīng)設(shè)在同一水平面上。施工縫必須按有關(guān)規(guī)定嚴(yán)格處理。
3、頂板底模拆除時(shí),混凝土強(qiáng)度應(yīng)符合設(shè)計(jì)要求。
第四篇:鋼筋混凝土框架結(jié)構(gòu)設(shè)計(jì)的幾點(diǎn)心得體會(huì)
鋼筋混凝土框架結(jié)構(gòu)設(shè)計(jì)的幾點(diǎn)心得體會(huì)
張永濤 姬廣東
(山東省冶金設(shè)計(jì)院有限責(zé)任公司 萊蕪 271104)
摘要:在鋼筋混凝土結(jié)構(gòu)設(shè)計(jì)中,每個(gè)設(shè)計(jì)者的經(jīng)驗(yàn)不同,對規(guī)范的理解不同,所以在處理某個(gè)設(shè)計(jì)問題時(shí),也就會(huì)采取不同的處理方法。對于鋼筋混凝土框架結(jié)構(gòu)設(shè)計(jì)中,基礎(chǔ)、梁、柱、板四部分應(yīng)注意的問題,分別提出了幾點(diǎn)看法。關(guān)鍵詞:結(jié)構(gòu)設(shè)計(jì)基礎(chǔ)梁柱板
現(xiàn)在越來越多的建筑物使用鋼筋混凝土結(jié)構(gòu),故鋼筋混凝土結(jié)構(gòu)在整個(gè)建筑市場起到越來越重要的地位。在鋼筋混凝土結(jié)構(gòu)設(shè)計(jì)中,每個(gè)設(shè)計(jì)者的經(jīng)驗(yàn)不同,對規(guī)范的理解不同,所以在處理某個(gè)設(shè)計(jì)問題時(shí),也就會(huì)采取不同的處理方法。在這十年的結(jié)構(gòu)設(shè)計(jì)工作中,本人也積累了一些經(jīng)驗(yàn),下面就鋼筋混凝土框架結(jié)構(gòu)設(shè)計(jì)中的基礎(chǔ)、梁、柱、板四部分,在設(shè)計(jì)時(shí)應(yīng)注意的問題,闡述一下個(gè)人觀點(diǎn)。1.基礎(chǔ)部分
1.1對于柱下擴(kuò)展基礎(chǔ)寬度較寬(大于4米)或地基不均勻及地基較軟時(shí)宜采用柱下條基。并應(yīng)考慮節(jié)點(diǎn)處基礎(chǔ)底面積雙向重復(fù)使用的不利因素,適當(dāng)加寬基礎(chǔ)。
1.2建筑地段較好,基礎(chǔ)埋深大于3米時(shí),應(yīng)建議甲方做地下室。當(dāng)?shù)鼗休d力滿足設(shè)計(jì)要求時(shí),地下室底板可不再外伸以利于防水。每隔30~40米設(shè)一后澆帶,并注明兩個(gè)月后用微膨脹混凝土澆注。設(shè)置地下室可降低地基的附加應(yīng)力,提高地基的承載力(尤其是在周圍有建筑時(shí)有用),減少地震作用對上部結(jié)構(gòu)的影響。不應(yīng)設(shè)局部地下室,且地下室應(yīng)有相同的埋深。
1.3地下室外墻為混凝土?xí)r,相應(yīng)的樓層處梁和基礎(chǔ)梁可取消。1.4抗震縫、伸縮縫在地面以下可不設(shè),連接處應(yīng)加強(qiáng)。但沉降縫兩側(cè)墻體基礎(chǔ)一定要分開。
1.5新建建筑物基礎(chǔ)不宜深于周圍已有基礎(chǔ)。如深于原有基礎(chǔ),其基礎(chǔ)間的凈距應(yīng)不少于基礎(chǔ)高差的2倍,否則應(yīng)打抗滑移樁,防止原有建筑的破壞。建筑層數(shù)相差較大時(shí),應(yīng)在層數(shù)較低的基礎(chǔ)方格中心的區(qū)域內(nèi)墊焦碴來調(diào)整基底附加應(yīng)力。
1.6獨(dú)立基礎(chǔ)偏心不能過大,必要時(shí)可與相近的基礎(chǔ)做成柱下條基。柱下條形基礎(chǔ)的底板偏心不能過大,必要時(shí)可作成三面支承一面自由板(類似筏基中間開
洞)。兩根柱的柱下條基的荷載重心和基礎(chǔ)底版的形心宜重合,基礎(chǔ)底板可做成梯形或臺(tái)階形,或調(diào)整挑梁兩端的出挑長度。
1.7獨(dú)立基礎(chǔ)的拉梁宜通長配筋,其下應(yīng)墊焦碴。拉梁頂標(biāo)高宜較高,否則底層墻體過高。
1.8底層內(nèi)隔墻一般不用做基礎(chǔ),可將地面的混凝土墊層局部加厚。1.9考慮到一般建筑沉降為鍋底形,結(jié)構(gòu)的整體彎曲和上部結(jié)構(gòu)與基礎(chǔ)的協(xié)同作用,頂、底板鋼筋應(yīng)拉通(多層的負(fù)筋可截?cái)?/2或1/3),且縱向基礎(chǔ)梁的底筋也應(yīng)拉通。
1.10基礎(chǔ)底板混凝土不宜大于C3O,一是沒用,二是容易出現(xiàn)裂縫。1.11基礎(chǔ)底面積不應(yīng)因地震附加力而過分加大,否則地震下安全了而常規(guī)情況下反而沉降差異較大,本末倒置。免費(fèi)論文下載中心 2.柱部分
2.1地上為圓柱時(shí),地下部分應(yīng)改為方柱,方便施工。圓柱縱筋根數(shù)最少為8根,箍筋用螺旋箍,并注明端部應(yīng)有一圈半的水平段。方柱箍筋應(yīng)使用井字箍,并按規(guī)范加密。角柱、樓梯間柱應(yīng)增大縱筋并全柱高加密箍筋。幼兒園不宜用方柱。2.2原則上柱的縱筋宜大直徑大間距,但間距不宜大于200。
2.3柱內(nèi)埋管,由于梁的縱筋錨入柱內(nèi),一般情況下僅在柱的四角才有條件埋設(shè)較粗的管。管截面面積占柱截面4%以下時(shí),可不必驗(yàn)算。柱內(nèi)不得穿暖氣管。2.4柱斷面不宜小于450×450,混凝土不宜小于C25,否則梁縱筋錨入柱內(nèi)的水平段不容易滿足0.45La的要求,不滿足時(shí)應(yīng)加橫筋;否則在梁柱節(jié)點(diǎn)處鋼筋太密,混凝土澆筑困難。異型柱結(jié)構(gòu),梁縱筋一排根數(shù)不宜過多,柱端部縱筋不宜過密,否則節(jié)點(diǎn)混凝土澆筑困難。當(dāng)有部分矩形柱部分異型柱時(shí),應(yīng)注意異型柱的剛度要和矩形柱相接近,不要相差太大。
2.5柱應(yīng)盡量采用高強(qiáng)度混凝土來滿足軸壓比的限制,減小斷面尺寸。2.6盡量避免短柱,短柱箍筋應(yīng)全高加密,短柱縱筋不宜過大。2.7考慮到豎向地震作用,柱子的軸壓比及配筋宜留有余地。
2.8獨(dú)立柱上或柱的中部(半層處)有挑梁時(shí),挑梁長度應(yīng)有限制。3.梁部分
3.1梁上有次梁處(包括挑梁端部)應(yīng)附加箍筋和吊筋,宜優(yōu)先采用附加箍筋。附加筋一般要有,但不應(yīng)絕對。規(guī)范說的清楚,位于梁下部或梁截面高度范圍內(nèi)的集中荷載,應(yīng)全部由附加橫向鋼筋承擔(dān)。也就是說,位于梁上的集中力如梁上柱、梁上后做的梁如水箱下的墊梁不必加附加筋。位于梁下部的集中力應(yīng)加附加筋。但梁截面高度范圍內(nèi)的集中荷載可根據(jù)具體情況而定。當(dāng)主次梁截面相差不大,次梁荷載較大時(shí),應(yīng)加附加筋。當(dāng)主梁高度很高,次梁截面很小、荷載很小時(shí),如快接近板上附加暗梁,主梁可不加附加筋。還有當(dāng)主次梁截面均很大,如工藝要求形成的主次深梁,而荷載相對不大,主梁也可不加附加筋。
3.2當(dāng)外部梁跨度相差不大時(shí),梁高宜等高,尤其是外部的框架梁。當(dāng)梁底距外窗頂尺寸較小時(shí),宜加大梁高做至窗頂。外部框架梁盡量做成外皮與柱外皮平齊。梁也可偏出柱邊一較小尺寸。梁與柱的偏心可大于1/4柱寬,并宜小于1/3柱寬。
3.3梁上有次梁時(shí),應(yīng)避免次梁搭接在主梁的支座附近,否則應(yīng)考慮由次梁引起的主梁抗扭,或增加構(gòu)造抗扭縱筋和箍筋。當(dāng)采用現(xiàn)澆板時(shí),抗扭問題并不嚴(yán)重。
3.4原則上梁縱筋宜小直徑小間距,有利于抗裂,但應(yīng)注意鋼筋間距要滿足要求,并與梁的斷面相應(yīng)。箍筋按規(guī)定在梁端頭加密。布筋時(shí)應(yīng)將縱筋等距,箍筋肢距可不等。小斷面的連續(xù)梁或框架梁,上、下縱筋均應(yīng)采用同直徑的,盡量不在支座搭接。
3.5端部與框架梁相交或彈性支承在墻體上的次梁,梁端支座可按簡支考慮,但梁端箍筋應(yīng)加密。
3.6上反梁的板吊在梁底下,板荷載宜由箍筋承受,或適當(dāng)增大箍筋。梁支承偏心布置的墻時(shí)宜做下挑沿。
3.7挑梁宜作成等截面(大挑梁外露者除外)。與挑板不同,挑梁的自重占總荷載的比例很小,作成變截面不能有效減輕自重。變截面挑梁的箍筋,每個(gè)都不一樣,難以施工。變截面梁的撓度也大于等截面梁。挑梁端部有次梁時(shí),注意要附加箍筋或吊筋。一般挑梁根部不必附加斜筋,除非受剪承載力不足。對于大挑梁,梁的下部宜配置受壓鋼筋以減小撓度。挑梁配筋應(yīng)留有余地。免費(fèi)論文下載中心
3.8梁上開洞時(shí),不但要計(jì)算洞口加筋,更應(yīng)驗(yàn)算梁洞口下偏拉部分的裂縫寬度。梁從構(gòu)造上能保證不發(fā)生沖切破壞和斜截面受彎破壞。
3.9挑梁出挑長度小于梁高時(shí),應(yīng)按牛腿計(jì)算或按深梁構(gòu)造配筋。
3.10扁梁寬度不必過大,只要鋼筋能正常擺下及受剪滿足即可。因?yàn)樵趽隙扔?jì)算時(shí),梁寬對剛度影響不大,加寬一倍,撓度減小20%左右。相對來講,增大鋼筋更經(jīng)濟(jì),鋼筋加大一倍,撓度減小60%左右,同時(shí)梁的上筋應(yīng)大部分通長布置,以減小混凝土徐變對撓度的增大,如果上筋不小于下筋,撓度減小20%。3.11當(dāng)一寬框架梁托兩排間距較小的柱時(shí),可加一剛性挑梁,兩個(gè)柱支承在剛性挑梁的端頭。
3.12梁寬大于350時(shí),應(yīng)采用四肢箍。4.現(xiàn)澆板部分
4.1板的鋼筋宜采用大直徑大間距,但間距不大于200,間距盡量用200。(一般跨度小于6.6米的板的裂縫均可滿足要求)。板上下鋼筋間距宜相等,直徑可不同,但鋼筋直徑類型也不宜過多。
4.2相連幾個(gè)房間的同型號(hào)同間距板底鋼筋宜連通。
4.3配筋計(jì)算時(shí),可考慮塑性內(nèi)力重分布,將板上筋乘以0.8~0.9的折減系數(shù),將板下筋乘以1.1~1.2的放大系數(shù)。
——出處:《中國經(jīng)濟(jì)與管理科學(xué)》2009年第7期
Structure design of reinforced concrete frame
Zhang Yongtao Ji Guangdong(Shandong Province Metallurgical Design Institute Co., Ltd.Laiwu 271104)
Abstract: In the reinforced concrete structure design, each designer's experience is different, different understanding of norms, so in dealing with a certain design issues, it would take a different approach.For the design of reinforced concrete frame structure, foundations, beams, columns, boards should pay attention to the issue of four parts, respectively, made a few observations.Keywords: Structural design of foundation beam plate More and more buildings to use reinforced concrete structure, reinforced concrete structure and therefore the entire construction market play an increasingly important role.In the reinforced concrete structural design, each designer's experience is different, different understanding of norms, so in dealing with a certain design issues, it would take a different approach.In this decade, the structural design work, I have accumulated some experience, the following on the design of reinforced concrete frame structure, the foundation, beams, columns, panels of four parts in the design should pay attention to the problem, elaborate personal views.1.The fundamental elements of The expansion of the basis for the column width under a wide(greater than 4 meters)or the uneven ground and foundation should be adopted when compared with the soft base of the next column.And should consider the basis of node size at the end of a two-way repeated use of unfavorable factors, appropriate widening base.1.2 Building lot better basis for depth greater than 3 meters, should recommend to the Party to do the basement.Bearing capacity of the local base to meet the design requirements, the basement floor can be no overhang to facilitate water.Every 30 ~ 40 meters is located one after the pouring
zone, and indicate the two months after the pouring of concrete with micro-expansion.Setting the foundation of the basement can reduce the additional stress, improve the bearing capacity of foundations(especially in the construction around when useful)to reduce the role of the upper structure of the earthquake impact.Should not be any partial basement, and the basement should have the same depth.1.3 for the concrete basement wall, the corresponding floor beams and foundation beams at cancel.1.4 earthquake seam, expansion joints on the ground below may from time to set up, connections should be strengthened.However, the basis of settlement joint on both sides of the wall must be separated.The basis of 1.5 new buildings should not be darker than the surrounding existing basis.As deeply as the original foundation, based on the basis of inter-spacing of not less than 2 times the height difference, or to fight anti-sliding pile should be to prevent the destruction of the original building.Larger difference between the construction layers should be the basis of the lower layers within the region grid center ballast to adjust the base pad coke additional stress.1.6 Independence-based bias can not be too large, if necessary, the foundation made with similar articles under column base.Column strip foundation under the floor can not be too eccentric, if necessary, could be made on three sides, supporting one side of free(similar to the Raft-based intermediate open hole).Column 2 column article under the base load center of gravity and centroid-based bottom plate should overlap the foundation floor or stairs can be made into trapezoidal shape, or adjusting the length of cantilever beam at both ends of Chutiao.1.7 Independence-based pull-Liang Yi-length reinforcement, under which should focus ballast mat.Top elevation should pull high beam, or the bottom of the wall is too high.1.8 in the bottom wall generally do not have to do based on the concrete floor cushion can be partially thickened.1.9 Taking into account the general settlement of the bottom of the pot-shaped building, the structure of the overall bending and the upper structure and the basis of synergies, top and bottom reinforcement should be raton(multi-layer of negative reinforcement can be cut off 1 / 2 or 1 / 3), and the foundation beam bottom longitudinal reinforcement should also be raton.1.10 foundation slab of concrete should not be larger than C3O, one useless the second is prone to cracks.1.11 The foundation area should not unduly increase the earthquake additional force, otherwise the next earthquake safety, rather the contrary, the settlement, under normal circumstances are quite different cart before the horse.Reposted elsewhere in the paper for free download 2.Column part of the 2.1 on the ground for the cylinder, the underground portion should be replaced by square columns, to facilitate construction.Column longitudinal reinforcement root number at least 8, stirrup with spiral bands, and indicate the end of the horizontal segment should have a lap and a half.Square columns Tic-Tac-hoop stirrups should be used, in accordance with standard encryption.Corner column, stair column longitudinal reinforcement should be increased, and the whole column stirrups high encryption.Kindergarten should not use the square column.2.2 In principle, the vertical column reinforcement should large-diameter large spacing, but the pitch should not be larger than 200.2.3 Column pipe, due to the beam longitudinal reinforcement anchored into the column, the general only in the column under the conditions laid four corners have thick tube.Tube-sectional area of column cross section accounted for less than 4%, it can not checking.Column shall not clothing
trachea.2.4 column cross-section should not be less than 450 ??450, concrete should not be less than the C25, otherwise the beam longitudinal reinforcement anchored into the column level within the segment is not easy to satisfy the requirements of 0.45La, does not meet the horizontal bars should be added;otherwise reinforced beam-column nodes are too dense, concrete placement difficult.Special-shaped column structure, and beam longitudinal reinforcement should not be too much root number in a row and column longitudinal reinforcement ends should not be too dense, otherwise the node concrete placement difficult.When there is some part of the rectangular column-shaped columns, they should pay attention to special-shaped columns and rectangular column stiffness was similar and not that much difference.2.5 column should be using high-strength concrete to meet the axial load ratio limits, reduce the section size.2.6 try to avoid short columns, short columns stirrup should be full of high encryption, short column longitudinal reinforcement should not be too large.2.7 Taking into account the role of vertical earthquake, columns under axial compression ratio and reinforcement should leave some leeway.2.8 independent of the central column or columns(semi-floor office)are cantilever beam, the cantilever beam length should be limited.3.LIANG part of the 3.1 beam with sub-beam Department(including the cantilever beam ends)should be attached stirrups and hanging bars, should give priority to adopt additional stirrups.Additional tendons in general should be, but not absolute.A clear specification that is located in the lower beam or high beam within the scope of the concentrated load shall be borne entirely by additional transverse reinforcement.In other words, the concentration of power in the beam, such as beam columns, beams after the beam to do under
the pad-like water tanks do not have to add additional muscle.Is located in the lower beam of concentration should be added additional reinforcement.However, a high beam within the concentrated load can be determined according to specific circumstances.When the primary and secondary beam cross-section more or less, sub-beam load is large, additional reinforcement should be added.When the main beam at very high altitudes, sub-beam cross-section is very small, load is very small, such as the approach the board added the dark beam, main beam may from time to add additional muscle.There were significant when the primary and secondary beam, such as the process requires the formation of the primary and secondary deep beam, while the load is relatively small, the main beam or not to add additional muscle.3.2 when the external beam span or less, Liang Gao Yi high, especially outside the frame beam.When the beam away from the outer windows of the top end of small size, it is desirable to do to increase the beam window of a high top.As far as possible outside the framework of beams and columns made of skin skin flush.Liang-chu, may also be missed while a smaller size.Eccentric beam-column may be greater than 1 / 4 columns wide and appropriate less than 1 / 3 of column width.There are times when the beam 3.3 beam should avoid secondary beam overlap in the vicinity of the main beam of the bearing, otherwise, consideration should be given by the second torsion beam caused by the main beam, or increasing the longitudinal reinforcement and stirrup torsional structure.When using in-situ plate, the torsion problem is not serious.3.4 In principle, small-diameter beam longitudinal reinforcement should a small spacing is conducive to cracking, but it should be noted that reinforcement spacing to meet the requirements, and with the corresponding cross-section of beam.Stirrups at the end of the beam according to the provisions of the first encryption.Fabric reinforcement should be
equidistant longitudinal reinforcement, stirrups, etc.from time away from the limb.Small cross-section of a continuous beam or frame beams, the upper and lower longitudinal reinforcement should be using the same diameter as much as possible not to overlap bearings.3.5 end with the frame beams intersect, or elastic support at the wall on the sub-beams, simply supported beam end bearing may be considered, but the end of the beam stirrups should be encrypted.3.6 The panel of anti-beam suspended beneath the beam, plate load appropriate for the stirrups to bear, or an appropriate increase in stirrup.Eccentric arrangement of beams supporting the walls along the opportune time to do the next pick.3.7 pick Liang Yiross-section(large cantilever beam except those exposed).And pick a different panel to pick the beam weight ratio of the total load is small, ariable cross-section can not effectively reduce weight.Variable cross-section cantilever beam of the stirrups, each is different and difficult construction.Variable cross-section beam deflection is also greater than the other beam.Cantilever beam with secondary beam end, attention should be attached stirrups or hanging bars.Generally do not have to add the root of cantilever beam oblique muscle, unless the lack of shear strength.For large cantilever beam, the beam bottom reinforcement should configure the compression to reduce the deflection.Cantilever beam reinforcement should leave room for the.Reposted elsewhere in the paper for free download 3.8 beam openings, not only to calculate the hole reinforcement, hole should be checking under the partial pull-beam part of the crack width.Beams from the structure does not occur on the punching can guarantee the damage and oblique cross-section flexural damage.3.9 Chutiao cantilever beam is less than the length of beam is high, should be calculated or bracket structure reinforced by deep beams.3.10 flat-beam width not too large, as long as the steel can be placed
under the normal and shear can be met.Because the deflection calculation, the beam width on the stiffness had little impact broadening doubled, the deflection reduced about 20%.Relatively speaking, increasing the steel more economical, steel increased to double the deflection reduced about 60%, while the majority of the beam on the tendon to be a long-pass arrangement to reduce the deflection of concrete creep on the increase, if the tendon not less than under the ribs, deflection reduced by 20%.3.11 As a broad framework of the Beam smaller distance between two rows of columns, it can add a stiff cantilever beam, the two columns supported on rigid cantilever beam of the end of the first.3.12 beam large at the 350 should be used limbs hoop.4.Part Slab 4.1 The board should adopt the large-diameter steel big pitch, but the spacing is not greater than 200, the pitch as far as possible with the 200.(Usually span of less than 6.6 meters cracks in the board can meet requirements).Under the steel plate spacing should equal diameter can be different, but the bar diameter type is also not too much.4.2 connected to a few rooms at the end of the same model reinforced with the pitch plate should connect.4.3 reinforcement calculations, may consider plastic redistribution of internal force will be multiplied by 0.8 to 0.9 bars on-board the discount factor will be multiplied by the plate under the tendons of the amplification factor of 1.1 ~ 1.2.——From: Chinese Economy Management Science Magazine,2009.7
第五篇:淺談鋼筋混凝土框架結(jié)構(gòu)設(shè)計(jì)的心得體會(huì)
淺談鋼筋混凝土框架結(jié)構(gòu)設(shè)計(jì)的心得體會(huì)
[摘要]在鋼筋混凝土結(jié)構(gòu)設(shè)計(jì)中,由于每個(gè)設(shè)計(jì)者的經(jīng)驗(yàn)不同、對規(guī)范的理解不同,因而在處理某個(gè)設(shè)計(jì)問題時(shí),也就會(huì)采取不同的處理方法。文章對鋼筋混凝土框架結(jié)構(gòu)設(shè)計(jì)中,基礎(chǔ)、梁、柱、板四部分應(yīng)注意的問題,分別提出若干看法。
[關(guān)鍵詞]鋼筋混凝土結(jié)構(gòu)設(shè)計(jì);基礎(chǔ);梁;柱;板
[作者簡介]劉平湘,南寧市建筑設(shè)計(jì)院助理工程師,研究方向:結(jié)構(gòu)工程,廣西南寧, 530022
[中圖分類號(hào)] TU375 [文獻(xiàn)標(biāo)識(shí)碼] A [文章編號(hào)] 1007-7723(2010)05-0111-0002
近年來越來越多的建筑物使用鋼筋混凝土結(jié)構(gòu),故鋼筋混凝土結(jié)構(gòu)在整個(gè)建筑市場的地位越來越重要。在鋼筋混凝土結(jié)構(gòu)設(shè)計(jì)中,由于每個(gè)設(shè)計(jì)者的經(jīng)驗(yàn)不同、對規(guī)范的理解不同,所以在處理某個(gè)設(shè)計(jì)問題時(shí),也就會(huì)采取不同的處理方法。在這幾年的結(jié)構(gòu)設(shè)計(jì)實(shí)踐工作中,筆者積累了一些經(jīng)驗(yàn),下面就鋼筋混凝土框架結(jié)構(gòu)設(shè)計(jì)中的基礎(chǔ)、梁、柱、板四部分,在設(shè)計(jì)時(shí)應(yīng)注意的問題,闡述一下個(gè)人觀點(diǎn)。
一、基礎(chǔ)部分
1.對于柱下擴(kuò)展基礎(chǔ)寬度較寬(大于4m)或地基不均勻及地基較軟時(shí)宜采用柱下條基;并應(yīng)考慮節(jié)點(diǎn)處基礎(chǔ)底面積雙向重復(fù)使用的不利因素,適當(dāng)加寬基礎(chǔ)。
2.建筑地段較好、基礎(chǔ)埋深大于3m時(shí),應(yīng)建議甲方做地下室。當(dāng)?shù)鼗休d力滿足設(shè)計(jì)要求時(shí),地下室底板可不再外伸以利于防水。每隔30~40m設(shè)一后澆帶,并注明兩個(gè)月后用微膨脹混凝土澆注。設(shè)置地下室可降低地基的附加應(yīng)力,提高地基的承載力(尤其是在周圍有建筑時(shí)有用),減少地震作用對上部結(jié)構(gòu)的影響。不應(yīng)設(shè)局部地下室,且地下室應(yīng)有相同的埋深。
3.地下室外墻為混凝土?xí)r,相應(yīng)的樓層處梁和基礎(chǔ)梁可取消。
4.抗震縫、伸縮縫在地面以下可不設(shè),連接處應(yīng)加強(qiáng);但沉降縫兩側(cè)墻體基礎(chǔ)一定要分開。
5.新建建筑物基礎(chǔ)不宜深于周圍已有基礎(chǔ)。如深于原有基礎(chǔ),其基礎(chǔ)間的凈距應(yīng)不少于基礎(chǔ)高差的2倍;否則應(yīng)打抗滑移樁,防止原有建筑的破壞。建筑層數(shù)相差較大時(shí),應(yīng)在層數(shù)較低的基礎(chǔ)方格中心的區(qū)域內(nèi)墊焦碴來調(diào)整基底附加應(yīng)力。
6.獨(dú)立基礎(chǔ)偏心不能過大,必要時(shí)可與相近的基礎(chǔ)做成柱下條基。兩根柱的柱下條基的荷載重心和基礎(chǔ)底版的形心宜重合,基礎(chǔ)底板可做成梯形或臺(tái)階形,或調(diào)整挑梁兩端的出挑長度。
7.獨(dú)立基礎(chǔ)的拉梁宜通長配筋。拉梁頂標(biāo)高宜較高,否則底層墻體過高。
8.底層內(nèi)隔墻一般不用做基礎(chǔ),可將地面的混凝土墊層局部加厚。
9.基礎(chǔ)底板混凝土不宜大于C3O,一是沒用;二是容易出現(xiàn)裂縫。
二、柱子部分
1.地上為圓柱時(shí),地下部分應(yīng)改為方柱,方便施工。圓柱縱筋根數(shù)最少為8根,箍筋用螺旋箍,并注明端部應(yīng)有一圈半的水平段。方柱箍筋應(yīng)使用井字箍,并按規(guī)范加密。角柱、樓梯間柱應(yīng)增大縱筋并全柱高加密箍筋。幼兒園不宜用方柱。
2.原則上柱的縱筋宜大直徑、大間距,但間距不宜大于200。
3.柱內(nèi)埋管,由于梁的縱筋錨入柱內(nèi),一般情況下僅在柱的四角才有條件埋設(shè)較粗的管。管截面面積占柱截面4%以下時(shí),可不必驗(yàn)算。柱內(nèi)不得穿暖氣管。
4.柱斷面不宜小于450×450,混凝土不宜小于C25,否則梁縱筋錨入柱內(nèi)的水平段不容易滿足0.45La的要求,不滿足時(shí)應(yīng)加橫筋;否則在梁柱節(jié)點(diǎn)處鋼筋太密,混凝土澆筑困難。異型柱結(jié)構(gòu),梁縱筋一排根數(shù)不宜過多,柱端部縱筋不宜過密,否則節(jié)點(diǎn)混凝土澆筑困難。當(dāng)有部分矩形柱部分異型柱時(shí),應(yīng)注意異型柱的剛度要和矩形柱相接近,不要相差太大。
5.柱應(yīng)盡量采用高強(qiáng)度混凝土來滿足軸壓比的限制,減小斷面尺寸。
6.盡量避免短柱,短柱箍筋應(yīng)全高加密,短柱縱筋不宜過大。
7.考慮到豎向地震作用,柱子的軸壓比及配筋宜留有余地。
三、梁部分
1.梁上有次梁處(包括挑梁端部)應(yīng)附加箍筋和吊筋,宜優(yōu)先采用附加箍筋。附加筋一般要有,但不應(yīng)絕對。規(guī)范說得清楚,位于梁下部或梁截面高度范圍內(nèi)的集中荷載,應(yīng)全部由附加橫向鋼筋承擔(dān)。也就是說,位于梁上的集中力如梁上柱、梁上后做的梁如水箱下的墊梁不必加附加筋。位于梁下部的集中力應(yīng)加附加筋。但梁截面高度范圍內(nèi)的集中荷載可根據(jù)具體情況而定。當(dāng)主次梁截面相差不大,次梁荷載較大時(shí),應(yīng)加附加筋。當(dāng)主梁高度很高、次梁截面很小、荷載很小時(shí),如快接近板上附加暗梁,主梁可不加附加筋。還有當(dāng)主次梁截面均很大,如工藝要求形成的主次深梁,而荷載相對不大,主梁也可不加附加筋。
2.當(dāng)外部梁跨度相差不大時(shí),梁高宜等高,尤其是外部的框架梁。當(dāng)梁底距外窗頂尺寸較小時(shí),宜加大梁高做至窗頂。梁也可偏出柱邊一較小尺寸。梁與柱的偏心可大于1/4柱寬,并宜小于1/3柱寬。
3.梁上有次梁時(shí),應(yīng)避免次梁搭接在主梁的支座附近;否則應(yīng)考慮由次梁引起的主梁抗扭,或增加構(gòu)造抗扭縱筋和箍筋。當(dāng)采用現(xiàn)澆板時(shí),抗扭問題并不嚴(yán)重。
4.原則上梁縱筋宜小直徑、小間距,有利于抗裂;但應(yīng)注意鋼筋間距要滿足要求,并與梁的斷面相應(yīng)。箍筋按規(guī)定在梁端頭加密。布筋時(shí)應(yīng)將縱筋等距,箍筋肢距可不等。小斷面的連續(xù)梁或框架梁,上、下縱筋均應(yīng)采用同直徑的,盡量不在支座搭接。
5.端部與框架梁相交或彈性支承在墻體上的次梁,梁端支座可按簡支考慮,但梁端箍筋應(yīng)加密。
6.挑梁宜作成等截面(大挑梁外露者除外)。與挑板不同,挑梁的自重占總荷載的比例很小,作成變截面不能有效減輕自重。變截面挑梁的箍筋,每個(gè)都不一樣,難以施工。變截面梁的撓度也要大于等截面梁。挑梁端部有次梁時(shí),注意要附加箍筋或吊筋。一般挑梁根部不必附加斜筋,除非受剪承載力不足。對于大挑梁,梁的下部宜配置受壓鋼筋以減小撓度。挑梁配筋應(yīng)留有余地。
7.梁上開洞時(shí),不但要計(jì)算洞口加筋,更應(yīng)驗(yàn)算梁洞口下偏拉部分的裂縫寬度。梁從構(gòu)造上能保證不發(fā)生沖切破壞和斜截面受彎破壞。
8.挑梁出挑長度小于梁高時(shí),應(yīng)按牛腿計(jì)算或按深梁構(gòu)造配筋。
9.扁梁寬度不必過大,只要鋼筋能正常擺下及受剪滿足即可。因?yàn)樵趽隙扔?jì)算時(shí),梁寬對剛度影響不大。相對來講,增大鋼筋更經(jīng)濟(jì)。同時(shí)梁的上筋應(yīng)大部分通長布置,以減小混凝土徐變對撓度的增大。
10.梁寬大于350時(shí),應(yīng)采用四肢箍。
四、現(xiàn)澆板部分
1.板的鋼筋宜采用大直徑、大間距,但間距不大于200,間距盡量用200(一般跨度小于6.6m的板的裂縫均可滿足要求)。板上下鋼筋間距宜相等,直徑可不同,但鋼筋直徑類型也不宜過多。
2.相連幾個(gè)房間的同型號(hào)、同間距板底鋼筋宜連通。
3.配筋計(jì)算時(shí),可考慮塑性內(nèi)力重分布,將板上筋乘以0.8~0.9的折減系數(shù),將板下筋乘以1.1~1.2的放大系數(shù)。
4.支承在外圈框架梁上的板負(fù)筋不宜過大,否則將對梁產(chǎn)生過大的附加扭距。一般來說,板厚>150時(shí)采用 φ10@200;否則用 φ8@200。
5.當(dāng)厚板與薄板相接時(shí),薄板支座按固定端考慮是適當(dāng)?shù)?但厚板就不合適,宜減小厚板支座配筋,增大跨中配筋。
五、結(jié)語
以上是筆者在這幾年設(shè)計(jì)工作實(shí)踐中關(guān)于鋼筋混凝土框架結(jié)構(gòu)設(shè)計(jì)的幾點(diǎn)心得體會(huì),僅供設(shè)計(jì)人員和施工人員參考?!鞍倌甏笥?jì)、質(zhì)量第一”不是一句空號(hào)。這不但要求廣大設(shè)計(jì)、管理、施工和技術(shù)人員有對國家和人民極端負(fù)責(zé)的態(tài)度和獻(xiàn)身精神,而且要求他們有能勝任工作的業(yè)務(wù)水平。
[參考文獻(xiàn)]
[1]混凝土結(jié)構(gòu)設(shè)計(jì)規(guī)范(GB 50010-2002)[S].[2]建筑抗震設(shè)計(jì)規(guī)范(GB 50011-2001)[S].[3]高層建筑混凝土結(jié)構(gòu)技術(shù)規(guī)程(JGJ3-2002)[S].