第一篇:鉆井英語教材(修改版)
鉆井英語
目 錄
第一節(jié) 鉆井英語單詞.................................3 第二節(jié) 井場用語,鉆井常用短語及句子................12 第三節(jié) 鉆井泥漿術(shù)語................................31 第四節(jié) 常用安全術(shù)語................................33 第五節(jié) 鉆井設(shè)備英語...............................35 第六節(jié) 石油鉆井英語情景會(huì)話........................42 附錄一:平臺(tái)人員、作業(yè)者及服務(wù)公司人員名稱..........49 附錄二:主要設(shè)備名稱...............................50 附錄三:鉆具、井口工具、打撈工具名稱................54 附錄四:材料和工具名稱.............................55 附錄五:常用縮寫形式...............................57 2
第一節(jié) 鉆井英語單詞
drilling crew 鉆井隊(duì)
drill floor,rig floor,floor 鉆臺(tái)
drawworks 絞車 well-site, rig-site 井場
rig manager平臺(tái)經(jīng)理
DC(drill collar)鉆鋌 drilling engineer 鉆井工程師
DP(drill pipe)鉆桿 toolpusher 帶班隊(duì)長
rotary table 轉(zhuǎn)盤
driller 司鉆
assistant driller 副司鉆
derrickman, monkeyman 井架工
roughneck, floorman 鉆工
roustabout 場地工
liner 缸套 motor fireman 司機(jī)(motorman)wellhead 井口
circulation & solid system 循環(huán)固控系統(tǒng)
machinist 機(jī)械師,機(jī)工,機(jī)械大班
electrician 電器師,電工,電器大班
operation program 作業(yè)程序(指令)cathead 貓頭 caravan 營房,大篷車
tong 大鉗 elevator 吊卡 well depth 井深
slip 卡瓦
makeup 上扣 spud in 開鉆
breakout 卸扣
ROP(rate of penetration),drilling
speed, penetration rate 鉆速
trip 起下鉆
diesel-engine
柴油機(jī) loss circulation 井漏,循環(huán)漏失
working uniform
工作服
brake handle, brake bar 剎把
water well condition
水井井況
circulating tank, circulation tank
循
環(huán)罐
normal drilling 正常鉆進(jìn)
reserve tank 儲(chǔ)備罐 parameter 參數(shù)
trip tank 補(bǔ)給罐,尖底罐, 起下鉆泥
漿罐(起下鉆計(jì)量罐)
rotary speed 轉(zhuǎn)盤轉(zhuǎn)速(轉(zhuǎn)速)
shale shaker 振動(dòng)篩
pump pressure
泵壓
WOB(weight on bit)
鉆壓
mesh
目,網(wǎng)孔;嚙合,編織 torque 扭矩
screen cloth
篩布
displacement 排量
safety meeting 班前會(huì)
pump stroke
泵沖
shift exchange 交班、(倒班)
mud pump 泥漿泵
equipment
設(shè)備,裝備,器材 master 師傅,主人;征服,控制,精通
instruction
指令,指示,說明書 in charge of 負(fù)全責(zé),經(jīng)營,照顧
SCR house 可控硅房
obtain 獲得,得到
replace
更換,替換,代替 according to 根據(jù),依照
brake shoe
剎車塊 normal 正常的,正規(guī)的,標(biāo)準(zhǔn)的 wear out
磨損
introduce 介紹,傳入,引進(jìn),提出
safety
安全,保險(xiǎn),安全設(shè)備 progress 前進(jìn),行進(jìn),進(jìn)展 supervisor 監(jiān)督 location 井場,井位 inspection 檢查,考察,驗(yàn)收 cellar 方井
soild(control)system 固控系統(tǒng) waste pit 污水池、廢水池 Top Drive(Drilling System)頂(部)驅(qū)(動(dòng))鉆井系統(tǒng)
Project Department 項(xiàng)目部 on duty 值班 modify 整改、修改
clinic 醫(yī)務(wù)室 electical rig 電動(dòng)鉆機(jī) disconnect 拆開,分離,斷開 pipeline 管線 order 指令,命令,順序 Company 公司,甲方
Operator 業(yè)主,甲方 Contractor 承包商,乙方
pump house 泵房 schedule 時(shí)間表,進(jìn)度表 size 尺寸,大小,尺碼
information 通知,信息,資料
fax 傳真 guy 家伙,人 standpipe 立管 Campsite 營地 crownblock 天車 traveling block 游車
dog-house 司鉆休息室(鉆工值班房)rat hole 大鼠洞
mouse hole小鼠洞
spudding inspection 開鉆驗(yàn)收 fill in 填充
catwalk
狹窄的過道,高空走道;高臺(tái),天車臺(tái)
casing float collar 套管浮箍
casing float valve 套管浮閥 casing guide shoe 套管引鞋 cement水泥,注水泥,結(jié)合劑,膠結(jié)劑
plug
插頭
safety pin安全銷 glove手套
quick-connector快速接頭 fire extinguisher滅火器
stretcher擔(dān)架
First Aid
緊急救護(hù)
control board控制板 weight mdicator指重表
rotary torque indicator轉(zhuǎn)盤扭矩表 sling吊繩 繩套
deadline anchor死繩固定器 brake system剎車系統(tǒng) drum滾筒 safety line保險(xiǎn)繩 safety belt安全帶 hydraulic tong液壓大鉗 slip卡瓦
(和上面的重復(fù))
elevator吊卡(和上面的重復(fù))bit breaker鉆頭盒 chain tong鏈鉗
pipe tong管鉗 wrench板手
pliers鉗子、老虎鉗 scissor剪刀
cable slot電纜槽
vacuum degasser真空除氣器 butterfly valve蝶閥 desilter除泥器 desander除砂器
degasser除氣器 mud gun泥漿槍
agitator攪拌器 leakage漏,泄漏,滲漏
barite重晶石 hopper漏斗
piston活塞 union由壬
fuel tank燃油罐、高架罐 remote control station遠(yuǎn)控房 BOP stacks防噴器組 kill line 壓井管線
choke line節(jié)流管線
blowout preventer防噴器
annular環(huán)空
ram閘板 low pressure低壓 fire blanket消防毯
fire sand
防火砂
kitchen廚房 storeroom儲(chǔ)藏室
bathroom
衛(wèi)生間(浴室)spudding date開鉆日期
spudding time
開鉆時(shí)間
string鉆柱
BHA(bottom hole assembly)井下鉆具組合drilling jar隨鉆震擊器 drill box鉆桿盒
drilling program鉆井程序、鉆井指令
drilling fluid
鉆井液
mix up混和、調(diào)配、混淆
mud material
泥漿材料
LCM(lost circulation material)堵漏材料、堵漏劑
mud engineer泥漿工程師 day tour
白班
night tour夜班
drilling progress鉆井進(jìn)度
routine inspection例行檢查、日常 cave in 塌陷、塌下、井壁坍塌 kick井涌
casing setting depth套管坐封深度(井下復(fù)雜情況)undergauge 縮徑 tight hole井徑縮小的井眼
tight spot(井徑)縮小點(diǎn)、縮小段 footage鉆井進(jìn)尺
formation地層、巖層、構(gòu)造、組織 make up a joint接單根(立柱)sticking point卡點(diǎn) free point解卡點(diǎn)?? hook weight懸重 unfreeze解卡 fishing 打撈 back reaming倒劃眼 soak oil泡油
soak releasing 泡解卡劑 slough off坍塌 ream down劃眼
borehole operation井下作業(yè) make a trip 起下鉆
bit bouncing 蹩跳 bit balling 泥包鉆頭
cutting sample 砂樣
sandstone 砂巖
RIH(run in hole)下鉆 junk sub 打撈(落物)接頭 scrape 擦、刮、擦痕、刮掉 bit gauge 鉆頭規(guī) centralizer 扶正器 hold pressure 蹩壓
standby rate 等待日費(fèi)、待命費(fèi) cementing operation固井作業(yè) loss漏失
cutting
切削、切割、切屑、鉆屑
hole section井段
mud logging
綜合錄井
downhole problem(trouble)井下事故Pooh(pull out of hole)起鉆
junk 落物、金屬屑、碎物
sticking 粘附、刺、卡鉆
day rate
日費(fèi)
run casing下套管
drift casing套管通徑??
geologist地質(zhì)師、地質(zhì)學(xué)家 thread protector護(hù)絲 casing tong套管鉗 wiper trip通井
rigid centralizer剛性扶正器
guide shoe引鞋
float-collar浮箍
slurry水泥漿
back-off倒扣
clean thread
洗扣 sidetrack側(cè)鉆
casing shoe
套管鞋
deviational survey 井斜測量(測斜)accident事故、意外事件
bouncing 跳躍的、大的、重的、跳鉆
WOC
(waiting-on--cement)候凝期
nipple up安裝(防噴器)primary cement job正注固井 test pressure 試壓
International practice國際慣例 choke manifold節(jié)流管匯 coring operation 取心作業(yè) hole collapse井壁坍塌
bump pressure 碰壓
cement head 水泥頭
reverse circulation 反循環(huán)
wireline log電測
pressure surge
壓力激動(dòng)、壓力涌動(dòng)
lay down the string倒鉆具 nut螺母
bolt螺栓、螺釘 screw bolt螺栓、螺桿
pipe ram半封閘板 shut-down停工
HWDP(heavy weight drill pipe)加重鉆桿
calibrate 校正、定標(biāo)
judgment 判斷
bleed off line 排砂(排放)管線 commence 開始、著手 isolate 隔離、隔絕、絕緣 welding 焊接、壓實(shí)、壓結(jié) mud property 泥漿性能
MW(mud weight)泥漿比重
mud density 泥漿密度 funnel viscosity 漏斗粘度 PV(plastic viscosity)塑性粘度
well control drill 井控演習(xí)、防噴演習(xí)increase 增大、增加、增大
decrease 減少、降低;減少之量 pressure gauge 壓力表
casing pressure 套(管)壓(力)choke valve 節(jié)流閥
cement 水泥,注水泥;結(jié)合劑;粘緊,粘牢
(重復(fù))
cement accelerator 水泥促凝劑
cement hardener
水泥速凝劑, 水泥硬
化劑
cement head(注)水泥頭
cementing jobs 注水泥作業(yè) cement job 固井作業(yè) cement squeeze 擠水泥 bonus 獎(jiǎng)金,紅利 completion job 完井作業(yè)
hand pump 手搖泵,手壓泵 workshop 車間,工場
nipple down 卸下
nipple up 裝上,接上,裝配,安裝(重復(fù))
ID(inside diameter)
內(nèi)徑
torque-on-bit 鉆頭扭矩 tubing bonnet 油管頭
tubing hanger 油管懸掛器, 油管掛
tubing joint 油管接箍
landing head(懸掛油管用)油管頭,(油管)聯(lián)頂頭
landing joint
聯(lián)頂節(jié)[下套管或油管聯(lián)
頂時(shí)用]
TBG(tubing)油管
spacer fluid 封隔液
mud logging unit 綜合錄井儀 cooperation 合作,協(xié)作 sample sack 砂樣袋 engage 從事;嚙合
deadline anchor 死繩固定器,死繩錨(重復(fù))
drilling cost 鉆井成本 evaluate 評(píng)價(jià),估價(jià),求…的值 in advance 預(yù)先
overpressure 過壓,超壓力 swab 抽汲 eliminate 排除,消除 pipe bouncing 鉆具蹩跳
drill string failure 斷鉆具 twist-off 脫扣 horizontal well 水平井
vertical well 垂直井 stainless steel 不銹鋼 anticline 背斜 porosity 孔隙度
potential 潛在的,可能的;潛能,潛力 densimeter 密度計(jì)
communication 傳達(dá),信息,交流,通訊 hook velocity 大鉤速度
verify 檢驗(yàn),查證,核實(shí) confirm 確定,批準(zhǔn),印證 incredible 難以置信的 round trip 起下鉆 resume normal drilling 恢復(fù)正常鉆進(jìn)goal 目的,目標(biāo)
understanding 理解,認(rèn)識(shí),諒解
kill operation 壓井作業(yè)
wireline [electric] log 電測井
GR 自然伽瑪
scrap iron 鐵屑
cotton yarn 棉紗 paint 油漆
cavern 大山洞,大巖洞,溶洞,穴
fossil 化石;陳腐的,守舊的
gas-bearing 含氣的water-bearing 含水的
DST(drill-stem test)中途測試, 鉆桿測試
water loss
失水
flow pressure 流動(dòng)壓力 daily output 日產(chǎn)量 target zone
目的層
finishing drilling 完鉆 thermometer 溫度計(jì) reverse circulation 反循環(huán)
build up 建造,安裝;壓力增加,壓力恢復(fù) build up a joint??
Well Control & Drill Procedures
井控措施及防噴演習(xí)程序
LIST OF ABBREVIATIONS縮寫表 BHPBlow out Preventer 防噴器(重
復(fù))
CDPPDrill collar 鉆鋌 DPEquivalent circulating density 當(dāng)量循環(huán)密度
EMWFinal Circulating Pressure 最終循環(huán)壓力
Gm – Mud weight 泥漿比重 高壓高溫
HWDPInitial Circulating Pressure初始循環(huán)壓力
LOTMaximum Allowable Annular Surface Pressure 最大容許環(huán)空表面壓力 MDMaximum equivalent mud weight最大當(dāng)量泥漿比重 PsFlow rate 流量
ROPShut-in Casing Pressure關(guān)井套壓
SIDPPCasing pressure 套管壓力(重復(fù))TVDHigh pressure high temperatureview point 觀點(diǎn)
additive 添加劑
saver sub
保護(hù)接頭 obstruction阻塞,阻擋
pipehandler 管子操作裝置
evidence 跡象,證明
Driller’s Method
司鉆法 lower Kelly cock 方鉆桿下旋塞
water-based system
水基體系 upper Kelly cock 方鉆桿上旋塞 stripping 強(qiáng)行起下鉆
implement 執(zhí)行 overcome 克服
potential 潛在的,可能的;勢,位
Daily Drilling Report
鉆井日報(bào)表
shut-in procedures 關(guān)井程序,關(guān)井步驟
soft shut-in procedures 軟關(guān)井程序 with a careful eye on留心
H2S(hydrogen sulfide)硫化氫 Muster point(Muster board)緊急集合點(diǎn)(緊急集合點(diǎn)標(biāo)識(shí)牌)Wind sock 風(fēng)向標(biāo)
SCBA(self-contained breathing apparatus)呼吸器
Oxygen, acetylene 氧氣,乙炔 Alarm 警報(bào) Ambulance 救護(hù)車 Emergency team 應(yīng)急小組 Fire pump, Fire drill, Fire hose, ax, rope 消防泵,消防演習(xí),消防水龍帶,消防斧,消防繩
JSA(job safety analysis)工作中安全因素分析
HSE(health, safety and environment)健康,安全,環(huán)保 Escaping route 逃生路線 Inflammables 易燃物品
up-to-date 現(xiàn)代化的,最新(式)的,當(dāng)今的chilksan line活動(dòng)彎頭管線
Work Permit(Permit to Work)工作許可(證)
Safety meeting for running casing, liner, electric log 下套管,尾管,電測安全會(huì)
PPE(personal protection equipment)勞保用品
Special operation 特殊作業(yè) Vehicle inspection 車輛檢查 Housekeeping 打掃衛(wèi)生 Crane 吊車
MSDS(material safety data sheet)泥漿藥品安全使用手冊 first aid box 急救箱 Helmet安全帽 Safety glasses 護(hù)目 Fall arrester 防墜器
VIS(viscosity)粘度
PV(plastic viscosity)塑性粘度(重
復(fù))
water tank水罐 YP(yield point)屈服粘度(流動(dòng)點(diǎn))caustic soda 燒堿
Gels(gel strength)靜切力(膠凝強(qiáng)度)low viscosity低粘 high viscosity(hi-vis)高粘
lightweight low-viscosity mud低比重低粘泥漿
dangerous 危險(xiǎn)
sand trap 沉沙罐、錐形罐 trip tank 計(jì)量罐 pill tank加藥罐 waste pit 排沙池 fluid loss 失水
第二節(jié) 井場用語,鉆井常用短語及句子
鉆井(Drilling)
1、Carry out drilling operation in accordance with the drilling program.按鉆井程序進(jìn)行鉆井作業(yè)。
2、Prepare bell nipple.準(zhǔn)備“喇叭口”短節(jié)
3、Make up 2 joints of drill pipe.接兩根鉆桿
4、Break out this connection.卸開該接頭。
5、Mix gel fluid for drilling conductor hole.為鉆導(dǎo)管井眼配制高粘度泥漿。
6、Make up bottom hole assembly(BHA).組合下部鉆具。
7、Check and reset crown-saver on every tour.每個(gè)班都要檢查并重新調(diào)整天車防碰裝置。
8、Number stands on trip out and trip in.起下鉆進(jìn)給立柱編號(hào)。
10、Pick up stands.接立柱。
11、Don’t drill faster than 15 minutes for 1 stand.鉆進(jìn)速度別超過15分鐘1根立柱。
12、Drop TOTCO.投(陶特)測斜儀。
13、Fish TOTCO with overshot.用打撈筒撈起測斜儀。
14、Resume drilling to T.D.繼續(xù)鉆進(jìn)到總深。
15、Circulate 15 minutes.循環(huán)15分鐘。
16、Run in hole.下鉆。
17、Pull out of hole.起鉆
18、Make an inventory of all ring gaskets.開一個(gè)所有墊圈的清單。
19、Use spinning tong.使用氣動(dòng)扳手。20、Operate the air winch.操作氣動(dòng)絞車。
21、Lay down 57 joints of 5” drill pipe.甩57根5”鉆桿。
22、Pick up drill stem test tool.提起鉆柱測試工具。
23、Circulate mud for 2 hours.循環(huán)泥漿2小時(shí)。
24、Move string during circulation.在循環(huán)時(shí)注意活動(dòng)鉆具。
25、Circulate hole clean.循環(huán)清洗井眼。
26、Circulate bottoms up.循環(huán)泥漿幾周。
28、Fill up every 5 stands.每5柱灌泥漿一次。
29、Check mud weight every 15 minutes.每15分鐘檢查泥漿比重。30、Reverse out excess cement.反循環(huán)替出多余的水泥。
31、Change(或:replace)old mud by new mud.用新的泥漿替換出舊的泥漿。
32、Stop drilling.停止鉆進(jìn)。
33、Drilling ahead.鉆進(jìn)。
34、Pull out of hole bit.起出鉆頭。
35、Change bit.換鉆頭。
36、Run the wear bushing.下抗磨補(bǔ)心。
37、The bit thread type is regular pin.鉆頭絲扣是正規(guī)公扣。
38、What’s the make-up torque?
上扣扭矩要多大?
39、Run in 9” collars.下9“鉆鋌。
40、The cathead can’t give enough torque.貓頭力量不夠。
41、Connect crossover sub.接上配合接頭。
42、The tong angle is too small.大鉗的角度太小了。
43、Stop circulating.停止循環(huán)泥漿。
44、Break out the stand.卸立柱。
45、Set the single into the mousehole.把這個(gè)單根放進(jìn)鼠洞。
46、Can we break out the pipe with rotary table? 可用轉(zhuǎn)盤卸扣嗎?
47、No!Break it out with tongs.不行,要用大鉗卸扣。
48、Spin it out(break it out)with the air spanner.用氣動(dòng)扳手卸扣。
49、Put the pipe wiper on the string.裝上鉆桿刮泥器。50、Don’t set this stand back.這柱鉆桿不要放在鉆桿盒上。
51、Make up the lift sub.接好提升短節(jié)。
52、Secure the safety clamp.上緊安全卡瓦。
53、The bit is nearing the shoe.鉆頭快到套管鞋了。
54、Slow down the running speed.放慢下放速度。
55、This is the undergauged interval.這是縮徑井段。
56、This is the drilling program.這是鉆井設(shè)計(jì)書。
57、How much weight on bit is required?
要加多少鉆壓?
58、Keep the rotary speed at 120-140 RPM.轉(zhuǎn)速保持120-140轉(zhuǎn)/分。
59、Keep the flow rate 3000 LPM.保持排量3000升/分。60、The pump pressure is too high.泵壓太高了。61、Don’t ream the hole too fast.劃眼不要太快。62、Notice the rotary torque.注意轉(zhuǎn)盤扭矩的變化。63、The penetration rate is getting slower.鉆速變慢了。64、The bit is nearly worn out.鉆頭快磨光了。65、Stop drilling at 2000 meters.鉆至2000米停鉆。66、Circulate for one hour.循環(huán)一個(gè)小時(shí)。67、The pump pressure has increased.泵壓升高了。68、One nozzle may be plugged.可能有個(gè)水眼堵了。69、What is the hook load.懸重多少?
70、What’s the pick-up weight?
上提重量是多少? 71、What’s the lowering weight?
下放重量是多少? 72、Run in HWDP.下加重鉆桿。
73、A stabilizer is needed here.這里需要一個(gè)扶正器。74、This is a flexible sub.這是撓性接頭。75、This is the BHA log.這是下部鉆具組合記錄。
76、Record all outside and inside diameters.記錄好所有(入井工具)內(nèi)外徑。
77、We need a short drill collar.需要一根短鉆鋌。78、Pull the cat line.拉貓頭。
79、Operate the brake lever(或:brake).操作(或:扶)剎把。80、Stop the pumps.停泵。81、Make a wiper tirp.通井。
82、Retrieve wear bushing.取出抗磨補(bǔ)心。83、Bleed off pressure.(釋)放壓(力)。84、Keep 5 wraps on the drum.滾筒上留5圈。85、Set slips.座上卡瓦。
86、If tight hole, repeat wiper trip.如果井徑緊,重復(fù)劃眼。
87、Setback bottom hole assembly.將下部鉆具立于鉆桿盒內(nèi)。88、Make sure all alarms are on.確保所有的警報(bào)信號(hào)都開著。89、Lay down TDS spinner.拆下頂部驅(qū)動(dòng)的旋扣器。90、Run in hole bit #15 to bottom.用15號(hào)鉆頭下鉆到井底。91、Run in hole to casing shoe.下鉆至套管鞋。
92、Pick up same bit and BHA.裝上同樣的鉆頭與鉆具組合。93、Lay down 5” HW Drill pipe.甩5”加重鉆桿。94、Move string every 2 hours.每2小時(shí)活動(dòng)鉆具一次。95、Keep area around shaker clean.保持震動(dòng)篩區(qū)域干凈。96、Control trip gas.控制起下鉆氣。97、Ream if needed.如必要時(shí)進(jìn)行劃眼。
98、Select the best penetration rate.選擇最佳鉆進(jìn)速度。99、Fix the traveling assembly.固定流動(dòng)系統(tǒng)。
100、Check power tongs and spinning rope are on drill floor.檢查動(dòng)力鉗和尾繩是否在鉆臺(tái)。
101、What is the weight on bit(簡WOB).鉆壓是多少? 102、What is the BHA of this well? 這口井的下部鉆具如何組合。103、Drill out cement.鉆穿水泥。
104、Drill out 20” casing shoe.鉆穿20”套管鞋。105、Latch the elevator.扣吊卡。106、Unlatch the elevator.開吊卡。107、Set the slips.放卡瓦。
108、Adjust the crown-o-matic(或crown saver).調(diào)整防碰天車。109、Lock the hook pin.鎖緊大鉤銷子。
110、Check OD of stabilizers.檢查扶正器的外徑。111、Perform leak off test.進(jìn)行地層破裂(或:滲漏)測試。112、Connect kill and choke line.接上壓井和節(jié)流管線。113、Reverse out the drill pipe.反循環(huán)清洗鉆桿。114、Make a short trip.進(jìn)行短途起下鉆。115、Change the cutters.換割刀。116、Slug the pipe.灌重泥漿。
117、Drill the stand down.鉆完立柱。118、Start(或:run)the shale shaker.開振動(dòng)篩。119、Start the desanders.開除砂器。120、Start the desilters.開除泥器。
121、Change it with a 40 mesh screen.換成40目重篩布。122、Shut it off.關(guān)掉。
123、Pull it to the cat ramp.把它拉到坡道上去。124、Make a fast connection.接單根要快。
125、Don’t dump the mud into the sea.不要把泥漿排放到海里。126、Disconnect it with a chain tong.用鏈鉗卸開。127、Put a thread protector.裝上護(hù)絲。
128、Can we use the power slips?
可以使用動(dòng)力卡瓦嗎? 下套管
下套管與固井
Casing and Cementing 129、Run in hole to bottom for wiper trip.下鉆通井。130、This is the casing program.這是套管程序。131、Prepare for running casing.準(zhǔn)備下套管。
132、Make everything ready for running 7” casing.做好下7”套管的準(zhǔn)備。133、Make cementing job.固井。
134、Displace cementing with mud pump.用泥漿泵替水泥。135、Set cement plug from 2940 to 2790m.在2940到2790米井段打水泥塞。
136、Pick up cementing head.接水泥頭。137、Cement samples are hard.水泥樣已凝固。138、Pump in 3 cubic meters of spacer.注隔離液3方。139、Pump down the plug.泵壓(膠)塞。140、Wait on cement.候凝。
141、The guide shoe will be connected.接引鞋。142、Connect the float collar.接浮箍。
143、Connect the air line to the casing stabbing board.接好套管扶正臺(tái)的氣管線。
144、Run casing with the 350T slip elevator.用350噸卡瓦式吊卡下套管。145、Clean and dry 20” casing threads with rags.清潔并擦干20”套管絲扣。
146、Where is the rabbit for drifting the casing?套管通徑規(guī)在哪里? 153、How much is the horse power?
有多大馬力。
154、She(it)has 6000 HP(全稱horse power).有6000馬力。162、Shall we preload right now?
馬上開始?jí)狠d嗎? 打撈
Fishing 192、The bit cutters have been lost in the hlie.牙輪落井。193、Run in the reverse-circulation basket.下反循環(huán)打撈籃。194、There is a lot of junk in the hole.井下有很多落物。195、The fish is 235.46 meters long.落魚長度235.46米 196、The fish top is at 2478.34 meters.魚頂位置2478.34米。取芯
Coring 197、Stop drilling for coring.停鉆準(zhǔn)備取芯。198、Make up core bit.接取芯鉆頭。
199、What type of core bit is it?
這是什么型號(hào)的取芯鉆頭? 200、Run in a diamond core bit.下金鋼石取芯鉆頭。201、Let’s drop the ball for coring.可以投球取芯。202、The core has been broken off.巖芯斷了。203、Put the core in the boxes.把巖芯裝到巖芯盒里。204、Don’t brake suddenly.不要猛剎車。205、Take out the core.巖芯出筒。206、How long is the core?
巖芯多長?
207、The core recovery is 98%.巖芯收獲率是98%。
208、Run in the core barrel again.繼續(xù)下巖芯筒(或:取芯筒)。209、Run in hole core barrel.下取芯筒。
210、Drop ball.投鋼球。
211、Recover core.取出巖芯。
212、Use same parameters as for core#1.使用與1#取芯同樣的參數(shù)??ㄣ@與解卡
Freeing Stuck Pipe 17
213、The down-hole problems are very complicated.井下情況很復(fù)雜。
214、The hole is tight.遇阻了。
215、Overpull while tripping out.起鉆遇卡。(overpull:超拉力)
216、The formation is unstable.地層不穩(wěn)定。
217、The wall caving is severe.井壁垮塌嚴(yán)重。
218、There are many return cuttings.返出巖屑特別多。
219、The mud returns have decreased.返出泥漿減少。220、The hole is enlarged.井眼擴(kuò)大了。221、The pipe’s stuck.卡鉆了。222、Pull up to 150 tons.上提150噸。223、Slack off to 50 tons.下放50噸。
224、Ream down all the tight points.在所有遇阻點(diǎn)進(jìn)行劃眼。225、The rotary table can’t rotate.轉(zhuǎn)盤轉(zhuǎn)不動(dòng)。226、Where is the sticking point?
卡點(diǎn)在哪里? 227、Make a tensile test.做拉伸試驗(yàn)。
228、Back it off above the free point.在卡點(diǎn)以上倒扣。229、Where is the back-off position?
脫扣位置在哪? 230、Plug the well for sidetracking.打水泥塞側(cè)鉆。231、The mud is gas cut.泥漿有氣侵。
232、The pit level has lowered quickly.泥漿池液面下降很快。233、The hole lost returns.井口不返泥漿。
234、The returns are unstable.返出泥漿量忽大忽小。235、Where’s the thief zone?
漏失層在哪里? 236、Cut down the flow rate.降低排量。237、Lower the mud density.降低比重。
238、Cut down the hydrostatic pressure.減少靜壓。239、The gas smell is strong.天然氣味度很濃。
240、There’s some trace of oil.發(fā)現(xiàn)有油花。(trace指:痕跡)241、The pump pressure is fluctuating.泵壓不穩(wěn)。Fluctuate指:波動(dòng) 242、It is a zone of abnormal pressure.這是異常壓力層。243、The hole(或:well)is kicking!
井涌啦!
244、Shut in the BOP!
關(guān)閉防噴器!
245、Sound the general alarm quickly!
快發(fā)出綜合警報(bào)!
246、The stand pipe pressure is 10 kg/cm2.立管壓力10公斤/平方厘米。247、The casing pressure is 25 kg/cm2.套壓25公斤/平方厘米。248、Fill out the kill sheet.填寫壓井記錄表。249、Kill the well.壓井
250、There’s a combination of lost returns and the kick.又噴又漏,情況復(fù)雜。
251、Reverse the gas out of the hole.反循環(huán)排氣。252、What’s the lag time?
遲到時(shí)間是多少? 253、The well is now stable.現(xiàn)在井眼已經(jīng)穩(wěn)定。255、Weld on the 30” bottom flange.焊接30”法蘭。256、Hoist and nipple up 30” diverter.吊裝30”轉(zhuǎn)噴器。
257、Change the 5” pipe rams to 3-1/2”rams.把這個(gè)5”半封閘板換成3-1/2”。
258、Install blind ram.安裝防噴器的全封閘板。261、Test BOP.測試防噴器。
262、Change annular BOP packing.更換萬能防噴器膠芯。
263、Full pressure test the ram preventers.對閘板防噴器進(jìn)行全壓試壓。264、Test annular BOP at 2500 psi.萬能防噴器試壓至2500psi.265、Check annular pressure.檢查環(huán)形空間壓力。271、Retrieve the running tool.退出送入工具。
276、Function test the divreter system.對轉(zhuǎn)噴器系統(tǒng)進(jìn)行功能試驗(yàn)。277、Retrieve the pin connector.取出銷釘連接器。279、Run the test plug.下試壓塞。
280、Close the upper pipe ram.關(guān)上部鉆桿閘板防噴器。281、Open the kill line valve.開壓井管線閥。
282、The compensation capacity is 400000 pounds.補(bǔ)償能力是400千磅。283、The locking load is 100000 pounds.鎖緊負(fù)荷1000千磅。286、Assure the self-controlled rotation.保證自控轉(zhuǎn)動(dòng)。
287、Set the LMRP on the test stump.將下部防噴器插入總成座放到試 19
壓臺(tái)上。
289、Land the BOP onto the well head.座防噴器到井口頭。292、BOP carrier.防噴器叉車。
300、Check for junk inside shoe joint.檢查浮鞋內(nèi)有無落物。301、Pick for 30” conductor handing slings and shackles.吊上下30”導(dǎo)管的索具和卸扣。
302、Is slope indicator properly mounted?
水平儀是否裝好? 304、Place BOP stack on the test stump.將防噴器組放在試壓臺(tái)上。305、Check condition of all 30” casing connectors.檢查所有30”套管接頭的情況。
306、Replace O-rings as required.按需要,更換O形密封圈。308、Inspect and repair diverter.檢查并修理轉(zhuǎn)噴器。
310、Record all pressure tests on a chart recorder.用試壓表記錄試壓記錄。
311、Visually inspect all sealing element.目視檢查所有密封件。
312、Check and tighten all bolts.檢查并上緊所有螺栓。
313、Bleed off surface accumulators.地面管線排空氣。
314、Check for leaks.檢查有無泄漏。
316、Function test wellhead.對井口頭進(jìn)行功能試驗(yàn)。
318、Pressure test to 500 psi then bleed off test pressure.試壓到500psi然后放掉壓力。
319、Reduce hydraulic control manifold pressure to 5200kpa.將液壓控制管匯壓力減小到5200千帕。
320、Switch to alternate control pod.把閘門開關(guān)倒到控制面板。
327、Pressure test to 5000 psi.試壓5000psi。
328、Pick up test mandril and place in BOP stack.吊起試壓防噴器芯子并裝入防噴器組。
安全與消防
Safety and Firefighting
329、Get a Work Permit before you can start the hot work.辦理作業(yè)許可證才能進(jìn)行動(dòng)火作業(yè)。
330、Welding is not allowed.不準(zhǔn)動(dòng)焊。331、Put on your(safety)helmet.戴上安全帽
332、It’s a high voltage area.這是高壓區(qū)。333、That’s against the rule.這是違章作業(yè)。
334、Don’t walk under the crane load.不要在吊物下走動(dòng)。335、The repairing is under way.正在檢修。
336、Keep your hands clear!或:Keep you hands off、Do not touch!不要亂動(dòng)(或:不要觸摸?。?/p>
337、Wear and secure your safety belt.戴上并系好安全帶。339、Have your breathing apparatus near you.保持附近有防毒面具。340、It’s a drill.這是演習(xí)。
341、It was a BOP drill.這是防噴演習(xí)。
349、Check life saving apparatus periodically.定期檢查救生設(shè)備。350、It’s for fire fighting.這是消防用的。351、Start the fire pump.啟動(dòng)消防泵。352、This rope is too small.這根繩子太細(xì)。353、It should be function tested.需做功能測試。354、A warning notice should be set up.要掛警告牌。
355、Do you have an emergency program(或:contingency plan)?
你們有沒有應(yīng)急計(jì)劃?
356、It must be ready in an emergency condition.必須始終保持良好的應(yīng)急狀態(tài)。
360、Sound fire alarm.發(fā)消防警報(bào)。361、This is a fire drill.這是消防演習(xí)。
365、Remove the rust and paint with anti-corrosive primer.除銹后上防銹底漆。
368、The station bills need to be updated.應(yīng)急部署表須更新。369、Check the expiry date for all foam extinguishers.檢查所有泡沫滅火器的過期時(shí)間。
371、Safety procedure shall be followed at all the time.在任何時(shí)間都應(yīng)遵守安全程序。
373、Colour code all the connection at the loading station.在供給站管線接頭處用顏色標(biāo)明各管線。
375、Don’t switch on during drilling operation.鉆井作業(yè)期間不能合閘。376、Provide two independent means to start the emergency generator engine.應(yīng)急發(fā)電機(jī)柴油機(jī)應(yīng)有兩套獨(dú)立的起動(dòng)方法。
378、Clean the internals of the emergency switchboard.清潔應(yīng)急配電盤內(nèi)部。
直升機(jī)與供應(yīng)船
Helicopter and Supply Vessel 386、Report the weather condition to the pilot.向飛機(jī)駕駛員報(bào)天氣。389、We will take the personnel basket.我們乘坐吊籃.檢修
Repair and Maintenance 390、Have an overall check.進(jìn)行全面檢查。
391、MPI the brake linkage system.對剎車連接系統(tǒng)進(jìn)行磁粉探傷。392、Demonstrate that the make-up cathead can pull 7000 lbs.證明上扣貓頭能拉到7000磅。
393、Determine the origin of the air leak and rectify this.找出漏氣的地方并處理。
394、Adjust the brake band equalizer beam properly.適當(dāng)調(diào)整剎帶平衡梁。
395、Note that the 3000 hour inspection on TDS is due.注意頂驅(qū)的3000小時(shí)保養(yǎng)時(shí)間已到。
397、Repair the handrails on the crown.修理天車臺(tái)的欄桿。398、Function test the anti-freefall brake on monthly basis.每月對天車防碰裝置進(jìn)行功能試驗(yàn)。
399、Get me a spanner, please.請遞給我一把扳手。
400、Renew brake rim because of excessive wear.更換磨損嚴(yán)重的剎車鼓。
401、Clearly mark safe working load(SWL)on the air winch below the rig floor.標(biāo)明鉆臺(tái)底下氣動(dòng)絞車的安全工作負(fù)荷。402、Measure the master bushings for wear.測量主補(bǔ)心磨損情況 403、Have BOP ram opened up for internal inspection.打開 防噴器閘板進(jìn)行內(nèi)部檢查。
404、Install a ground cable on the triplex pump motor.給三缸泵馬達(dá)安 22
裝接地線。
405、We need a 48” pipe wrench.我們需要一把48”的管鉗。406、Strike it with a sledge hammer.用大錘打。407、We want a triangle file.需要一把三角銼刀。408、Tighten up the screw.緊一下螺絲。409、Check it with a level.用水平尺量一下。
410、Put some engine oil.抹點(diǎn)機(jī)油。
411、Have it greased.給它上黃油。
412、Pull out of hole test string.取出測試管串
413、Check all the equipment.檢查所有設(shè)備。
414、There’s something wrong with it.有點(diǎn)毛病。
416、Maintain the hoisting system.保養(yǎng)提升系統(tǒng)。
417、Adjust the brake band.調(diào)整絞車剎帶。
418、Change the oil in the rotary gear box(或:transmission).更換轉(zhuǎn)盤變速箱機(jī)油。
419、Replace one water pump.倒換一臺(tái)水泵。420、It’s quick-discharge air valve.這是快速放氣閥。
421、This clutch needs repair.這臺(tái)離合器需修理。
422、This tong needs replacing.這把鉗要換了。
423、Slip 6 meters of the drilling line.滑移鉆井大繩6米。
424、Cut off 45 meters of the drilling line.切割大繩45米。
425、Check the pump liners and pistons.檢查(泥漿)泵缸套和活塞。
426、The piston has been washed.活塞刺壞了。
427、The supercharge pump doesn’t take in water.灌注泵不上水。
428、Regulate the relief valve.調(diào)整安全閥。
429、This part number is wrong.這個(gè)配件號(hào)不對。
430、The multi-pen recorder has some problem.多筆記錄儀壞了。其他
Miscellaneous
431、No smoking here.此處嚴(yán)禁吸煙。
432、Everything is OK.一切準(zhǔn)備就緒。
433、Speed up please.請快點(diǎn)。
434、The geologist must be present.地質(zhì)人員必須在場。
435、We have to wait on weather.必須等候天氣。
436、There will be strong wind.有強(qiáng)風(fēng)。
437、Give me a hand ,please.請幫一下忙。
438、Do you understand?
明白嗎?
439、No way!
不行!441、Help!Help!
救命
442、Someone is injured.Medic!
有人受傷了。醫(yī)生!443、Call for the medic.叫醫(yī)生。444、Get a stretcher please.拿擔(dān)架來!
445、No more than 4 persons.不能超過4人。446、Drinking liquor is not allowed.不許喝酒。447、Don’t overrun your equipment.不要超負(fù)荷運(yùn)轉(zhuǎn)。448、Be careful at work.工作時(shí)要小心。449、No joking here.別開玩笑。
450、Rig up for logging.準(zhǔn)備(指:安裝設(shè)備)電測。451、What is the next step?
下一步怎么辦?
452、Get everything ready as soon as possible!盡快做好一切準(zhǔn)備!
1.“The upper 300m interval, fill the mud every three joints, later every five joints.Ok?”
“上部300米內(nèi)井段,每下3根套管,灌一次泥漿。以后,每下5根灌一次??梢詥幔俊?/p>
2.He nodded, agreeing with him.他點(diǎn)頭同意。
3.“Use trip tank to measure while filling.In addition, must be slowly while running the casing, prevent to make the formation lose circulation.About this, you must warn your driller.”
“灌泥漿時(shí),用補(bǔ)給罐計(jì)量。還有,下套管時(shí),一定要慢,避免把地層蹩漏。這一點(diǎn)一定要警告你的司鉆!”
4.“Take it easy.I’ll stand beside the driller while running casing.”
“你放心,下套管的時(shí)候,我會(huì)在司鉆旁邊?!?/p>
5.“When to cut guide pipe and nipple up 21 1/4” rotary BOP stack?” “什么時(shí)候割導(dǎo)管,安裝21 1/4”旋轉(zhuǎn)BOP組?”
6.“After the cement setting, you can cut guide pipe and 20”casing, and butt welding the casing head and wellhead assembly.”
“凝固后才可以割導(dǎo)管及20"套管,對焊套管頭及井口組合?!?7.“Fluid loss?” “失水率呢?” 8.“Less than 200ml.” “小于200ml。” 9.“Thickening time?” “稠化時(shí)間?” 10.120-150 minutes.” “120-150分鐘?!?/p>
11.The pump has problems, repair it immediately.If fails, one.”
試壓泵有問題,趕緊修理,如果修理不好,去借一個(gè)來.12.“From whom?” “找誰借?” 13.“Rig 906.” “906隊(duì)?!?/p>
14.“Has the wellhead been aligned?” “井口校正了嗎?” 15.“Of course.” “已校正了?!?/p>
16.“Installed protective sleeve on the casing head?” “裝套管頭保護(hù)套了嗎?” 17.“Sure.” “裝了?!?18.“Back-off.” “倒扣?!?/p>
go to borrow
19.“How many rounds?” “倒多少圈?” 20.“18 to 20 rounds.” “18-20圈。”
21.“What happened?” The Operating Manager came and asked.“發(fā)生什么事了?”作業(yè)經(jīng)理走過來,問道。22.“The liner is worn.” “缸套磨損?!?23.“Serious?” “磨損嚴(yán)重嗎?” 24.“It must be replaced.” “必須更換?!?/p>
25.“Take care of safety while installation.” “安裝時(shí),注意安全。” 26.“We will.” “會(huì)的。”
27.“Notice the floor right now.” “立即通知鉆臺(tái)?!?28.“I’ve noticed the driller.” “已通知司鉆了?!?/p>
29.“Well control may be subdivided into three phases: Primary control;Secondary control and Tertiary control.So, what is the Primary control?” Zhou asked.“井控可細(xì)分為三個(gè)階段:首要控制(一次井控)、二等控制(二次井控)和第三位控制(三次井控)。那么首要控制指什么?”周隊(duì)長問道。30.If it severely loses, we can adopt the following 9 steps: 如果漏失嚴(yán)重,應(yīng)采取以下9個(gè)步驟:(1)Observe the well.觀察井況
(2)Determine the depth of the mud level below the rotary table if practical.FILL THE HOLE.26
如果實(shí)用,確定轉(zhuǎn)盤以下的泥漿液面深度,“灌滿井眼”。
(3)Determine the fluid gradient which can be supported by the lost zone.確定漏失帶維持的流體梯度。
(4)Mix a high concentration pill of various sized lost circulation material in 10-15 m3 of mud and spot this across or above the lost zone.配10~15m3大小不同、含高濃度藥丸堵漏材料的堵漏泥漿并注入到漏失帶(穿過或在漏失帶上方)。
(5)Subsequently pull the bit above the lost zone, preferably into the casing, and circulate a lighter fluid throughout the system to regain returns.Always maintain the total hydrostatic head in excess of pore pressures in open hole.隨后從漏失帶起出鉆頭,最好起到管鞋內(nèi),循環(huán)輕質(zhì)液體貫穿體系以獲得返出。循環(huán)時(shí),總是保持總的靜水壓頭超過裸眼里的孔隙壓力。
(6)Attempt to seal off the lost zone by spotting special lost circulation plugs, such as: Gunk, pills, cement plugs, etc.嘗試注入專用堵漏塞封閉漏層,如:油泥、泥丸、水泥塞等。(7)Attempt to cement off the lost zone.嘗試用水泥封隔漏層。
(8)If field experience has proven LCM materials ineffective during severe losses, pumping of cement as soon as possible will often be the best alternative.嚴(yán)重漏失期間,如果現(xiàn)場經(jīng)驗(yàn)證明LCM材料無效,盡可能快地泵入水泥堵漏常常是最佳的替代辦法。
(9)When expecting lost circulation problems a LCM pill should be premixed.”
預(yù)料到會(huì)出現(xiàn)井漏事故時(shí)應(yīng)預(yù)先調(diào)配LCM藥丸?!?/p>
31.In order to reduce the swabbing effect, it is good practice to follow these precautions: 為了減少抽汲效應(yīng),最好遵循下列措施:
? Perform a complete circulation before pulling out.27
起鉆前完整循環(huán)一周;
? Condition the mud to optimize its rheological properties;
調(diào)節(jié)泥漿,優(yōu)化其流變特性; ? Limit string pulling out speed.限制起鉆速度。
32.“How many methods to circulate out kicks?” “有幾種循環(huán)帶出井涌的方法?”
33.“Four.The Driller's Method;The Wait and Weight Method(supervisors method);The Volumetric Method and Bullheading.Now, listen to the brief introduction first, then the details, OK?”
“有四種。司鉆法;等候及加重法(監(jiān)督法);體積法;壓回地層壓井法?,F(xiàn)在,先聽我概述一下,然后再細(xì)講,好嗎?” 34.“That’s correct.Now I’ll issue the preparations for a drill.“正確?,F(xiàn)在我要講講井控演習(xí)的準(zhǔn)備工作有哪些:
(1)Ensure equipment for blowout prevention is always operational and available.保證防噴設(shè)備一直有效運(yùn)行;
(2)Ensure an up-to-date pre-kick record is available at all times.保證最新的預(yù)井涌記錄一直有效;
(3)Check the capacity of the Koomey(accumulator)unit(must be at least sufficient to close and open all preventers once and then to close the annular preventer and 1 ram type preventer again).;
檢查Koomey(儲(chǔ)能)裝置的容量(容量必須至少足夠關(guān)閉和打開所有防噴器一次,然后再關(guān)閉環(huán)空防噴器和1個(gè)閘板式防噴器);(4)Check that the following are present:
檢查下面提供的東西:(a)(b)(c)Adequate fluid in the accumulator Kelly cock(in open position)with wrench on the rig floor Crossovers on the kelly cock for tubulars in the drill string or
儲(chǔ)能器里有適當(dāng)液體;
方鉆桿旋塞(處于開位),鉆臺(tái)上有用于(操作方鉆桿旋塞)扳手;
tubing
方鉆桿旋塞上的轉(zhuǎn)換(工具)用于(連接)鉆柱或油管里的管子;(d)(e)Gray valve and matching circulating sub on the rig floor Back-up circulating equipment(hose and/or chicksan lines
鉆臺(tái)上有格雷閥及匹配的循環(huán)頭; hooked up to standpipe manifold.備用循環(huán)設(shè)備(軟管和/或鉤在立管管匯上的活動(dòng)彎頭管線);(f)Short pup joint(to connect to top drive).短節(jié)(連接頂驅(qū));
(5)Ensure the pit level and trip tank level indicators and the flow show are properly adjusted and functioning.保證液面指示器、補(bǔ)給罐液面指示器和流量顯示器調(diào)節(jié)適當(dāng)且功能正常;
(6)Ensure the audible alarm in the panel by the Driller is working.Note: The alarm must always be switched on.保證司控臺(tái)上的視聽報(bào)警器工作正常。提示:報(bào)警器必須一直打開;(7)Ensure the well remains filled via the trip tank at all times.保證一直用補(bǔ)給罐往井里灌漿;
(8)Place the wrench for closing the kelly cock within hands reach.關(guān)閉方鉆桿旋塞扳手唾手可得;
(9)Ensure the valves on the BOP, kill lines, choke lines and choke manifold are correctly lined up according to the Shut-in Procedure.保證BOP上的閥門、壓井管線、節(jié)流管線和節(jié)流管匯根據(jù)關(guān)井程序正確排列;
(10)Ensure the indicators for monitoring closing / opening of BOP rams is working correctly.確保監(jiān)視BOP閘板關(guān)/開指示器工作正常。
35.The above preparations must be done before a drill.Understand?” 每次井控演習(xí)都必須做上述準(zhǔn)備工作,明白嗎?” 36.“Yes, sir.We usually do like that.” “明白,先生。我們也是這樣做的?!?/p>
37.”The guide shoe and float-collar have been connected? “引鞋和浮箍都接好了嗎?”
38.Yeah, they are laid down on the catwalk.Will you go to check? “接好了,放在跑道上,要不要去看一下?”
第三節(jié) 鉆井泥漿術(shù)語
1、Careful and keep away.It’s caustic soda.小心,離遠(yuǎn)點(diǎn),這是燒堿。Thank you.謝謝。
2、Mix two bags of LCM in mud system.在泥漿中加兩袋讀漏劑。OK.好吧。
3、Don’t forget to record trip tank volume during tripping.起下鉆中不要忘了記錄計(jì)量罐液量。
4、There is an increase in No.3 mud tank, because I’m transferring mud to that tank.三號(hào)罐液面增加了,因?yàn)槲以谙蚰莻€(gè)罐倒泥漿。
5、We need lightweight, low-viscosity mud in surface drilling.我們要用低比重、低粘度泥漿打表層。
6、Now we pump 5 barrels of hi-vis mud to sweep the hole.You tell me how many strokes.現(xiàn)在我們打5桶高粘清掃井眼,你告訴我是多少?zèng)_。
7、Get weighting materials(chemicals)ready.We need to increase mud weight.把加重材料(藥品)準(zhǔn)備好,我們要提比重。
8、The sand trap if full of cuttings.It needs cleaning.沉砂罐砂子(鉆屑)滿了,需清除。
9、The tripping out is stopped for flowcheck.起鉆停下來了,觀察溢流。
10、How many barrels(strokes)to make a circulation to surface? 循環(huán)一周需多少桶(沖)?
11、Get the water tank full all the time.要保持清水罐的水滿。
12、Inform drill floor and mud logging unit before you transfer mud.倒泥漿前要通知鉆臺(tái)和錄井。
13、Keep good communication with floor while killing the well.壓井時(shí)一定要與鉆臺(tái)溝通好。
14、One shaker screen is damaged.We need to change a new one.31
一塊篩布?jí)牧耍覀冃枰獡Q新的。
15、Get water ready.We’ll flush the line after cementing operation.把水準(zhǔn)備好,固井作業(yè)后要清洗管線。
16、Use 5 barrels of hi-vis mud to spot the bottom before tripping out.起鉆前用5桶高粘在井底打封閉。
17、Circulate the hole clean with two returns.(Make two circulations to get the hole clean.)
循環(huán)兩周把井眼洗井。
18、How much mud do we have in storage(in reserve tank).我們有多少儲(chǔ)備泥漿?
19、I want the mud boy(periodically)check the mud weight and viscosity in every half an hour.我要泥漿工(定期)每半小時(shí)檢查泥漿比重和粘度。
20、There are three basic types of drilling fluids: air(or gas), water-based mud, and oil-based mud.有三種基本類型的鉆井液:空氣、水基泥漿和油基泥漿。
第四節(jié) 常用安全術(shù)語1、2、3、4、5、6、7、8、9、H2S(hydrogen sulfide)硫化氫
Muster point(Muster board)緊急集合點(diǎn)(緊急集合點(diǎn)標(biāo)識(shí)牌)Extinguisher 滅火器 Wind sock 風(fēng)向標(biāo)
SCBA(self-contained breathing apparatus)自給式呼吸器 Oxygen, acetylene 氧氣,乙炔 Alarm 警報(bào) Stretcher 擔(dān)架 Ambulance 救護(hù)車
10、Clinic 診所
11、Emergency team 應(yīng)急小組
12、Fire pump, Fire drill, Fire hose, ax, rope 消防泵,消防演習(xí),消防水龍帶,消防斧,消防繩
13、JSA(job safety analysis)工作中安全因素分析
14、HSE(health, safety and environment)健康,安全,環(huán)保
15、Escaping route 逃生路線
16、Inflammables.易燃物品
17、Work Permit(Permit to Work)工作許可(證)
18、No smoking 不許吸煙
19、To kill the well 壓井 20、Safety meeting 安全會(huì)
21、Safety meeting for running casing, liner, electric log 下套管,尾管,電測安全會(huì)
22、PPE(personal protection equipment)勞保用品
23、Special operation 特殊作業(yè)
34、Vehicle inspection 車輛檢查
35、Housekeeping 打掃衛(wèi)生
36、Crane 吊車
37、MSDS(material safety data sheet)泥漿藥品安全使用手冊
38、first aid box 急救箱
39、Helmet安全帽 40、Safety glasses 護(hù)目鏡
41、Glove 手套
42、Fall arrester 防墜器
第五節(jié) 鉆井設(shè)備英語
Ⅰ Rig’s function tested(1)
Supervisor: Mr.Liu.Let’s do rig’s function tested.劉先生,我們進(jìn)行鉆機(jī)的測試
Rig manager: Ok!We have finished 100% rig up and modify a lot according to your requirement.好的。根據(jù)你的要求,我們已經(jīng)完成了百分之百的安裝和套改工作。Supervisor: That’s good.Let’s go.很好。我們走。
Rig manager: Will it start from the rig floor? 從鉆臺(tái)開始嗎? D.S.: yes.好的。
R.M.: Mr.Wang(driller’s name), Ask engineman start one engine and switch on SCR.We’ll test rig’s function.王先生(司鉆的名字)告訴司機(jī)啟動(dòng)一臺(tái)柴油機(jī)和合上可控硅。我們準(zhǔn)備測試鉆機(jī)的功能。
Driller: We’re ready.Where will we start from? 我們準(zhǔn)備好了,從哪里開始? D.S.: Test Emergency shut off at first.首先測試緊急剎車
D : Please check sir.SCR running lights is off now.SCR is off line.請檢查先生??煽毓柽\(yùn)轉(zhuǎn)指示現(xiàn)在熄掉,可控硅線脫開 D.S.: Ok.Crown block protector valve.好,天車保護(hù)閥
D:
Please sir.Drawworks stop.Protector works reliably.請。絞車停止,保護(hù)工作可靠。
D.S.: Have you calibrated make-up tong gauge, weight gauge, and mud monitor system.你已經(jīng)標(biāo)定安裝大鉗扭矩表,指重表和泥漿監(jiān)測系統(tǒng)嗎?
D.: Let me show you.我演示給你看
D.S.: You do very well.test high pressure mud system.你做的很好,測試泥漿高壓系統(tǒng)
D.S.: Low pressure is 500psi for 5 minutes.High pressure is 3000psi for 5 minutes.低壓是500Psi保持5分鐘,高壓是3000Psi保持5分鐘
R.M.: Ask A.D.check pump and Valve manifold on ground.You check valve manifold on rig floor carefully.Ensure all valves closed or opened is in correct way.You’re charge of pressure test as per company man requirement.告訴副司鉆檢查泵和地面組裝閘門,確保所有的閘門關(guān)或開是的方法。按照監(jiān)督的每一個(gè)要求你負(fù)責(zé)壓力測試。
D:
(Tell floorman).We’ll test NO.1 pump at first step.Please ask A.D.reset relief valves at 3500psi, and check all valves close or open are in correct position.Please give me a signal after he is ready.(告訴鉆工)我們第一步將工測試1號(hào)泵告訴副司鉆設(shè)置保險(xiǎn)凡爾在3500Psi檢查所有的閘門關(guān)或開在的位置,他準(zhǔn)備好以后給我一個(gè)信號(hào)。ⅡFunction tested(2)D.S: Well.Run the TDS at 50100150rpm.I’ll check whether it has noise and oil leak for TDS.好。運(yùn)轉(zhuǎn)頂驅(qū)在50、100、150rpm,我檢查頂驅(qū)是否有雜音和漏油。D:(5 minutes later)we have changed those oil pipes and fits during rig move.I can sure oil leak will not be occurred again in this well.(5分鐘后)我們已經(jīng)換掉那些油管線和安裝在鉆機(jī)搬遷期間。我可以保證在這口井漏油將不會(huì)發(fā)生。
D.S: well.Stop.Let’s check the illuminating system of the mast.好。停,我們檢查井上的照明系統(tǒng)
D: Ok.2minutes, Let me look for electrician come here.好。2分鐘,我找一下電工到這兒來 D.S.: Where is your switch panel? 36
你們的配電盤在哪兒? Elec: it’s in the doghouse.在司鉆休息室
D.S: Are they fit API standard? 安裝符合標(biāo)準(zhǔn)嗎?
Elec: Don’t worry.I have oilfield experience for 10 years.There is hazard zone on rig floor and around rig.Any electric equipment should abide zone-1 section A standard.不要擔(dān)心,我有十年的油田經(jīng)驗(yàn),在鉆臺(tái)和鉆機(jī)周圍有一個(gè)危險(xiǎn)區(qū)域,任何電動(dòng)設(shè)備應(yīng)該遵守A給標(biāo)準(zhǔn)部分。D.S.: Are there safety lines with lights on the mast.井架上的燈有保險(xiǎn)繩嗎?
Elec: I install safety lines for every light.每一個(gè)燈我安裝了保險(xiǎn)繩
Elec: 10 sets of light assembly and 40 lamps in storage house.2 each kinds of switches as you know, our base is 100 kilometers away from here.正如你所知道的,10套燈組和40個(gè)燈泡在材料房,每種開關(guān)有2個(gè),從這兒到我們的基地是100公里。
D.S.: let’s go to mud tank, check solid control system.我們?nèi)ツ酀{罐檢查一下固控系統(tǒng) D: sorry.Toolpusher is in charge of it.對不起,帶班隊(duì)員負(fù)責(zé)它
T.P.: Solid control system are consisted of 3 shale shakers 1 degasser, 1 desander, 1 desilter, 6 mud guns and 6 agitators.固控系統(tǒng)包括3個(gè)振動(dòng)篩,1個(gè)除氣器,1個(gè)除砂器,1除泥器,6個(gè)泥漿柱和6個(gè)攪拌器
D.S.: What size is the screen on shale shaker? 振動(dòng)篩是什么型號(hào)的篩布?
T.P.: There is 100 meshes on this shale shaker, others are 175 meshes.這個(gè)振動(dòng)篩是100目的,其它是175目
D.S.: Please change it to 80 meshes for spudding;turn on shale shaker one 37
by one.Let’s check work condition.為了開鉆換為80目,一個(gè)一個(gè)的振動(dòng)篩啟動(dòng),我們檢查一下工作情況。T.P.: Ok.I’ll ask mud boy to do this work.好。我告訴泥漿工做這項(xiàng)工作
D.S.: Where are desilter, desand and supply pump? 除泥器,除砂器和供漿泵在哪兒?
T.P.: There are desilter and desander on the NO.3 shale shaker.Supply pump is located at each side of mud tank.除泥器和除砂器在3號(hào)振動(dòng)篩,供漿泵位于每一個(gè)泥漿罐的旁邊。D.S.Oh, I see.Thanks.Please open all cones I want to check inside whether they are worn out or plugged off.哦,我明白了,謝謝。請展開所有的牙輪,我想檢查里面是否磨損或堵塞
T.P: We change 3 cones, all nozzles and clean it inside before rig up.在安裝之前,我們換了3個(gè)牙輪,所有的水眼和清洗了它的內(nèi)部。D.S: Turn on pump.開泵
T.P.: I’m sorry.There is fresh water in tank even if they work.We can’t see anything out of cone.對不起,即使它們的工作罐里有清水我們不能看出牙輪的任何情況。D.S: Oh.You’re right.I forget.你是對的,我忘了。Ⅲ Mud pump A: Where is mud pump? 泥漿泵在哪兒?
B: Not here on rig floor.Follow me then show you.不在鉆臺(tái)上,跟我來我指給你看(two minutes later兩分鐘后)B: Here.There are two mud pumps sucking mud direct from mud tank NO.3.這里。有兩條泵上水管線對準(zhǔn)3號(hào)泥漿罐
A: What size of line on mud pump now? 現(xiàn)在泥漿泵管線是什么型號(hào)的? B: 160mm.160mm.A: Have you charged nitrogen to the pulsation dampener on high-pressure discharge side? 你在空氣包高壓端充入氮?dú)饬藛幔?B: Yes.Mechanic did it yesterday.是的。昨天機(jī)械師已經(jīng)做了
A: Do you know safety precautions peculiar to this job? 你知道這個(gè)工作特有的安全預(yù)防措施嗎?
B: Yes.A working permit should be done.Ensure charging gas is nitrogen, etc.是的。一個(gè)工作在允許的情況下應(yīng)該做。確保充的氣體是氮?dú)獾鹊?。A: How long time do you spend changing one line? 你花費(fèi)多長時(shí)間換一根管線? B: Normally.It’s 20 minutes.正常情況20分鐘。
A: Have you cleaned suction filter? 你清洗濾網(wǎng)了嗎? B: Yes.We do it each shift.是的,每個(gè)班我們都清洗。A: How many strokes now? 現(xiàn)在泵沖
Ⅳ Hoisting system A: What is hoisting system? B: The hoisting system is made up of the drawworks.The crownblock, the traveling block and drilline.A: What is the drawworks? B: The drawworks is a big, heavy piece of machinery, which rails and low 39
heavy loads.Example.Pull out or put in drillpipe, casings.A: What’s is the cathead?
B: Two cathead are mounted an each end of the catshaft, which extends out from both side of the drawworks.It can be used to makeup or break out the drill string.So we call them makeup cathead, break out cathead.They are friction cathead.A: Where is hydraulic cat head? B: Oh.Floor man call it easy-torque.It is opposite side of driller.It plays a important part when breakout and make up the bigger size drill collar.A: You know.The brake system is very important device on drawworks.Can you describe it for me? B: I’m glad.I agree with you.It has a main brake and an auxiliary brake.We always see two types of main brake.One is brand type brake, the other is disco main brake.They can stop drum by friction.A;what’s an auxiliary brake?
B: An auxiliary brake is hydraulic or electric brake.It can work with main brake together.A: Which kind of auxiliary brake is fitted with your drawworks? B: It’s an Eddy current brake
A: Does fit a flow sensor and temperature alarm to the brake cooling water return line? B: No.There is only a flow sensor was fitted on return line.A: Where is traveling block and hook? B: please see from top to bottom is the crown block, traveling block, hook, and swivel that hose is called rotary hose.A: What size of drilling line? B: It’s 1 3/8”.A: Have you NDT inspected deadline anchor? B: As you know.Deadline anchor was inspected at last well.ⅤRotating Equipment 40
A: Can you tell me rotating equipment.B: Let me try the assembly of members between the swivel and the bit is called rotating equipment.A: Please tell me all parts of the assembly.B: Ok.It includes the Kelly, drill pipes, drill collars.A: What’s Kelly?
B: It’s a short piece of a square or hexagonal pipe.Whichit is drived by rotary table.A: What function does swivel have? B: It’s a important part in drilling action, because swivel sustains the weight of the drill string.It permit the string to rotate and offer a rotating, pressure tight seal and passageway for drilling mud.A: How about rotary table? B: Rotary table locate the center of drilling floor.It transfer the rotating motion to the drill string, the drill string drive bit to rotate.Then bit cut and grind rock.41
第六節(jié) 石油鉆井英語情景會(huì)話
一、Inspection of Site Construction鉆前工程驗(yàn)收
----“Hello.This is John speaking.I’d like to talk with rig manager.” “你好!我是監(jiān)督John,我要同平臺(tái)經(jīng)理講話!”----“Hi, John.How nice to hear you!What’s the matter?” “你好,John, 聽到你的聲音真高興!什么事?”----“The new location is ready.” “新井場出來了?!?---“Really?That’s terrific.” “是嗎?太好了!”
----“Bring some guys to go there with me for inspection, OK?” “能帶幾個(gè)人同我一道去看看嗎?”
----“Ok.In five minutes, I will meet you at the well-site.” “行,5分鐘后,我與你在井場匯合?!?---“Ok.See you later.” “好的,一會(huì)兒見。”----“See you later.” “一會(huì)兒見?!?/p>
二、Rig move 搬遷
----When will you begin to move ?
你們什么時(shí)候開始搬遷?----At 8:00 tomorrow morning.明天早晨8:00。
----How many moving operations(loads)there will be ?
搬遷需要多少車次?----100 trips in total.總共100車次。
----How many cranes and trucks will you need for moving ?
你們需要多少吊車和卡車?
----We will need 6 cranes and 40 trucks.我們需要6臺(tái)吊車和40臺(tái)卡車。----How about the road condition ?
路況怎么樣?
----The road condition is not good, so tell drivers to take care.路況不好,告訴司機(jī)小心點(diǎn)。
三、Rig up 安裝設(shè)備----When do you start to rig up ?
你們什么時(shí)候開始安裝設(shè)備?----Tomorrow.明天。
----How long will it take you to finish installation ?
整個(gè)安裝需要多長時(shí)間?----Five days is enough.五天足夠了。
----What time are you going to raise the derrick?
你們什么時(shí)候起井架?----At 4:00 this afternoon.今天下午4:00。
----Are you satisfied with the pace of installation?
你對安裝進(jìn)度滿意嗎?----Not bad.不錯(cuò)。
四、Equipment(spudding)inspection 設(shè)備(開鉆)驗(yàn)收
----This morning we’ll inspect the rig site and afternoon we’ll inspect the campsite.Are you ready?
上午驗(yàn)收井場,下午驗(yàn)收營地。準(zhǔn)備好了嗎?----Yes, we are ready.準(zhǔn)備好了。
----Has aligned the wellhead with 9” DC(drill collar)?
用9”鉆鋌校正井口了嗎?----Sure, of course.校正了。
----Do you prepare eyewash station for workers?
你們?yōu)閱T工準(zhǔn)備洗眼臺(tái)了嗎?----Of course.It’s over there.準(zhǔn)備了。在那邊。----Prepared fire sand?
準(zhǔn)備消防砂了嗎?
----Sure, at the left side of the substructure.當(dāng)然了,在底座左邊。
五、Drilling鉆進(jìn)
(一)----“How about the well condition?” “井況如何?”----“Normal Drilling.” “正常鉆進(jìn)?!?---“The depth now?” “現(xiàn)在的井深是多少?”----“1800 meters.” “1800米?!?---“The level now?” “現(xiàn)在的鉆進(jìn)層位?”----“Dongying.” “東營”
----“Tell me the present drilling parameters, OK?” “告訴我目前的鉆井參數(shù),好嗎?”
----“Rotary speed, 63rpm;Pump pressure, 17.5 to 18.5Mpa;WOB(Weight on bit), 14 tons;Torque, 5000ft.lb;Pump rate, 650gpm;Pump stroke, 195spm(two pumps).”
“轉(zhuǎn)速63rpm(轉(zhuǎn)/分),泵壓17.5-18.5Mpa,鉆壓14噸,扭矩5000ft.lb(磅·英尺),排量650gpm(加侖/分鐘),泵沖(雙泵)195spm?!?/p>
六、Drilling 鉆進(jìn)
(二)----Hey, George.Over here.嘿,George。過來。----What’s up, Bob?
怎么啦,Bob?----Get me the mud man.給我把泥漿工叫過來。----Right, I’m going.好,我就去。
----Oh good, there you are, Peter.太好了,Peter 你來了。----What can I do for you, Bob?
Bob,找我有什么事?----The hole is getting tight.井眼有點(diǎn)縮徑。----Tight?
縮徑?
----Yup.How is the mud?
是的。泥漿怎么樣?----The mud is OK.泥漿正常。
----What’s the bottoms up?
遲到時(shí)間是多少?----About an hour.大約一小時(shí)。
七、Drilling 鉆進(jìn)
(三)----Hey, George!Over here!45
嘿,George!過來!----Yeah?
什么事?
----We’ll have to trip the pipe.我們只好起鉆了。----What?
什么?
----I said we’ll have to trip the pipe.我說我們只好起鉆了。----What’s rong, Bob?
Bob,出了什么事?
----I’m not sure.We’ll have to bring it up and find out.我現(xiàn)在還說不上。我們只有起完鉆才能弄清楚。----Any ideas?
怎么回事(你有什么想法)?----I think the bit has gone.我估計(jì)是鉆頭磨光了。
八、Trips 起下鉆
----Does the table have a bouncing phenomena?
轉(zhuǎn)盤有憋跳現(xiàn)象嗎?----A little, not very obvious.有一點(diǎn),不很明顯。
----Have any change of cutting samples from mud logging? 錄井方面有沒有砂樣變化?----No change.Still sandstone.沒有,還是砂巖。
----How many hours is the bit in the hole? 這只鉆頭打了多久?----64 hours.64小時(shí)。
----What time are we going to pull out of hole(POOH)?
我們準(zhǔn)備什么時(shí)候起鉆?
----Circulate now, half hour later, pull out of hole(POOH)to change bit.現(xiàn)在循環(huán),半小時(shí)后起鉆換鉆頭。----Any tight hole?
有縮徑嗎?
----No, hole is in good condition.沒有,井下情況良好。
九、Run casings 下套管
----Have the casing tools been delivered here?
套管工具送到了嗎?----Not yet.Maybe this afternoon.還沒有,可能今天下午送到。
----How long will it take you to run in hole with these casings?
你們需要多長時(shí)間下完這些套管?----About 12 hours.大概12個(gè)小時(shí)。
----How many joints have been run? 已經(jīng)下了多少根9 5/8”套管?----196 joints, about 2450m in length.196根,大約2450米長。----The depth of the casing shoe? 套管鞋深度?----At 2188m.2188米。
----How long are we going to circulate before cementing?
固井前我們要循環(huán)多長時(shí)間?----2 hours.2 小時(shí)。
十、Cement job 固井作業(yè)----Where is the cement head?
水泥頭在哪?----It’s over there.在那邊。
----How many cubics of tail and lead slurry need to be mixed up? 需要配多少方尾漿和引漿。----tail 7.6 m3(48bbl);lead 38 m3(239bbl).尾漿7.6方(48桶);領(lǐng)漿38方(239桶)。----How many pressures to be tested for the cement lines?
固井管線試到多高壓力?----3000 psi.3000 psi。
----What’s the pressure of bump plug?
碰壓壓力是多少?----2000 psi.2000 psi。
----Do we need hold the pressure?
我們需要憋壓嗎?
----Yes, Hold the pressure for 5 minutes.憋壓五分鐘。
----Are you satisfied with the cementing operation?
你對這次固井施工滿意嗎?----Yes, very much.非常滿意。
附錄一:平臺(tái)人員、作業(yè)者及服務(wù)公司人員名稱
一、平臺(tái)人員崗位名稱
承包商人員(Contractor’s Personnel): Rig Manager
平臺(tái)經(jīng)理
Equipment Supervisor
設(shè)備總監(jiān) Materials Supervisor
材料監(jiān)督 Senior Toolpusher
高級(jí)隊(duì)長 Tourpusher 值班隊(duì)長 Driller
司鉆
Assistant Driller(簡AD)副司鉆 Derrickman
井架工
Floorman(或roughneck)鉆工 Crane Operator
吊車司機(jī) Roustabout
場地工 Chief Mechanic
機(jī)械師 Electrical Engineer 電氣師 Repairman
修理工 Motorman
柴油機(jī)司機(jī) Welder
焊工
Radio Operator
電報(bào)員
Warehouse Man(或Store Keeper)材料員 Medic
醫(yī)生
Safety Supervisor
安全監(jiān)督 Interpreter(或translator)翻譯 Cook
廚師 Laundry Man
洗衣工
二、作業(yè)者及服務(wù)公司人員名稱(Operator’s Personnel and Service Company Personnel): Drilling Superintendent
鉆井監(jiān)督
Company Man(或Operator’s Representative)
公司代表 Geologist
地質(zhì)師
Mud Logging Engineer(或Mud logger)泥漿錄井工程師 Sample Catcher
撈砂工 Mud Engineer
泥漿工程師 Cementer
固井工
Cement Engineer
固井工程師 Testing Engineer
試油工程師 Coring Engineer
取芯工程師
Wireline Logging Engineer
電測工程師
附錄二:主要設(shè)備名稱
一、平臺(tái)主要設(shè)備
鉆井設(shè)備(Drilling Equipment): Drawworks 絞車 Rotary Table
轉(zhuǎn)盤 Bushing
補(bǔ)心
Top Drive System(簡TDS)
頂驅(qū) Swivel
水龍頭 Crown Block
天車 Travelling Block
游車 Hook
大鉤 Derrick
井架
Pipe Spinning Wrench
鉆桿氣動(dòng)扳手 Ezy-Torq
液壓貓頭 Elmagco Brake
渦磁剎車 Iron roughneck
鐵鉆工
Pipe Racking System
鉆桿排放系統(tǒng) Drill String
鉆柱 Drilling Sub
鉆井短節(jié)
第二篇:英語教材整合
英語教材整合在新課程理念下的英語教學(xué)實(shí)踐中,教師已經(jīng)普遍認(rèn)認(rèn)識(shí)到我們所使用的課本應(yīng)不只是教學(xué)的全部內(nèi)容,教材應(yīng)該是可變的、發(fā)展的和開放的。因此,教師必須摒棄“教教材”的傳統(tǒng)觀念,樹立“用教材教”的教學(xué)思想,靈活和創(chuàng)造性地使用教材。下面我就自身在開放式教學(xué)理念指導(dǎo)下,如何結(jié)合實(shí)際教學(xué)需要,對小學(xué)英語教材的內(nèi)容、編排順序、教學(xué)方法等方面進(jìn)行適當(dāng)?shù)厝∩岷驼{(diào)整,靈活而有創(chuàng)造性地使用教材作一定探討。
一、整合起始年級(jí)教材,確定與4A銜接目標(biāo)。字母提前,單詞拼寫早滲透。把提前到3A第七至十一單元的字母集中到開學(xué)初四會(huì)掌握,并且在初教字母時(shí)就滲透單詞的拼寫。例如教了字母A—G后,教師可以出示單詞bag,當(dāng)學(xué)生讀出該單詞中的每個(gè)字母時(shí),教師重復(fù)B-A-G, bag, 并且說,“真棒!這幾個(gè)字母我們都學(xué)過了,那誰愿意像老師那樣來拼拼看?”當(dāng)學(xué)生正確地拼出該單詞后,教師可以獎(jiǎng)勵(lì)一張寫有該單詞的貼紙給他,讓他貼在書包上。這時(shí),其他學(xué)生一定也會(huì)躍躍欲試的。當(dāng)然,教師還可以經(jīng)常出示一些含有未教過的字母的單詞,如 desk, 在教字母Kk時(shí)再出示此單詞,由此能大大提高單詞的復(fù)現(xiàn)率,也增加了學(xué)生對需要識(shí)記的單詞的熟悉程度。通過這種方式,在三年級(jí)階段可以讓學(xué)生掌握如dog, cat, egg, apple, tea, cake, bed, desk, box, car, bus 等B板塊的三分之一以上的詞匯,這不僅提高了學(xué)生在脫離圖片的情況下認(rèn)讀單詞和句子的能力,而且為學(xué)生跨入四年級(jí)高高的門檻前預(yù)先鋪設(shè)了一級(jí)臺(tái)階,使學(xué)生不至于跨不過去而摔倒,從而使他們對繼續(xù)學(xué)習(xí)4A 充滿信心和期待。
二、適當(dāng)?shù)匮a(bǔ)充和刪減 教材內(nèi)容進(jìn)行 小學(xué)英語教材內(nèi)容有較大的靈活性和開放性,因而具有一定的彈性和伸縮性,允許使用者根據(jù)自己的實(shí)際需要,對教材內(nèi)容進(jìn)行適當(dāng)?shù)厝∩岷脱a(bǔ)充。在教材使用過程中,教師可以根據(jù)需要對教材內(nèi)容進(jìn)行適當(dāng)?shù)匮a(bǔ)充,以使教材的內(nèi)容更加符合學(xué)生的需要和貼近學(xué)生的實(shí)際生活。例如:學(xué)習(xí)英語,詞匯是基礎(chǔ)。如果僅憑教師上課反復(fù)出現(xiàn),學(xué)生還是未必能記住他們。牛津教材那么多的單詞如果靠死記硬背,那也只會(huì)前背后忘。教學(xué)活動(dòng)的難度過高,因此,教師在一開始就要教給學(xué)生科學(xué)的、行之有效的記憶單詞的方法,從而降低活動(dòng)難度,對于三年級(jí)的學(xué)生來說,巧用遷移,用拼音的方法建立部分輔音字母與發(fā)音的對應(yīng)關(guān)系先幫助他們找到輔音字母與發(fā)音的對應(yīng)關(guān)系就比較容易接受。教師可以結(jié)合單詞,把漢語拼音中的聲母與英文字母比
較,實(shí)現(xiàn)拼音到英文字母的正遷移。如聽到單詞中有[b]的音,就聯(lián)想起字母b,并使用chant的形式加強(qiáng)學(xué)生記憶,如[b][b]bus, [b][b]bed,[b][b]bike, [b][b]book 等。用以上方法,學(xué)生不難聯(lián)想單詞dog中的[d]就是d發(fā)的,[g] 就是g發(fā)的。象 ch, sh , th等輔音字母組合發(fā)音與字母的對應(yīng)也可以讓學(xué)生逐步知曉。這樣,拼單詞 dog,bed,pen,fish等單詞時(shí),學(xué)生只要記住其中的元音字母就行了。當(dāng)然,輔音字母也有好幾個(gè)字母并不是音形一一對應(yīng)的,如[k]就有三種可能:c, k, ck,教師要通過實(shí)例,讓學(xué)生自己發(fā)現(xiàn)在詞首的[ k]大多數(shù)是c發(fā)的,碰到諸如單詞key時(shí),教師只要提醒學(xué)生該詞首字母是 k。而在詞尾發(fā)[k]的以 k, ck居多。
三、替換教學(xué)內(nèi)容和活動(dòng) 教學(xué)內(nèi)容和活動(dòng)同樣有一定的彈性和伸縮性。在教學(xué)過程中,教師可以根據(jù)實(shí)際教學(xué)需要,對教材中不太適合的內(nèi)容或活動(dòng)進(jìn)行替換。例如:“Act it out”這一活動(dòng),由于很難創(chuàng)設(shè)場景讓學(xué)生表演,就可換成猜謎游戲。由學(xué)生把學(xué)過的學(xué)習(xí)用品藏在教室內(nèi),用“Where is the...?”提問,其余學(xué)生用“Is it in the...?/Is it on the...?/Is it under the...?”句型來猜,同樣可以達(dá)到鞏固應(yīng)用in,on,under三個(gè)介詞的目的。
四、擴(kuò)展教學(xué)內(nèi)容或活動(dòng)步驟 在某些教材中,教學(xué)活動(dòng)的難度過高或過低的現(xiàn)象時(shí)有發(fā)生。如果教師認(rèn)為某個(gè)活動(dòng)太難,就可以擴(kuò)展活動(dòng)的步驟,增加幾個(gè)準(zhǔn)備性或提示性的步驟,從而降低活動(dòng)難度。如果活動(dòng)太容易,教師可以對原有的活動(dòng)進(jìn)行延伸。教師還應(yīng)設(shè)法拓寬教學(xué)資源的途徑。比如:英語電視節(jié)目,如“Outlook English”、音像資料,如“Gogo Englilsh, Disney English”、多媒體光盤資料、各種形式的網(wǎng)絡(luò)資源,以及報(bào)刊雜志等。教師應(yīng)充分利用這些資源,采用不同的形式讓學(xué)生親身感受和體驗(yàn)語言及其運(yùn)用。
五、適當(dāng)調(diào)整教學(xué)順序根據(jù)學(xué)生的認(rèn)知特點(diǎn)、心理特點(diǎn)和教學(xué)的實(shí)際情況,教師可對教材內(nèi)容的順序進(jìn)行適當(dāng)?shù)恼{(diào)整,使其更符合學(xué)生的興趣和能力需要,更加貼近學(xué)生的實(shí)際生活,以引導(dǎo)學(xué)生更有效地學(xué)習(xí)。
1、模塊之間的調(diào)整:模塊之間的調(diào)整是指依據(jù)學(xué)生的興趣和認(rèn)知特點(diǎn),對各模塊的順序進(jìn)行調(diào)整。例如:模塊與模塊之間有相關(guān)的內(nèi)容(比如:家人、工作、喜好等),如果教學(xué)時(shí)將相關(guān)內(nèi)容進(jìn)行調(diào)整,就能幫助學(xué)生有效地建構(gòu)知識(shí)體系。再如:教材中某個(gè)模塊的內(nèi)容恰巧與學(xué)生現(xiàn)實(shí)生活中發(fā)生的某些事情相關(guān),如果在語言知識(shí)的銜接方面沒有太大問題,就可以提前教學(xué)這個(gè)模塊。
2、模塊內(nèi)的調(diào)整:英語教材每個(gè)模塊都有三個(gè)單元,模塊內(nèi)的調(diào)整指教師根據(jù)模塊內(nèi)的邏輯
順序,對教學(xué)內(nèi)容作重新調(diào)整,從而更好地體現(xiàn)知識(shí)的系統(tǒng)性和完整性。
3、單元內(nèi)調(diào)整:單元內(nèi)調(diào)整指重新調(diào)整和組合某一單元內(nèi)幾個(gè)部分的順序。例如: Activity 1:Listen and point. Activity 2:Point and say.Activity 3:Listen and guess.就可根據(jù)認(rèn)知需要,在Listen and point.后進(jìn)行Listen and guess.再進(jìn)行Point and say.活動(dòng)練習(xí)??傊S著新一輪課程改革的進(jìn)行,教師靈活和創(chuàng)造性地使用教材顯得越來越重要。教師應(yīng)對教材中不適合的內(nèi)容安排順序,對教學(xué)方法進(jìn)行適當(dāng)調(diào)整,突破固有的思維定勢,從更高層次上認(rèn)識(shí)教材和合理使用教材,這樣學(xué)生學(xué)習(xí)的效率自然也會(huì)事半功倍,也將會(huì)使學(xué)生終生受益。
第三篇:新員工英語教材
新員工英語內(nèi)容提要
新員工英語共八課時(shí),一個(gè)課時(shí)考試,七課時(shí)內(nèi)容安排如下:
1.部門名稱 自我介紹2.數(shù)字、季節(jié)、星期、月份
3.國家名稱 禮貌用語4.時(shí)間、節(jié)日
5.電話用語6.飯店專用詞語
7.飯店常用句型8.考試
飯店基礎(chǔ)英語(新員工)
各部門名稱
1.總經(jīng)辦 General Manager Office2.保安部Security Dept.3.財(cái)務(wù)部 Accounting Dept.4.人力資源部 Human Resources Dept
采購部 Purchasing Dept.7.餐飲部Food and Beverage Dept.9.工程部 Engineering Dept.10.銷售部 Sales Department
11.客房部 Housekeeping Dept.12.前廳部 Front Office
13.商務(wù)中心 Business Center14.消防中心 Fire Center
英文自我介紹
introduction indication:
Let me introduce myself to you.It is really a great honor to have this opportunity to introduce myself
to you.My name is ***I am??(the attendant here.)
I was born/I am ??years old.I graduated from??
?? department.??
I like playing basketball/volleyball/football.6.I am a staff in HSKP/Front officeI have 2 brothers /I am the only child in my family.My parents work in
I like surfing internet/playing computer games.I like singing/dancing.I like riding bike.I like swimming/running.I have one year hotel working experience.Now I continue working hard.季節(jié)(season)
春 spring 夏 summer 秋 autumn 冬 winter
星期(weeks)
Monday(Mon.)Tuesday(Tues.)Wednesday(Wed.)Thursday(Thur.orThurs.)
Friday(Fri.)Saturday(Sat.)Sunday(Sun.)
月份(Months)
January(Jan.)February(Feb.)March(Mar.)AprilMayJuneJulyAugust(Aug.)September(Sep.)October(Oct.)November(Nov.)December(Dec.)
數(shù)字的表達(dá):
“第一”至“第二十二”: First,Second,Third,Fourth,Fifth,Sixth,Seventh,Eighth,Twenty-first,Twenty-second…
“一”至“十”: onetwothreefourfivesixseveneightnineten
十一: eleven十二: twelve
“十三”至“十九”:thirteenfourteenfifteensixteenseventeeneighteennineteen“二十”至“九十”:twentythirtyfortyfiftysixtyseventyeightyninety
百:hundred千:thousand一萬:ten-thousand十萬:one hundred thousand
百萬:million一千萬:ten million一億:one hundred million
十億:one billion / one-thousand million
一百億:ten billion / ten-thousand million
一千億:one hundred billion / one hundred thousand million
時(shí)間的表達(dá)
Q: What’s the time ? / What time is it ?
A: It’s five o’clock.(5點(diǎn))/ It’s ten past five.(5點(diǎn)10分)/ It’s ten to five.(4點(diǎn)50分)
It’s half past five.(5點(diǎn)半)/ It’s a quarter past five.(5點(diǎn)一刻)/ It’s a quarter to five.(差一刻5點(diǎn))
部分國家名稱:
China中國United States America(USA)美利堅(jiān)合眾國(美國)Brazil巴西Canada加拿大France法國Germany德國Holland荷蘭India印度Iran伊朗Persia波斯(伊朗的舊稱)Iraq 伊拉克Italy意大利Japan 日本
Korea朝鮮Malaysia馬來西亞Mongolia 蒙古New Zealand新西蘭Russia俄羅斯 Saudi Arabia沙特阿拉伯Singapore新加坡 Spain 西班牙 Sudan蘇丹 Sweden瑞典Switzerland 瑞士Thailand泰國Turkey土耳其
England(英國)
傳統(tǒng)節(jié)日的表達(dá):
1)元旦New Year’s Day10)兒童節(jié)Children’s Day
2)春節(jié)Spring Festival11)建軍節(jié)Army’s Day
3)元宵節(jié)Lantern Festival12)教師節(jié)Teacher’s Day
4)婦女節(jié)Women’s Day13)中秋節(jié)Mid-Autumn Day / Moon Festival
5)植樹節(jié)Arbor Day14)國慶節(jié)National Day
6)愚人節(jié)April Fool’s Day15)感恩節(jié)Thanksgiving Day
7)清明節(jié)Ching Ming Festival16)平安夜Christmas Eve
8)青年節(jié)Youth Day17)圣誕節(jié)Christmas Day
9)勞動(dòng)節(jié)May Day / Labour Day18)開齋節(jié)Fast-breaking Festival
禮貌用語(courtesy sentences)
Good morning(0:00----12:00)Good afternoon(12:00----18:00)
Good evening(18:00----0:00)Good night(夜間告別)晚安
Welcome to Hualing Grand Hotel!歡迎光臨華凌大飯店!
打招呼,問候語: Pakistan 巴基斯坦Philippines菲律賓Poland波蘭Portugal葡萄牙
Nice to meet you!(見面時(shí))
It was nice meeting you!/ Nice to have meet you!(見面后)很高興見到你!
Hello.您好---Hello您好(注解:招呼用語語氣較隨便)
Have a good time!玩的愉快!How do you do ?你好!
How’s everything going? 過的好嗎?
I’m quite good!我很好!
May I have your name, please?您叫什么名字?
Thank you for coming!感謝您的光臨!Have a nice trip!一路平安!Take care!多保重!Happy New Year!新年好!Merry Christmas!圣誕快樂!
提供幫助
May I help you ? 要我?guī)兔??What can I do for you ?有什么能為您做嗎?
Let me give you a hand.讓我來幫你一下吧
I’ll be glad to be at your service anytime!我愿意隨時(shí)為您效勞!This way ,please 這邊請!Nice talking with you!很高興與你聊!
I hope your stay will be a pleasant one.希望您在這里住的愉快。
當(dāng)客人向你表示感謝時(shí),通常用以下回答
It’s my pleasure!我的榮幸?。鞘羌肥拢¦ithpleasure!(很樂意)
Never mind!沒關(guān)系!
常用詞與常用表達(dá):
check in 入住check out 退房make a reservation 做個(gè)預(yù)定 registration card 登記單passport 護(hù)照show room展示房間identity card身份證book an air-ticket 訂張機(jī)票IDD 國內(nèi)長途DDD 國際長途DND 請勿打擾room attendant客房服務(wù)員
guest room客房vacant room 空房dirty room 臟房please make up room 請打掃房間turn down service 開床服務(wù)hot water開水ice cube 冰塊blanket 毛毯pillow枕頭sheet 床單 bath robe浴袍tooth paste 牙膏tooth brush 牙刷comb梳子toilet馬桶tissue paper面巾紙toilet paper 卷筒紙cup 杯子face towel 洗臉巾bath towel 浴巾 take a bath / shower洗澡soft drinks 軟飲料 Deep-fried油炸的beef 牛肉mutton 羊肉yoghurt酸奶luncheon buffet 自助午餐 right on 端上來cheers 干杯service charge服務(wù)費(fèi)in advance預(yù)先on / offduty上 / 下班
go to Bar去酒吧have a rest休息一下a good idea好主意on Sunday morning在星期天早上go straight直走turn to left / right向左 / 右拐two tickets for Shanghai去上海的兩張票make a phone call 打個(gè)電話telephone number電話號(hào)碼have breakfast / lunch / supper(dinner)吃早 / 中 / 晚餐by the way順便問一下
amuse ourselves娛樂一下in any case / anyway 無論如何deposit押金cheque 支票discount打折low / shoulder / high season淡 /平/ 旺季minimum / maximum price最低 / 最高價(jià)pay the bill付錢pay in cash 現(xiàn)金付賬pay by credit card 信用卡付賬
電話用語
Who is it ?
This is Lily speaking / here!Lily在講話!
Could / May I speak to Lily, please!請找一下Lily(接電話)
Wait a moment , please.請稍等一會(huì)。
Just a minute , please.I’ll put it through to ……請稍等一會(huì)兒,我替您接……
Hold on please!/ Hold the line, please!請不要掛斷電話!
May I take / have your telephone number , please ?能告訴我您的電話號(hào)碼嗎?
Sorry, I can’t hear you.Could you speak a bit louder?對不起,我聽不清。您能大聲一點(diǎn)嗎?
Sorry, Mr.Bellow is not in right now.Would you call back ?對不起,貝羅先生不在,您待會(huì)打好嗎?
Would you like to leave a message?您要留個(gè)口信嗎?
This is the General Switchboard.Operator.這里是總機(jī),我是接線員。
Please dial 9 before you dial the number.撥外線號(hào)碼前請先撥9。
I `m afraid / sorry you’ve got the wrong number.對不起,您打錯(cuò)號(hào)碼了。
常用句型
Have you made a reservation with us?您預(yù)定過嗎?
Sorry, I’m afraid we are not allowed to accept tips.對不起, 我們不允許收小費(fèi)。Would you like to have a receipt?請問您需要開發(fā)票嗎?
Excuse me, Sir/Madam, Here is your receipt.這是您的發(fā)票。
Excuse me , Sir/Madam, How would you like to pay for your bill?
打擾一下,請問您怎么付款?
Excuse me, Sir/Madam, How would you like to settle your payment?
請問您怎么付賬?
How many people are there in your party? 請問你們共有幾位客人?
What kind of room would you like? 您喜歡什么樣的房間?
What time will you be arriving? 你們什么時(shí)候到?
What is the rate for a night? 住一晚的價(jià)格是多少錢?
The bellman will show you to your room …行李員將會(huì)帶您去您的房間…….May I clean your room now? 現(xiàn)在我可以打掃您的房間嗎?
What time will it be convenient to clean your room? 什么時(shí)間方便為您打掃房間? Would you want an extra bed? 您需要一個(gè)加床嗎?
What would you like to order? 請問您想點(diǎn)什么菜?
This is the dish you ordered..這個(gè)菜是您點(diǎn)的。
Could you tell the cooks to hurry? 你能告訴廚師們快一點(diǎn)嗎?
Sorry, I’m afraid not.Once it’s ordered and served, it can’t be exchanged.對不起,凡是點(diǎn)的菜上桌以后是不能換的。
May I have the bill? 我能看一下帳單嗎?
Excuse me , Sir/Madam , Here is your bill , May I have your signature here, please? 打擾一下, 請您簽下帳單好嗎?
Excuse me, Sir/Madam ,How about a delicious dessert then?
打擾一下, 您還需要甜點(diǎn)嗎?
How much is it ?多少錢?
Would you want some hot water/ice cube? 您需要一些開水/冰塊嗎?
It’s my mistake, sorry.對不起,我的錯(cuò)。
I am off today.我今天休息。
Please show your ticket.請出示你的票。
May I come in?我可以進(jìn)來嗎?
It’s my duty!這是我的職責(zé)。
You can rest assured!您盡管放心。
I will be back soon!我很快回來。
Everything is OK / ready now!一切準(zhǔn)備就緒。Watch your step, please.請走好。
Which floor, Sir?先生,您去哪一層?
Just a moment, please.The elevator will be here soon.請稍等一會(huì),電梯一會(huì)就下來。Please take this elevator for the restaurant.請乘這個(gè)電梯去餐廳。Please enjoy your stay /meal with us.請您居住/用餐愉快。I hope you will have a good time.我希望您度過一段美好的時(shí)光。Have a nice journey.祝您旅途愉快。
第四篇:英語教材發(fā)展史
中國外語教育發(fā)展史回顧
(九)英語輔導(dǎo)報(bào)社 張同冰 丁俊華
第五節(jié) 基礎(chǔ)教育階段的英語教學(xué)大綱與教材
一、建國以來我國中學(xué)英語教學(xué)大綱的嬗變
關(guān)鍵詞
(一)中學(xué)英語教學(xué)大綱(English Syllabi for Middle Schools in PRC)
根據(jù)國家制訂的教學(xué)計(jì)劃規(guī)定的中學(xué)英語課的目的、任務(wù)及課時(shí)安排而編寫的中學(xué)英語教學(xué)指導(dǎo)文件。大綱具體規(guī)定英語課知識(shí)、技能的范圍和深度,同時(shí)規(guī)定教學(xué)的進(jìn)度和教學(xué)法的基本要求。英語教學(xué)大綱一般包含“前言”(或“說明”)、“教學(xué)目的和要求”、“教學(xué)原則”(或“教學(xué)中應(yīng)注意的問題”)、“各年級(jí)教學(xué)要求和教學(xué)內(nèi)容”等部分。
國家教育行政部門制定教學(xué)大綱必須進(jìn)行廣泛的調(diào)查研究。根據(jù)社會(huì)的需要、英語語言的規(guī)律和實(shí)際的教學(xué)條件(設(shè)備、師資、學(xué)生接受能力、教學(xué)方法等),確定教學(xué)目的和要求。列入大綱的要求是學(xué)生應(yīng)達(dá)到的基本要求。有的大綱根據(jù)教學(xué)原則對語音、詞匯和語法教學(xué)及聽、說、讀、寫的教學(xué)方法作出具體的規(guī)定。中學(xué)英語教學(xué)大綱是編寫英語教材、評(píng)估教學(xué)、考試考查和研究中學(xué)英語教學(xué)的依據(jù)。
民國時(shí)代,政府制訂過中學(xué)英語課程綱要或課程標(biāo)準(zhǔn)。中華人民共和國建立以來,教育部曾頒發(fā)過《普通中學(xué)英語科課程標(biāo)準(zhǔn)草案》(1951)、《高級(jí)中學(xué)英語教學(xué)大綱(草案)》(1956)、《初級(jí)中學(xué)英語教學(xué)大綱(草案)》(1957)、《全日制中學(xué)英語教學(xué)大綱(草案)》(1963)、《全日制十年制中小學(xué)英語教學(xué)大綱(試行草案)》(1978)。國家教育委員會(huì)于 1986年制訂了《全日制中學(xué)英語教學(xué)大綱》,1988年又頒發(fā)了《九年制義務(wù)教育全日制初級(jí)中學(xué)英語教學(xué)大綱(初審稿)》,1990年制訂了《全日制中學(xué)英語教學(xué)大綱(修訂本)》; 1992年頒發(fā)了《九年義務(wù)教育全日制初級(jí)中學(xué)英語教學(xué)大綱(試用)》,并制訂了《全日制高級(jí)中學(xué)英語教學(xué)大綱(初審稿)。
關(guān)鍵詞
(二)結(jié)構(gòu)法大綱和功能法大綱(Structural vs. Functional Approaches to Syllabus Design)
當(dāng)代語言教學(xué)大綱的兩個(gè)基本類型。大綱不止這兩個(gè)類型,各有其依據(jù);但這兩個(gè)類型是最常見的。結(jié)構(gòu)法大綱以結(jié)構(gòu)主義語言學(xué)和行為主義心理學(xué)為理論基礎(chǔ),強(qiáng)調(diào)語言句型是語言教學(xué)的基礎(chǔ),語言教學(xué)過程是一種新的語言習(xí)慣形成的過程,提倡學(xué)生通過反復(fù)模仿、記憶語法結(jié)構(gòu),達(dá)到不假思索脫口而出的境界,形成自動(dòng)化的習(xí)慣。功能法(又稱交際法)大綱是以社會(huì)語言學(xué)和心理語言學(xué)為理論基礎(chǔ),強(qiáng)調(diào)學(xué)生的需要和興趣,鼓勵(lì)學(xué)生接觸和反復(fù)運(yùn)用真實(shí)的語言,逐步正確地使用語言。兩種大綱的共同點(diǎn)在于,都認(rèn)為口語是第一性的,文字是第二性的,在外語教學(xué)中應(yīng)當(dāng)以聽說訓(xùn)練為主,聽先于說;讀寫為輔,讀先于寫;認(rèn)為語言教學(xué)是培養(yǎng)能力,不是教知識(shí);都主張借助直觀手段、語言環(huán)境(即情景和上下文等)來進(jìn)行教學(xué)。兩種大綱的主要差異在于:(1)結(jié)構(gòu)法大綱僅包含語法結(jié)構(gòu)表和詞匯表,而功能法大綱不僅考慮到學(xué)生在運(yùn)用語言時(shí)要做到語法基本正確,而且要求他們做到在交際情境中表達(dá)合適,因此大綱包含功能意念項(xiàng)目、重音和語調(diào)、語法和詞匯,以及使用語言的場合、社交、性別、心理的作用,語體和語域,伴隨語言特征(例如手勢、面部表情等)。(2)以結(jié)構(gòu)法大綱為依據(jù)編寫的教材,一般采用直線式或循環(huán)式由易到難地安排語言結(jié)構(gòu),有時(shí)也盡量使結(jié)構(gòu)情景化。而功能法大綱則主要采取功能意念或“題材范圍”(thematic area)的編排系統(tǒng)。(3)結(jié)構(gòu)法大綱所倡導(dǎo)的教學(xué)方法是聽說法或視聽法,而功能法大綱則提倡采用多種多樣的方法,以適應(yīng)語言活動(dòng)和學(xué)習(xí)者的多種需要。
關(guān)鍵詞
(三)中學(xué)英語教學(xué)大綱修訂史(History of
Design and Revision of Middle SchoolEnglish Syllabiin PRC)中國50年代以來中學(xué)英語教學(xué)大綱的制定和修改的概況。中華人民共和國成立以來,中學(xué)英語教學(xué)大綱的制訂和修改經(jīng)歷了一個(gè)曲折的探索過程。1951年3月中央人民政府教育部印發(fā)了《普通中學(xué)英語科課程標(biāo)準(zhǔn)草案》,其中包括《初級(jí)中學(xué)英語課程標(biāo)準(zhǔn)》和《高級(jí)中學(xué)英語課程標(biāo)準(zhǔn)草案》兩大部分。各部分又分別列出“目標(biāo)”、“時(shí)間分配”、“教材大綱”、“教法要求”4節(jié)。這是中華人民共和國建國后中央教育部門頒發(fā)的第一個(gè)中學(xué)英語教學(xué)大綱。沒有根據(jù)這個(gè)大綱統(tǒng)編的中學(xué)英語教材。
1954—1957年初中停開外語課。1956年教育部編訂了《高級(jí)中學(xué)英語教學(xué)大綱(草案)》,這是第一個(gè)高中始學(xué)英語的教學(xué)大綱。本大綱共有“說明”(包括目的要求)、“學(xué)生在三年應(yīng)達(dá)到的水平”、“各年級(jí)的教學(xué)重點(diǎn)和任務(wù)”、“教學(xué)大綱”4部分。根據(jù)這個(gè)大綱統(tǒng)編了高中英語教材3冊。1957年教育部編訂了《初級(jí)中學(xué)英語教學(xué)大綱(草案)》。根據(jù)這個(gè)大綱統(tǒng)編了初中英語教材2冊(分別由應(yīng)曼蓉編寫和范瑛等編寫)。
1963年教育部制訂了《全日制中學(xué)英語教學(xué)大綱(草案)》。這個(gè)大綱是在總結(jié)歷史經(jīng)驗(yàn)的基礎(chǔ)上制訂的。它包括5個(gè)部分:
一、教學(xué)目的和要求;
二、教學(xué)內(nèi)容;
三、教學(xué)內(nèi)容的安排;
四、教學(xué)中應(yīng)該注意的幾點(diǎn);
五、各年級(jí)的教學(xué)要求和教學(xué)內(nèi)容。這是建國以來規(guī)定中學(xué)英語教學(xué)要求最高、教學(xué)內(nèi)容最多的一個(gè)大綱。根據(jù)這個(gè)大綱統(tǒng)編了初、高中英語教材,從1963年用到1966年。
1967年教育部擬定了《中小學(xué)英語教學(xué)大綱》(征求意見稿),規(guī)定英語課從小學(xué)三年級(jí)起開設(shè);有的學(xué)校也可以從初中一年級(jí)起開設(shè)。1978年在此基礎(chǔ)上制訂了《全日制十年制中小學(xué)英語教學(xué)大綱(試行草案)》。該大綱的結(jié)構(gòu)與 1963年大綱不同;它包括4個(gè)部分:
一、教學(xué)目的和要求;
二、教學(xué)原則;
三、教學(xué)方法;
四、各年級(jí)教學(xué)要求和教學(xué)內(nèi)容。在“教學(xué)原則”和“教學(xué)方法”中提出“聽、說、讀、寫基本技能訓(xùn)練”的概念,指出“必須通過聽、說、讀、寫的全面訓(xùn)練來學(xué)習(xí)語言”;在初學(xué)階段“以聽說帶動(dòng)讀寫”,“在小學(xué)和初中階段,特別是入門階段,應(yīng)盡量使用直觀方式進(jìn)行教學(xué)”。大綱分別列出了中小學(xué)(8年)和中學(xué)(5年)的具體教學(xué)要求和教學(xué)內(nèi)容。該大綱統(tǒng)一了全國已分散10年的中學(xué)英語教學(xué),并規(guī)定了小學(xué)英語教學(xué)的要求和內(nèi)容。1980年對該大綱作了修訂,印行第二版,教學(xué)要求和教學(xué)內(nèi)容基本未變。根據(jù)大綱編寫了全國通用教材(試用本)小學(xué)6冊、初中6冊、高中2冊。
1982年根據(jù)1981年《全日制六年制重點(diǎn)中學(xué)教學(xué)計(jì)劃(試行草案)》草擬了《全日制六年制重點(diǎn)中學(xué)英語教學(xué)大綱(征求意見稿)》。該大綱的結(jié)構(gòu)與1978年大綱相同。在原則和方法部分提出,“著重培養(yǎng)運(yùn)用語言的能力”;“綜合訓(xùn)練,階段側(cè)重”;“在初級(jí)階段,以聽說訓(xùn)練為主”;“入門階段,使用直觀方式進(jìn)行教學(xué)”。根據(jù)大綱編寫了初中教材6冊(實(shí)為據(jù)1978年試用本修訂而成),高中教材3冊。
1986年國家教委制訂了《全日制中學(xué)英語教學(xué)大綱》。這個(gè)大綱是在1980年大綱(第二版)基礎(chǔ)上修訂的。修訂的原則是“適當(dāng)降低教學(xué)難度,減輕學(xué)生負(fù)擔(dān),教學(xué)要求盡量明確具體?!边@個(gè)大綱與1978/1980年大綱結(jié)構(gòu)相同;但課程計(jì)劃不一樣;一個(gè)起點(diǎn)為初一,另一個(gè)起點(diǎn)為高一。初一起始的課時(shí)總數(shù)從656增到932(因?qū)W制已改為6年)。高一起始者課時(shí)總數(shù)為552。大綱附錄中備有詞匯表;這在中國是首次。本大綱的特點(diǎn)是著重能力的培養(yǎng),既談“聽、說、讀、寫的綜合訓(xùn)練”,又提“聽、說、讀、寫(的交際)能力”。教學(xué)原則先談“聽說讀寫的教學(xué),后談?wù)Z言知識(shí)的方法”。這個(gè)大綱制定后,中學(xué)英語教材未作修訂,由各地視本地情況調(diào)整教學(xué)進(jìn)度。
1990年國家教委參照新定的高中課程調(diào)整計(jì)劃在 1986年大綱的基礎(chǔ)上制訂了《全日制中學(xué)英語教學(xué)大綱(修訂本)》。按照調(diào)整計(jì)劃,高中課程分必修課和選修課。英語必修課(高一和高二)課時(shí)有所減少;大綱修訂本在教學(xué)內(nèi)容和教學(xué)要求方面有所降低。必修課要求學(xué)會(huì)的詞匯量從 2000減至1800,高三選修課增學(xué)200個(gè)單詞。高中一年級(jí)起始英語課不分必修和選修,要求學(xué)會(huì)的詞匯量從2000減至1800。附錄中詞匯表分為詞匯表1(1800個(gè)單詞)和詞匯表2(200個(gè)單詞)。根據(jù)這個(gè)大綱(修訂本),高二課本(必修)比原高二課本減去4課書,高三課本(選修)把課文調(diào)整得淺易一些,仍保持12課。
1988年國家教委頒發(fā)了《九年制義務(wù)教育全日制初級(jí)中學(xué)英語教學(xué)大綱(初審稿)》。這個(gè)大綱供三年和四年兩種學(xué)制的初級(jí)中學(xué)使用。大綱的特點(diǎn)是:(1)重新采用1963年大綱那種結(jié)構(gòu),不設(shè)“教學(xué)原則”和“教學(xué)方法”,但將教學(xué)目的和教學(xué)要求分別立項(xiàng)。(2)對教學(xué)要求和教學(xué)內(nèi)容只作總的陳述,不分年級(jí)安排。這樣便于統(tǒng)觀全局。教學(xué)要求較以前更加具體。教學(xué)內(nèi)容作為附表(功能意念項(xiàng)目簡表、語音項(xiàng)目表、詞匯表、語法項(xiàng)目表)。
在已有大綱后制訂義務(wù)教育大綱,這是形勢的需要。
1992年國家教委據(jù)初審稿制訂了《九年義務(wù)教育全日制初級(jí)中學(xué)英語教學(xué)大綱(試用)》。這個(gè)大綱的新內(nèi)容是:(1)初中英語分兩級(jí)要求,從一年級(jí)起學(xué)習(xí)兩年的,為一級(jí)要求,根據(jù)需要和可能繼續(xù)學(xué)習(xí)一年或二年的,為二級(jí)要求。要求掌握的常用詞,三年制約600個(gè),四年制約700個(gè)。(2)大綱增加了“考試、考查”一項(xiàng)。
1992年國家教委制訂了與義務(wù)教育初中英語教學(xué)大綱銜接的《全日制高級(jí)中學(xué)英語教學(xué)大綱(初審稿)》。這個(gè)大綱規(guī)定,高一和高二英語為必修課,要求掌握1100個(gè)單詞,并學(xué)習(xí)500個(gè)單詞;高三英語為選修課,要求掌握的單詞總數(shù)為1200個(gè),并學(xué)習(xí)800個(gè)單詞,要求在口頭和書面方面具有初步運(yùn)用英語進(jìn)行交際的能力。
關(guān)鍵詞
(四)五十年代的中學(xué)英語教學(xué)大綱(English
Syllabi for Middle Schools in 1950s)
中華人民共和國成立后國家教育部門初次擬訂的中學(xué)英語教學(xué)大綱。1951年3月,中央人民政府教育部頒發(fā)了《普通中學(xué)英語科課程標(biāo)準(zhǔn)草案》,其中包括《初級(jí)中學(xué)英語課程標(biāo)準(zhǔn)草案》和《高級(jí)中學(xué)英語課程標(biāo)準(zhǔn)草案》兩大部分。各部分又分別列出“目標(biāo)”、“時(shí)間分配”、“教學(xué)大綱”、“教學(xué)要求”等4節(jié)。初中《標(biāo)準(zhǔn)》的“目標(biāo)”是:
一、養(yǎng)成閱讀和練習(xí)英語的興趣,打下繼續(xù)進(jìn)修的基礎(chǔ)。
二、能認(rèn)識(shí)一千至一千五百個(gè)一般的常用字(在正式字表未定之前,可參考桑氏字冊冊首之單字)。
三、能練習(xí)運(yùn)用常用的典型短語(包括片語、簡單的會(huì)話)約二百句。
四、能閱讀生字不超過十分之一二的淺近英語。
五、能作清晰熟練的書寫(即常用之書寫體,印刷體僅能辨認(rèn)即可)。高中《標(biāo)準(zhǔn)》的“目標(biāo)”是:
一、養(yǎng)成閱讀和練習(xí)英語的志趣,打下進(jìn)修??朴玫挠⒄Z基礎(chǔ),二、除了復(fù)習(xí)、繼續(xù)運(yùn)用初中所學(xué)的一千至一千五百個(gè)單字以外,能再加修大約三千至四千一般通用的單字(連初中共約五千字)。
三、能練習(xí)運(yùn)用普通英語,包括簡單的會(huì)話和寫作。
四、能認(rèn)識(shí)一種標(biāo)音制(如國際音標(biāo)或韋氏音標(biāo))。
五、能利用字典,閱讀一般性的英文書報(bào)雜志。
1956年教育部頒發(fā)了《高級(jí)中學(xué)英語教學(xué)大綱(草案)》。這是高中始學(xué)英語的第一教學(xué)大綱。該大綱包括“說
明”(包括目的要求)、“學(xué)生在三年中應(yīng)達(dá)到的水平”、“各年級(jí)的教學(xué)重點(diǎn)和任務(wù)”、“教學(xué)大綱”等4個(gè)部分。大綱規(guī)定教學(xué)的目的,“是教會(huì)學(xué)生能借助詞典的幫助,閱讀并了解簡易英語讀物或通俗文章;教給學(xué)生掌握將來進(jìn)一步學(xué)習(xí)英語、利用英語所不可缺少的一些知識(shí)、技能和熟練技巧?!睘榱诉_(dá)到這個(gè)目的,“在高中三年內(nèi)必須使學(xué)生學(xué)會(huì)發(fā)音、拼寫、朗讀等方面的基本技巧,學(xué)會(huì)1500個(gè)單詞,獲得必要的語法知識(shí)并能應(yīng)用這些知識(shí),進(jìn)行造句、問答、翻譯等練習(xí)?!?/p>
1957年教育部頒發(fā)了《初級(jí)中學(xué)英語教學(xué)大綱(草案)》。大綱規(guī)定初中階段的教學(xué)目的,“是教會(huì)學(xué)生將來進(jìn)一步學(xué)習(xí)英語、利用英語所不可缺少的一些知識(shí)、技能和熟練技巧?!币蟆皩W(xué)會(huì)1000個(gè)左右的英文單詞”。
關(guān)鍵詞
(五)六十年代的中學(xué)英語教學(xué)大綱(English
Syllabus for Middle Schools in 1960s)
中華人民共和國建立以來的第一個(gè)較完備的中學(xué)英語教學(xué)大綱。1963年5月教育部制訂了《全日制中學(xué)英語教學(xué)大綱(草案)》。大綱共分5個(gè)部分:
一、教學(xué)目的和要求;
二、教學(xué)內(nèi)容;
三、教學(xué)內(nèi)容的安排;
四、教學(xué)中應(yīng)該注意的幾點(diǎn);
五、各年級(jí)的教學(xué)要求和教學(xué)內(nèi)容。大綱規(guī)定中學(xué)英語教學(xué)的目的,“是使學(xué)生初步掌握英語這個(gè)工具,具有初步閱讀英語書籍的能力?!倍虒W(xué)的要求,“是教學(xué)生掌握 3500—4000個(gè)單詞和一定數(shù)量的慣用詞組以及必要的語音、語法的知識(shí)和技能,指導(dǎo)學(xué)生熟讀一定數(shù)量的文章,進(jìn)行閱讀、會(huì)話、作文的各種訓(xùn)練。初中階段,要求掌握1500— 2000個(gè)單詞和一定數(shù)量的慣用詞組,基本的語音知識(shí)和技能,關(guān)于詞法和句法的基本知識(shí)和技能,初步具有閱讀淺易文章的能力。高中階段,要求繼續(xù)掌握2000個(gè)左右的單詞和一定數(shù)量的慣用詞組,進(jìn)一步的語法知識(shí),具有借助詞典初步閱讀英語書籍的能力,就日常生活方面的題材進(jìn)行簡單會(huì)話和作文的能力,以及初步的翻譯能力。”
關(guān)鍵詞
(六)七十年代的中小學(xué)英語大綱(Ten-year
System School English Syllabus in 1970s)
十年制學(xué)校的英語教學(xué)大綱。1978年,中華人民共和國教育部制訂了《全日制十年制中小學(xué)英語教學(xué)大綱(試行草案)》,規(guī)定英語課從小學(xué)三年級(jí)起開設(shè),有的學(xué)校也可以從初中一年級(jí)起開設(shè)。大綱包括“教學(xué)目的和要求”、“教學(xué)原則”、“教學(xué)方法”、“各年級(jí)教學(xué)要求和教學(xué)內(nèi)容”4個(gè)部分。中小學(xué)英語教學(xué)的目的是,“著重培養(yǎng)學(xué)生的閱讀和自學(xué)英語的能力,并培養(yǎng)一定的聽、說、讀、寫和譯的能力,為畢業(yè)后在三大革命運(yùn)動(dòng)中進(jìn)一步學(xué)習(xí)和運(yùn)用英語或進(jìn)入高等學(xué)校學(xué)習(xí)打好基礎(chǔ)”。為了達(dá)到這個(gè)目的,從小學(xué)三年級(jí)開始,通過8年的學(xué)習(xí),“要求學(xué)生掌握基本語音和語法,掌握 2800個(gè)左右的單詞和一定數(shù)量的慣用詞組,能借助詞典閱讀一般題材的中等難度的讀物,具有一定的聽、說、寫和譯的能力?!睆某踔幸荒昙?jí)起開設(shè)英語課的,通過5個(gè)學(xué)年的學(xué)習(xí),“要求學(xué)生掌握基本語音和語法,掌握2200個(gè)左右單詞和一定數(shù)量的慣用詞組,能借助詞典閱讀一般題材的淺易讀物,具有初步的聽、說、寫和譯的能力。”
1980年對這個(gè)大綱作了修訂,印行了第二版。教學(xué)目的修訂為“對學(xué)生進(jìn)行聽、說、讀、寫、譯各方面的基本訓(xùn)練,一般側(cè)重培養(yǎng)閱讀和自學(xué)能力,為進(jìn)一步學(xué)習(xí)和運(yùn)用英語打好基礎(chǔ)?!苯虒W(xué)要求和教學(xué)內(nèi)容基本未作變動(dòng)。
關(guān)鍵詞
(七)八十年代的中學(xué)英語教學(xué)大綱(English
Syllabi for Middle Schools in 1980s)
全日制六年制中學(xué)英語教學(xué)大綱。1982年根據(jù)1981年《全日制六年制重點(diǎn)中學(xué)教學(xué)計(jì)劃(試行草案)》,草擬了《全日制六年制重點(diǎn)中學(xué)英語教學(xué)大綱(征求意見稿)》。包括“教學(xué)目的和要求”、“教學(xué)原則”、“教學(xué)方法”、“各年級(jí)教學(xué)要求和內(nèi)容”4個(gè)部分。
1986年國家教委制訂了《全日制中學(xué)英語教學(xué)大綱》。這是中華人民共和國成立以來第一個(gè)正式的中學(xué)英語教學(xué)大綱定本。內(nèi)容包括:
一、教學(xué)目的和要求;
二、教學(xué)原則;
三、教學(xué)方法(新增了測試方法);
四、各年級(jí)教學(xué)要求和教學(xué)內(nèi)容。還有附錄:(1)高中一年級(jí)起始英語課的教學(xué)目的、要求和安排。(2)詞匯表。大綱規(guī)定中學(xué)英語教學(xué)目的是“對學(xué)生進(jìn)行聽、說、讀、寫的基本訓(xùn)練,培養(yǎng)學(xué)生在口頭上和書面上初步運(yùn)用英語的能力,側(cè)重培養(yǎng)閱讀能力,為進(jìn)一步學(xué)習(xí)和運(yùn)用英語切實(shí)打好基礎(chǔ)?!?/p>
本大綱說明,“在現(xiàn)階段,中學(xué)英語課有兩個(gè)起點(diǎn)。一個(gè)是從初中一年級(jí)開設(shè),另一個(gè)是從高中一年級(jí)開設(shè)?!?/p>
從初中一年級(jí)開設(shè)的英語課的要求是:“在學(xué)習(xí)期滿時(shí),要求學(xué)生掌握基本語音和語法,學(xué)會(huì)1800—2000個(gè)單詞和一定數(shù)量的短語和習(xí)慣用語,具有一定的聽、說、寫的能力,能借助詞典獨(dú)立閱讀難度略低于課文的一般題材的讀物?!?/p>
高中一年級(jí)起始英語課的教學(xué)目的是,“通過三個(gè)學(xué)年的教學(xué),對學(xué)生進(jìn)行聽、說、讀、寫各方面的基本訓(xùn)練,側(cè)重培養(yǎng)閱讀能力,注意培養(yǎng)自學(xué)能力,為進(jìn)一步學(xué)習(xí)和運(yùn)用英語打下一定的基礎(chǔ)?!苯虒W(xué)要求是:“在學(xué)習(xí)期滿時(shí),要求學(xué)生掌握基本語音和語法,學(xué)會(huì)1800—2000個(gè)單詞和一定數(shù)量的短語和習(xí)慣用語,能借助詞典獨(dú)立閱讀難度略低于課文的一般題材的讀物?!?/p>
關(guān)鍵詞
(八)一九九○年的中學(xué)英語教學(xué)大綱(Middle
School English Syllabus Revised in 1990)
根據(jù)國家教委1990年《現(xiàn)行普通高中教學(xué)計(jì)劃的調(diào)整意見》修改的中學(xué)英語教學(xué)大綱。稱為《全日制中學(xué)英語教學(xué)大綱(修訂本)》。這個(gè)大綱將普通高中的課程分為必修課和選修課兩部分,部分學(xué)科的必修課時(shí)也略有增減。高一和高二英語為必修課,課時(shí)從320減至306;高三英語為選修課,課時(shí)為120。為此,對全日制中學(xué)英語教學(xué)大綱進(jìn)行了修訂,印行了第二版。修訂本的高中部分比1986年大綱在教學(xué)內(nèi)容和要求方面有所降低。因此,對于從初中一年級(jí)起始開設(shè)的英語課,到高中必修課(高一和高二)學(xué)習(xí)結(jié)業(yè)時(shí),“要求學(xué)生掌握基本語音和語法,學(xué)會(huì)1800個(gè)單詞和一定數(shù)量的短語和習(xí)慣用語,具有一定的聽、說、寫的能力,能借助詞典獨(dú)立閱讀難度略低于課文的一般題材的讀物。在高中三年級(jí)(選修)結(jié)束時(shí),除上述要求外,應(yīng)學(xué)會(huì)2000個(gè)單詞和一定數(shù)量的短語和習(xí)慣用語?!?/p>
高中一年級(jí)起始的英語課,不分必修和選修,“在學(xué)習(xí)期滿時(shí),要求學(xué)生掌握基本語音和語法,學(xué)會(huì)1800個(gè)單詞和一定數(shù)量的短語和習(xí)慣用語,能借助詞典獨(dú)立閱讀難度略低于課文的一般題材的讀物?!?/p>
1986/1990年的大綱,在教學(xué)原則和教學(xué)方法部分多次提出培養(yǎng)學(xué)生運(yùn)用英語進(jìn)行交際的能力。這與教學(xué)目的部分的提法不盡一致,是需要解釋的。培養(yǎng)交際能力是個(gè)理想目標(biāo),要努力研究目前如何達(dá)到這一目標(biāo)。
關(guān)鍵詞
(九)九年制義務(wù)教育英語教學(xué)大綱(School
English Syllabi for Nine-year Compulsory Education)
根據(jù)九年制義務(wù)教育法制訂的初中英語教學(xué)大綱。國家教委1988年頒發(fā)了《九年制義務(wù)教育全日制初級(jí)中學(xué)英語教學(xué)大綱(試用)》向全國頒布。這是國家施行九年義務(wù)教育的一個(gè)切實(shí)步驟。該大綱規(guī)定,外國語是中國義務(wù)教育全日制初級(jí)中學(xué)的一門基礎(chǔ)學(xué)科,英語是中學(xué)開設(shè)外語課的主要語種。初中英語教學(xué)的目的是:“通過聽、說、讀、寫的訓(xùn)練,使學(xué)生獲得基礎(chǔ)知識(shí)和為交際初步運(yùn)用英語的能力,激發(fā)學(xué)生的學(xué)習(xí)興趣,養(yǎng)成良好的學(xué)習(xí)習(xí)慣,為進(jìn)一步學(xué)習(xí)打好初步的基礎(chǔ);使學(xué)生受到思想品德、愛國主義和社會(huì)主義等方面的教育;發(fā)展學(xué)生的思維能力和自學(xué)能力?!?/p>
根據(jù)《義務(wù)教育全日制小學(xué)、初級(jí)中學(xué)課程計(jì)劃》,大綱規(guī)定初中英語按不同情況分兩級(jí)要求,從一年級(jí)起學(xué)習(xí)兩年的,為一級(jí)要求;根據(jù)需要和可能繼續(xù)學(xué)習(xí)一或二年的為二級(jí)要求。為了達(dá)到教學(xué)的目的和要求,大綱以附表的形式詳細(xì)列出了初中階段的教學(xué)內(nèi)容,即日常交際用語、語音、詞匯和語法知識(shí)。三年制要求掌握600個(gè)左右常用詞和200條左右習(xí)慣用語及搭配。大綱的第四部分提出了教學(xué)中應(yīng)該注意的8個(gè)問題:
(一)遵循英語教學(xué)規(guī)律,寓思想教育于語言教學(xué)之中;
(二)著重培養(yǎng)為交際運(yùn)用英語的能力;
(三)聽、說、讀、寫全面訓(xùn)練,不同階段略有側(cè)重;
(四)盡量使用英語,適當(dāng)利用母語;
(五)發(fā)揮教師指導(dǎo)作用,充分調(diào)動(dòng)學(xué)生的主動(dòng)性和積極性;
(六)增加語言實(shí)踐的量,提高英語教學(xué)質(zhì)量;
(七)提高課堂教學(xué)質(zhì)量,積極開展課外活動(dòng);
(八)充分利用直觀教具和電化教學(xué)手段,努力創(chuàng)造英語環(huán)境。大綱規(guī)定考試和考查要注意考查學(xué)生為交際綜合運(yùn)用語言知識(shí)的能力;考試既要有筆試,也要有口試和聽力測試。本大綱是適應(yīng)新形勢的、技術(shù)較完善的一個(gè)方案。
根據(jù)國家教委的規(guī)劃,1988年起上海市教育局?jǐn)M訂了適用于上海市和文化比較發(fā)達(dá)的地區(qū)的《課程改革方案(草案)》,并據(jù)此于1991年編訂了《全日制九年義務(wù)教育課程標(biāo)準(zhǔn)(草案)》。其中,《九年制義務(wù)教育英語學(xué)科課程標(biāo)準(zhǔn)(草案)》共有8個(gè)部分:
一、目標(biāo);
二、(從三年級(jí)到九年級(jí)的)課時(shí)安排;
三、教學(xué)內(nèi)容和教學(xué)要求,規(guī)定三至五年級(jí)是英語學(xué)習(xí)的預(yù)備階段,六至九年級(jí)為提高階段;
四、教材編選原則;
五、訓(xùn)練形式和要求;
六、教學(xué)組織和教學(xué)方法;
七、教學(xué)評(píng)價(jià)和成績核定,規(guī)定英語考試和考查均應(yīng)包括口試、筆試兩方面;
八、配套措施,指配合教材的出版物、音像資料及設(shè)備等。最后附有語法項(xiàng)目表、語言功能表和詞匯表。
關(guān)鍵詞
(十)全日制高中英語大綱(Full-time Senior
Middle School English Syllabus,Initially Approved Edition)
與九年義務(wù)教育大綱相適應(yīng)的高中英語教學(xué)大綱,供九年義務(wù)教育初中英語教材實(shí)驗(yàn)地區(qū)使用。九年義務(wù)教育全日制三年制初級(jí)中學(xué)英語教學(xué)時(shí)數(shù)由500個(gè)課時(shí)減至400個(gè)課時(shí),教學(xué)內(nèi)容有所減少。為了解決初中與高中教學(xué)銜接的問題,國家教委于1991年起組織力量編訂了《全日制高級(jí)中學(xué)英語教學(xué)大綱(送審稿)》,并于1992年4月提交中小學(xué)教材審查委員會(huì)初審?fù)ㄟ^,作為新的高中英語教材編寫的依據(jù)。該大綱初審稿于1993年5月出版。
《全日制高級(jí)中學(xué)英語教學(xué)大綱(初審稿)》前言強(qiáng)調(diào)要“培養(yǎng)大批有理想、有道德、有文化、有紀(jì)律,并在不同程度上掌握一些外國語的各方面的人才,以提高中華民族的思想道德素質(zhì)和科學(xué)文化素質(zhì)。”大綱規(guī)定高中英語的教學(xué)目的是“在義務(wù)教育初中教學(xué)的基礎(chǔ)上,鞏固和發(fā)展學(xué)生的基礎(chǔ)知識(shí)和聽、說、讀、寫的基本技能,培養(yǎng)在口頭上和書面上初步運(yùn)用英語進(jìn)行交際的能力,側(cè)重提高閱讀能力,使學(xué)生獲得一定的自學(xué)能力,為繼續(xù)學(xué)習(xí)和運(yùn)用英語切實(shí)打好基礎(chǔ);使學(xué)生受到思想品德、愛國主義和社會(huì)主義等方面的教育,增進(jìn)對所學(xué)語言國家的了解;發(fā)展智力,提高觀察、記憶、思維、想象等能力?!?/p>
高中一、二年級(jí)學(xué)生必修英語,高三學(xué)生選修英語,高二學(xué)生應(yīng)在初中掌握600個(gè)詞的基礎(chǔ)上再掌握500個(gè)詞,即累計(jì)掌握1100個(gè)左右常用詞(并另外學(xué)習(xí)500個(gè)左右單詞);高三學(xué)生應(yīng)在初中掌握600個(gè)詞的基礎(chǔ)上再掌握600個(gè)詞,即累計(jì)掌握1200個(gè)左右單詞(并另外學(xué)習(xí)800個(gè)左右單詞);這1100個(gè)詞和1200個(gè)詞要求能在口筆頭練習(xí)中運(yùn)用。對聽、說、讀、寫、語音、詞匯和語法等方面的要求大綱有明確的規(guī)定。大綱的第四部分提出了教學(xué)中應(yīng)該注意的9個(gè)問題,其中包括進(jìn)行聽、說、讀、寫綜合訓(xùn)練,側(cè)重培養(yǎng)閱讀能力;處理好語言教學(xué)和文化的關(guān)系,附表(4個(gè))列出了初、高中應(yīng)教授的全部內(nèi)容:日常交際用語、語音、詞匯和語法。
第五篇:各類英語教材特點(diǎn)
福尼斯
一.音圖教學(xué):
音圖是代表單詞中讀音(即音素)的字母或字母組合。其形狀仍是字母,但不再讀字母名稱音,而是讀其在單詞中的讀音。一個(gè)字母構(gòu)成的音圖叫單音圖,兩個(gè)或兩個(gè)以上字母構(gòu)成的音圖叫多音圖由于所有單詞都是由音圖構(gòu)成的,所以,一旦學(xué)生掌握了音圖,就能拼出閱讀中所遇到的幾乎所有單詞,不管以前是否學(xué)過。英語單詞有100多萬,要想全部記住是不可能的。但是,構(gòu)成這些單詞的音圖只有75個(gè),只要掌握了這75個(gè)音圖以及相應(yīng)的規(guī)則,就能夠讀出幾乎所有的單詞。正如掌握了7個(gè)音符以及有關(guān)樂理知識(shí),就可以唱出無限的樂曲。二.單詞教學(xué):
傳統(tǒng)的單詞教學(xué)方法,是教師出示一個(gè)單詞表,學(xué)生反復(fù)拼讀,死記硬背。福尼斯英語的方法是教師聽寫單詞,學(xué)生根據(jù)讀音,在頭腦中把單詞分解為各個(gè)音素,在規(guī)則的指導(dǎo)下選擇適當(dāng)音圖拼出這個(gè)單詞。通過反復(fù)聽寫,學(xué)生牢固掌握了音圖;通過分析思考,熟練掌握了讀音規(guī)則,這樣,在閱讀中就可以直接讀出生詞。學(xué)生不再死記硬背,而是分析思考。在此過程中,學(xué)生的邏輯思維能力得到訓(xùn)練,智力得到開發(fā)。詞義通過圖畫、實(shí)物、情境、例句、閱讀、英文解釋等方法加以揭示,培養(yǎng)學(xué)生用英語思維的習(xí)慣。三.閱讀、寫作教學(xué):
學(xué)生具備了見詞能讀、聽音能寫的能力,就開始大量、廣泛的自由閱讀。情節(jié)生動(dòng)、內(nèi)容豐富、插圖風(fēng)趣的《福尼斯英語詞表讀物》與《福尼斯英語系列讀物》激發(fā)了學(xué)生的學(xué)習(xí)興趣,培養(yǎng)了他們快速、流利、準(zhǔn)確和有理解的閱讀習(xí)慣。在大量閱讀中,擴(kuò)大單詞量,熟悉語法,增強(qiáng)語感,而且透過語言文字,深入英語文化,了解了英語國家的風(fēng)土人情、歷史地理、文學(xué)藝術(shù),頭腦中儲(chǔ)存大量優(yōu)秀的書面語言,從而極大地豐富學(xué)生的口頭與書面表達(dá)能力。四.語法教學(xué):
在低年級(jí)教授習(xí)慣語法,即只教給學(xué)生各種語法現(xiàn)象的書寫形式及其讀音,不進(jìn)行深入講解。然后讓學(xué)生在大量閱讀中通過多次感知逐漸熟悉和理解語法現(xiàn)象,形成語法概念。從三年級(jí)開始教系統(tǒng)語法。五.聽說教學(xué):
福尼斯英語主張“聽讀領(lǐng)先”,而不是“聽說領(lǐng)先”。因?yàn)檎Z言能力的發(fā)展遵循“先輸入,后輸出”的規(guī)律。聽讀是輸入,說寫是輸出。在時(shí)間上,輸入要先于輸出;在數(shù)量上,輸入量要遠(yuǎn)遠(yuǎn)大于輸出量才能形成有效的語言交際能力。福尼斯英語在入門階段通過聽磁帶和大量閱讀,在學(xué)生頭腦中積累大量單詞、句型、文章、故事,逐漸建立起系統(tǒng)化的英語知識(shí)網(wǎng)絡(luò)體系,在此基礎(chǔ)上進(jìn)行一定的說寫訓(xùn)練,就逐漸從輸入轉(zhuǎn)為輸出――說和寫。
洪恩少兒英語教材五大特點(diǎn)
本學(xué)期幼兒園采用了洪恩少兒英語,現(xiàn)將洪恩英語的特點(diǎn)向大家介紹如下: 把聲音印在紙上,與筆配套使用,能開口說話
洪恩.朗讀者的教材均采用洪恩教育獨(dú)有的“把聲音印在紙上”的高科技技術(shù),與發(fā)聲筆配套使用,書本就開口說話了,使書本不再是干巴巴的,而是生動(dòng)有趣,讓人有不停學(xué)下去的想法。
原汁原味美式教材,由美國本土幼兒專家全程編寫
洪恩教育四百人的教材研發(fā)隊(duì)伍,五十多位經(jīng)驗(yàn)豐富的美國教育專家。洪恩.朗讀者教材均由美國幼兒專家編寫,內(nèi)容活潑生動(dòng),符合2-7歲孩子的學(xué)習(xí)特點(diǎn),孩子喜歡看喜歡學(xué)。讓中國孩子能學(xué)到原汁原味的美語,與美國同齡孩子學(xué)習(xí)同步。
標(biāo)準(zhǔn)美式發(fā)音,配音由美國專業(yè)播音員配音
洪恩.朗讀者的發(fā)音由美國專業(yè)播音員現(xiàn)場錄音,不僅發(fā)音標(biāo)準(zhǔn),讓孩子學(xué)到標(biāo)準(zhǔn)美語,而且還是根據(jù)教材內(nèi)容進(jìn)行現(xiàn)場情境對話,讓孩子在讀的時(shí)候如同身臨其境,就像與真人對話一樣。
動(dòng)漫風(fēng)格教材,符合孩子學(xué)習(xí)特點(diǎn)
2-7歲孩子主要是看圖學(xué)習(xí),洪恩.朗讀者教材根據(jù)這一特點(diǎn),引用央視熱播的動(dòng)畫大片或深受國外小孩子喜歡的圖畫、故事,讓孩子一眼就喜歡、愿意去學(xué)。洪恩.朗讀者的教材印刷精美,色彩搭配完美。配套動(dòng)畫光盤,讓課本更生動(dòng)
動(dòng)畫片里有精彩的故事、動(dòng)聽的音樂及好玩的游戲,洪恩.朗讀者將課本內(nèi)容制成動(dòng)畫大片,讓孩子更好消化課本內(nèi)容。
洪恩教育產(chǎn)品與服務(wù)
洪恩教育根據(jù)幼兒語言、肢體、感知等能力發(fā)展的各個(gè)關(guān)鍵期,研發(fā)出了一系列真正引發(fā)幼兒學(xué)習(xí)興趣,寓教于樂的教育產(chǎn)品。
如適合0-3歲的嬰幼兒產(chǎn)品有:《Mini Teddy洪恩小小幼兒英語 》、《洪恩子集擴(kuò)展幼兒識(shí)字——初階》、《酷卡52》、《我的第一本套裝》、《洪恩幼兒認(rèn)知套裝》、《洪恩經(jīng)典國學(xué)系列》等;
3-5歲幼兒產(chǎn)品:《Magic teddy洪恩國際幼兒英語》、《Hello Teddy洪恩幼兒英語》、《洪恩子集擴(kuò)展幼兒識(shí)字——中階》、《洪恩幼兒識(shí)字套裝》、《洪恩幼兒數(shù)學(xué)》、《洪恩雙語趣味掛圖》等;
5-8歲幼兒產(chǎn)品:《洪恩兒童英語圖解1000詞》、《洪恩子集擴(kuò)展幼兒識(shí)字——高階》、《洪恩小小口袋套裝》、《與恐龍共舞》、《安徒生童話有聲掛圖》、《世界經(jīng)典童話故事》等