第一篇:畢業(yè)設計摘要
摘要
電流傳感器是電力系統(tǒng)中進行電能計量和繼電保護設備,其精度及可靠性與電力系統(tǒng)的安全和經濟運行密切相關。隨著電力工業(yè)的發(fā)展,傳統(tǒng)的電流傳感器難以滿足需求,而光電流傳感器因其獨特的優(yōu)點具有潛在的應用價值,是未來電力工業(yè)電流測量發(fā)展的趨勢。
本文通過廣泛閱讀資料,回顧了光學電流傳感器近年來的進展,分析了該技術領域存在的問題,結合光纖光柵傳感技術,根據超磁致伸縮材料特性分不加偏磁和加偏磁兩種情況下對光纖光柵交流傳感器進行了探索。
關鍵詞光電流傳感器;光纖布拉格光柵;超磁致伸縮材料
Abstract
The current transducer is the important device of power metering and relaying.Its’ precision and reliability related the safety and economy of operation in electric power system closely.With the development of power, conventional current transducer can’t meet requirements.While optical current transformer(OCT)have potential application cost because of its’ unique advantages, will be used to replace conventional current transducers in the future.In this paper, the present situation and state of R&D, existing problems in the field of OCT is reviewed and analyzed through extensive reading of the scientific papers and reports.AC current sensing was realized by DC bias condition and without DC bias condition.Keywordsoptical current transformer;fiber Bragg grating;giant magnetostrictive material
第二篇:畢業(yè)設計摘要
摘要
變電所是電力系統(tǒng)的重要組成部分,是電力輸送的一個重要環(huán)節(jié),它的安全運行與否,直接影響著整個電力系統(tǒng)的安全運行,變電所在電力輸送中起著變換和分配電能的作用。
隨著我國經濟的飛速發(fā)展,對電力的要求也是越來越高,如何減少電力傳送的損耗,如何獲得更高的電能質量成為企業(yè)和工廠考慮的首要因素,為了滿足這一要求,現(xiàn)在越來越多的企業(yè)和工廠都采用10KV進線,所以35KV降壓變電所的設計在電力輸送配置中的作用越來月明顯。
本次的35KV降壓變電所10KV側電氣部分設計是根據目前我國的變電所電氣系統(tǒng)的設計規(guī)范進行的;主變壓器的選擇、主接線的選擇、短路電流計算、電氣設備的選擇,中性點的接線方式,繼電保護裝置的配置和變電所的防雷規(guī)劃是本次設計的主要內容。
關鍵詞:35KV降壓變電所;短路電流;主變壓器;防雷
ABSTRACT
Substation is an important part of the power system, power transmission is an important part, it's safe to run or not directly affect the safe operation of the entire power system, substations and distribution of electric energy conversion plays role in power delivery in.With the rapid development of China's economy, the electricity requirements are increasing, how to reduce the loss of power transmission, how to get a higher power quality and become the primary factor considered in the factory, in order to meet this requirement, and now increasingly more and more companies and factories have adopted 10KV line, so 35KV/10KVstep-down substation design configurations role in conveying the power increasingly evident month.The step-down substation 10KV side of the electrical part of the design is based on the current design specifications of the substation electrical system performed;selection Select the main transformer, main wiring options, short-circuit current calculation, electrical equipment, the wiring of points, configuration and substation lightning protection devices planning is the main content of this design.Keywords: Buck 35KV substation;short-circuit current;main transformer;mine
第三篇:3畢業(yè)設計摘要
南通職業(yè)大學畢業(yè)設計高速·金福花園2#樓工程造價
摘要
本工程為高速·金?;▓@2#樓。建筑工程等級三級,耐火等級二級,屋面防水等級二級,抗震設防裂度6度。
本工程室內環(huán)境污染控制類型為I類,所選用的建筑材料和裝修材料必須符合《民用建筑工程室內環(huán)境污染控制規(guī)范》(GB50325-2010)的規(guī)定。
本工程施工圖紙各層所注標高為完成面標高(建筑面標高),屋面標高為結構面標高;本工程施工圖紙原標高以及總平面圖以米計外,其余均以毫米計。
本工程手工計算工程量,利用晨曦清單計價系統(tǒng)套價軟件計價,材料按2012年《第三季度南平工程造價信息》中建甌地區(qū)信息價,材料價格不全的套《福州市2012年10月建設工程材料價格》,其中主要材料按招標人指定的品牌和價格計算,工程總造價20387843元。
在計算工程量的過程中一定要看清楚圖紙上交代的內容,以免漏算。在定額套價時,主要參考了《建設工程工程量清單計價規(guī)范》(GB50500-2008)及有效的定額補充、工程計價文件和規(guī)定。調信息價時,要準確的看好每個材料的信息價。在保證這些都完成的前提下,算出工程總造價。
關鍵詞:金?;▓@、建甌地區(qū)信息價、晨曦清單計價。
AbstractThis works for the high speed, Jin Fu Garden 2# building.Construction of grade three, refractory grade two, roofing waterproof grade two, seismic fortification intensity of 6 degrees.The engineering indoor environmental pollution control type for the I class, meet the “civil engineering indoor environmental pollution control norms must be selected building materials and decoration materials”(GB50325-2010)regulations.This project construction drawing layers marked elevation for the completion of surface elevation(building elevation), the elevation of the roof structure surface elevation;the construction drawings.The original elevation in meters and general layout, the rest are in millimeters.The engineering manual calculation, valuation system package software valuation using the list in 2012 third quarter, according to the materials of “Nanping project cost information” in the Jianou area information price, material price is not complete sets of “Fuzhou city in 2012 October construction material price”, the main material is calculated according to the designated brand and price the total project cost 20387843 yuan.In the process of computation must see drawings on account of the content, in order to avoid missed.In the fixed price, the main reference to “code of valuation with bill quantity of construction works”(GB50500-2008)file and the provisions of additional quota, valuation and effective engineering.Tone information price, accurate for each material information price.To ensure that these are completed in the premise, to calculate the total project cost.Key words: Jin Fu Hua Yuan, Jianou District, the price list pricing information.工程概況
1.1工程名稱
高速·金福花園2#樓。
1.2建設地點
福建省建甌市水西路。
1.3 建設規(guī)模及標段劃分
工程建設規(guī)模:占地面積:20889平方米,容積率≤4.5、建筑密度≤28%、綠地率≥33%,總建筑面積約108000平方米(其中地下室建筑面積約13800平方米),5幢高層(31層)商住樓;約1.9億元。
1.4 承包方式
包工包料(如有甲供及招標人另行發(fā)包的除外)。
1.5 質量標準
工程質量要求:①達到國家工程施工質量驗收規(guī)范合格標準要求;②本項目創(chuàng)建南平市標準化管理示范工地、南平市九峰杯住宅小區(qū)工程項目。
1.6 工期要求
工期要求:總工期:830個日歷天,其中:地下室部分90個日歷天,上部工程分二期施工,每期560個日歷天(二期預計間隔180個日歷天);其中各關鍵節(jié)點的工期要求為:由招標人安排。
1.7資金來源
建設資金來自自籌資金。
1.8招標范圍
施工圖所示土建工程(不含樁基工程),詳見圖紙全部內容。
1.9施工現(xiàn)場條件
1.9.1場地平整
場地未平整。
1.9.2交通條件
工程地處城市道路邊,交通便利。
1.9.3臨時用水
施工臨時用水已接至現(xiàn)場。
1.9.4臨時供電
施工臨時用電已接至現(xiàn)場,由施工單位自行安裝總電源箱至施工場地的各有關設備、線路、配電箱及電表等。
1.9.5現(xiàn)場排水
需設置臨時排水系統(tǒng),施工廢水、雨水、污水經沉淀后排至市政污水管網。
1.9.6臨時設施
根據工程具體情況和施工組織設計平面布置要求搭設。
1.9.7周邊環(huán)境
本工程周邊為居民生活區(qū),對現(xiàn)場安全文明施工要求較高,現(xiàn)場應加強安全管理、環(huán)境保護,噪音、揚塵控制,衛(wèi)生、場容場貌控制,以及交通安全、治安等多方面的管理和協(xié)調,確保附近居民生活、工作、交通等不受影響。報價依據
2.1圖紙依據
本工程量清單根據福建省交通規(guī)劃設計院設計的施工圖紙、設計變更、設計院關于施工圖紙問題的答復、建筑工程施工圖審查反饋單、《福建省建筑工程消耗量定額》(FJYD-101-2005)及招標文件等有關規(guī)定;
2.2費用計算依據
(1)《福建省建筑工程消耗量定額》(FJYD-101-2005);
(2)《建設工程工程量清單計價規(guī)范》(GB50500-2008);
(3)閩建筑[2005]26號《福建省建筑工程綜合單價表(2005年)》
(4)閩建筑[2005]15號福建省建設廳關于調整《福建省建筑土建工程費用定額》(2003版)利潤率的通知;
(5)閩建筑[2005]25號福建省建設廳關于調整《福建省建筑土建工程費用定額》(2003版)建筑工程企業(yè)管理費率的通知;
(6)閩建筑[2012]36號文關于價格調整基金計取有關問題的通知;
(7)閩建筑[2012]28號《2012年第三季度福建省施工機械臺班單價》;
(8)閩建筑[2012]4號福建省建設廳關于建設工程造價稅費調整的通知;
(9)閩建筑[2012]9號關于調整工程安全文明施工取費標準的通知。
2.3材料價格
材料價格執(zhí)行2012年《第三季度南平工程造價信息》中建甌地區(qū)信息價,材料價格不全的套《2012年10月福州市土建工程材料價格》,其中主要材料按招標人指定的品牌和價格計算。
2.4人工工資單價
人工工資單價執(zhí)行閩建筑[2007]15號《關于調整建設工程人工預算單價的通知》以及閩建筑[2011]37號文人工預算單價的補充通知。
2.5其它有關費率
(1)預留金不計費稅;
(2)臨時設施費: 0.9%;
(3)檢驗試驗費: 0.20%;
(4)價格調節(jié)基金:0.1%
(5)暫列金額:400000元
(6)本工程按三類工程取費,勞保按4.860%、稅金按3.477%。
第四篇:工程造價畢業(yè)設計摘要
摘要
本次畢業(yè)設計題目為蘆屯中心小學教學樓的招標文件、施工圖預算及工程量清單三個部分,建筑面積4463.6平方米,層數為4層,層高3.9米,結構類型為框架結構。本畢業(yè)設計由招標文件的編制、施工圖預算、工程量清單的編制三部分組成。
設計的任務是招標文件的編制、施工圖預算和工程量清單的編制,其核心部分與首要工作是工程量的計算,在設計過程中,以《建設工程計量與計價》、《工程量清單計價與規(guī)則》為依據,按照遼寧省建筑工程工程量清單計價辦法進行,經過指導老師上課的仔細講授與個別答疑,并通過使用查閱資料與網絡等手段,在指導老師的幫助下先完成了工程量的計算。
關鍵詞:招標文件、施工圖預算、工程量清單
Abstrac
The graduation design subject is Lutun center primary school building project cost and the construction organization design.there are 4 layers overground, the building is 16.5 meters tall and it’s construction area is 4463.6 square meters, the structure form is frame structure.the graduation design consists of three parts which are the preparation of tender documents,construction drawing budget and the formulation of the list of quantities.The design tasks are the preparation of tender documents,construction drawing budget and the formulation of the list of quantities,the core part and the primary work is he formulation of the list of quantities.In the design process,based on ‘Construction engineering measurement and measurement’and ‘The quantities bill valuation with the rules’,according to the Liaoning Province construction engineering list valuation measures,after the teacher carefully in class teaching and individual answer questions,and through the use of datd access and network means,in the guidance of teacher to help complete the calculation of the quantity.Key words: tender documents , construction drawing budget, the list of
quantities.
第五篇:數控畢業(yè)設計摘要
X6臺階定位盤數控加工工藝設計
摘 要
數控加工是機械行業(yè)一門新的專業(yè),數控技術是數字程序控制數控機械實現(xiàn)自動工作的技術。它廣泛用于機械制造和自動化領域,較好地解決多品種、小批量和復雜零件加工以及生產過程自動化問題。隨著計算機、自動控制技術的飛速發(fā)展,數控技術已廣泛地應用于數控機床、機器人以及各類機電一體化設備上。同時,社會經濟的飛速發(fā)展,對數控裝置和數控機械要求在理論和應用方面有迅速的發(fā)展和提高。
隨著社會需求個性化、多樣化的發(fā)展,生產規(guī)模沿著小批量——大批量——多品種變批量的方向發(fā)展,以及以計算機為代表的高技術和現(xiàn)代化管理技術的引入,滲透與融合,不斷地改變著傳統(tǒng)制造技術的面貌和內涵,從而形成了先進制造技術。
數控就是一種自動控制技術,它所控制的一般是位置、角度、速度等機械量。數控機床,就是采用了數控技術的機床,它是一個裝有程序控制的機床,該系統(tǒng)能夠邏輯地處理具有使用號碼或其他符號編碼指令規(guī)定的程序。
本篇論文是對X-6號銑塊(包含凸臺、外輪廓、孔)的工藝設計,其中包括加工方法的選擇,加工順序的安排,毛坯的選擇,銑刀的類型及選用,切削用量的選擇,數控加工中數值計算等。工件采用的是HT150,刀具是硬質合金鋼,在零件的加工過程中要注意切削用量的選擇正確,加工順序的安排等,有關工步工序的計算相對較復雜。
本設計從數控加工前應做的準備開始到數控加工工藝分析、數控刀具及其選擇、工件裝夾方式與數控加工夾具的選擇、程序編制等內容以及數控加工時應注意的問題做了一一的說明。
關鍵詞:數控機床; 工藝設計; 程序編制