第一篇:HTRI資料總結(jié)
(一)Shell and tube heat exchanger design procedure 管殼式換熱器設(shè)計(jì)步驟
1.Identify service(process unit, heat exchanger type as cooler, reboiler, condenser, chiller, steam generator etc.).定義服務(wù):(工藝設(shè)備,換熱器如:冷卻器,再沸器,冷凝器,深冷器,蒸汽發(fā)生器等等)2.Identify heating medium and cooling medium;定義加熱介質(zhì)和冷卻介質(zhì)
3.Check hot / cold side is heat balance or not? if not, how much differ? less than or equal to 5%, reminder process guy and continue to design;more than 5%, reject process datasheet and stop.校核熱/冷側(cè)是否熱平衡?如果不是的話,相差多少?小于等于5%時(shí),工藝計(jì)算提示繼續(xù)設(shè)計(jì),超過(guò)5%,返回并結(jié)束設(shè)計(jì)。
4.Is temperature cross? How many “e” shells in series required?(Normally 2 shells in series can be adapt to about 10 degree temperature cross.)溫度交叉?要求多少E型殼體?(通常雙殼程適用于10℃的溫度交叉)
5.Select the TEMA type(normally project should have a heat exchanger thermal design guide.)選擇TEMA標(biāo)準(zhǔn)(通常,每一個(gè)換熱器都有熱力設(shè)計(jì)指南)
6.Select tube material and shell material(if not specified by material engineer guy).選擇管程材料和殼程材料(如果不是材料工程師具體指定的)
7.Select tube length(normally 16' or 20' for horizontal exchangers;10' or 12' for vertical thermosyphon reboilers.)選擇換熱管長(zhǎng)度(通常水平布置換熱器用16’或者20’,垂直熱虹吸再沸器用10’和12’)8.Select the start shell id, number of tubes and number of tube passes.選擇殼體內(nèi)徑,換熱管數(shù)量和管程數(shù) 9.Select baffle type, orientation, cut and spacing 選擇折流板形式,方向,切口和間距 10.Determine nozzle size and location 選擇接管尺寸和位置
11.First try, adjust design parameters 首次調(diào)試,調(diào)整設(shè)計(jì)參數(shù)
(二)Topic: thermal design by HTRI 主題:HTRI熱力設(shè)計(jì)
Design parameters(suitable to HTRI)設(shè)計(jì)參數(shù)(適用于HTRI)
Shell I.D, Tube length, Tube OD, Tube pitch, Tube count, Tube pass, Baffle type, Cut and spacing, Flow rate of hot & cold fluid
殼程內(nèi)徑,管長(zhǎng),管外徑,管間距,管數(shù)量,管程數(shù),折流板類型、切口形式以及間距,冷熱流體的流速。
Different person runs, get different results.(運(yùn)算結(jié)果因人而異)a)Different background 不同的背景材料 b)Personnel conscious 個(gè)人意識(shí)
c)How much know about HTRI programs 對(duì)HTRI的認(rèn)知深淺 d)Confidence level 把握程度 e)Mistakes 犯錯(cuò)
HTRI Case Mode: Rating, Simulation, Design HTRI案例、模擬、設(shè)計(jì) Shell Geometry: Type 殼程幾何結(jié)構(gòu)
Baffle Geometry: Type-none, single segmental(單弓形), double segmental(雙弓形), NTIW(no tube in window)窗口不排管, Rod折流桿, Helical螺旋折流板, Double Helix雙螺旋, EM full 蛋框式全折流板, EM Segmental 蛋框式部分折流板.Orientation方向: Horizontal, vertical, 45 degree 水平、豎直、45°傾斜 Cut-min.max.Spacing-inlet, outlet, min, max.Tube Geometry: low fin, longitudinal fin, bare tube, win land GEWAKS.低翅片、縱向肋片、光管、維蘭德GEWA-KS管
Fin Geometry: See databank or manual input;見數(shù)據(jù)庫(kù)和操作手冊(cè)
Reboiler Data: Thermosiphon Reboiler, kettle type reboiler, required liquid head, inlet pressure location, reboiler piping setting.重沸器數(shù)據(jù):熱虹吸重沸器,釜式重沸器、所需液柱壓力、進(jìn)口壓力,重沸器配管 Tube pass, Pass lane Baffle Geometry: Double Segmental, over lap tube rows;Variable baffle-up to 5 different spacing;折流板結(jié)構(gòu):雙弓形,Clearance: Block A, F, E stream;setting seal strip/ rod;bundle-to-shell clearance, baffle-to-tube clearance, nozzle inlet / outle height;間隙:A,F,E流路;設(shè)計(jì)密封條和密封桿;管束和殼體間的間隙,折流板和換熱管的間隙,進(jìn)出口接管高度:
Nozzle: inlet / outlet & vent/drain 接管:進(jìn)出口和排氣管、排水管 Distribution Belts Impingement device: rod / plate 防沖裝置:防沖桿/防沖板
Optional: Double Tubesheet, Expansion Joint, Floating Head Support Plate, Full Support at U-bend, inlet / outlet partial support;雙管板、膨脹節(jié)、浮頭式換熱器支撐板、U形管彎管處加全支撐,管子進(jìn)口/出口段加部分支撐。
3(三-1)Comply with ASME code during early design stages 起步設(shè)計(jì)階段遵從ASME標(biāo)準(zhǔn)
Compliance with the ASME Code during the thermal design phase assures that the final shell-and-tube heat-exchanger design is accurate and minimizes lost time and labor for making revisions later.熱力設(shè)計(jì)階段遵從ASME標(biāo)準(zhǔn)能確保管殼式換熱器的最終設(shè)計(jì)的準(zhǔn)確性,將浪費(fèi)的時(shí)間縮至最低,為后期版本的修改減少工作強(qiáng)度。
The classical division between thermal design engineers and mechanical design engineers is becoming blurred.Tools are now available that enable the design engineer to perform an integrated thermal/mechanical design calculation.熱工計(jì)算工程師和設(shè)備設(shè)計(jì)工程師之間傳統(tǒng)的劃分正在變得模糊?,F(xiàn)在軟件的可行性使得設(shè)計(jì)工程師解決熱力和設(shè)備設(shè)計(jì)整套的計(jì)算。Traditionally, the process engineer would design the heat exchanger to meet process requirements and then transfer the basic exchanger geometry to a mechanical engineer for detailed mechanical design.The mechanical engineer would apply construction code rules, such as those established by ASME and by the Tubular Exchanger Manufacturers Association(TEMA), and check for overstress conditions caused by thermal and other stresses(longitudinal, compressive, etc.).In many cases, a change was initiated by the mechanical engineer that would affect the thermal design.If the mechanical engineer recognized this, the change would be sent back to the process engineer for review.This “work-in progress” transfer would be repeated several times, wasting time and money with each transfer.一般來(lái)講,工藝工程師設(shè)計(jì)換熱器來(lái)滿足工藝需要,然后提出基本的換熱器結(jié)構(gòu)給設(shè)備工程師,設(shè)備工程師完成詳細(xì)的設(shè)備設(shè)計(jì)。設(shè)備工程師將按照結(jié)構(gòu)標(biāo)準(zhǔn),比如那些已經(jīng)實(shí)施的ASME標(biāo)準(zhǔn)和TEMA標(biāo)準(zhǔn)。校核由于熱應(yīng)力以及其他應(yīng)力(軸向應(yīng)力、壓縮應(yīng)力等等)。在許多例子中。設(shè)備工程師的一個(gè)變動(dòng)將影響到熱力設(shè)計(jì)。如果設(shè)備工程師認(rèn)識(shí)到這點(diǎn),這個(gè)變動(dòng)得反饋給工藝工程師以求審核。這樣的工作過(guò)程的流轉(zhuǎn)將會(huì)被重復(fù)好幾次。每一次流轉(zhuǎn)都會(huì)費(fèi)時(shí)費(fèi)錢。
With recent improvements in computerized design tools, we now have the ability to do a “once-through” thermal and mechanical design, resulting in significant cost savings.A project engineer with the appropriate tools can now oversee the design process from thermal design to mechanical design without costly back-and-forth movement of data.This procedure can also be extended to vendors, thereby saving a significant amount of time sending, receiving, checking, and re-sending design data.隨著進(jìn)來(lái)設(shè)計(jì)工具計(jì)算機(jī)化的改進(jìn),我們現(xiàn)在有能力做一個(gè)一次性就能通過(guò)的熱力和機(jī)械計(jì)算。而且成本顯著的節(jié)約。恰當(dāng)?shù)睦霉ぞ唔?xiàng)目工程師能夠?qū)崃υO(shè)計(jì)到機(jī)械設(shè)計(jì)整個(gè)流程進(jìn)行監(jiān)督,而不會(huì)造成高昂代價(jià)的前后反反復(fù)復(fù)的數(shù)據(jù)變動(dòng)。這個(gè)程序也可以擴(kuò)展到供應(yīng)商,從而節(jié)省大量用來(lái)發(fā)送,接收,檢查的時(shí)間以及設(shè)計(jì)修改數(shù)據(jù)發(fā)送的時(shí)間。
Shell-and-tube equipment design 管殼式換熱器的設(shè)計(jì)
A successful shell-and-tube heat-exchanger design includes many aspects: thermal design, mechanical design, external piping loads, seismic loads, wind loads, support design, cost estimation, drawing generation, and so on.The ASME Code(as well as other construction codes, such as AD-Merkblatter [Germany], Code Francais de Construction des Appareils a Pression(CODAP)[France], and BS 5500 [U.K])plays an important role in the completion of many of these analyses.一個(gè)成功的管殼式換熱器設(shè)計(jì)包括許多方面:熱力設(shè)計(jì)。機(jī)械設(shè)計(jì),外部的管道配置,地震載荷,風(fēng)載荷,支座設(shè)計(jì),造價(jià)估計(jì),生成圖紙等等。ASME標(biāo)準(zhǔn)(和其他的建造標(biāo)準(zhǔn)一樣,比如德國(guó)的AD-Merkblatter 標(biāo)準(zhǔn),法國(guó)的CODAP標(biāo)準(zhǔn),英國(guó)的BS 5500)在許多完成分析中起著重要的作用)
Many studies have been conducted on the thermal optimization of heat exchangers.For instance, Stein Meyer suggests that there are over 500 publications on the subject of heat-exchanger optimization(1).However, true optimization not only encompasses the thermal design portion, but also mechanical design.In selecting an optimum heat exchanger design for a particular service, many issues need to be considered, including the following.: e3 {.w+!n9 S' h 對(duì)換熱器的換熱優(yōu)化已經(jīng)做了很多的研究,比如Stein Meyer 說(shuō)已經(jīng)有超過(guò)500部以換熱器優(yōu)化為主題的出版物。然而,真正的優(yōu)化不僅包括熱力設(shè)計(jì)部分,還包括了機(jī)械設(shè)計(jì)。在為一個(gè)特定條件選擇一個(gè)最佳的換熱器設(shè)計(jì),很多問(wèn)題需要考慮,包括以下內(nèi)容:
Geometry: The best configuration for a given process is sometimes difficult to select.For example, a distillation column reboiler can have either forced circulation(using a pump)or natural circulation(where the fluid density is the driving force), and within these two categories, the reboiler can be horizontal or vertical, with or without a removable bundle, and so on.結(jié)構(gòu):給定工藝的最佳結(jié)構(gòu)置,有時(shí)難以選用。例如,蒸餾塔再沸器要么強(qiáng)制循環(huán)(用泵)要么自然循環(huán)(流體的密度是動(dòng)力),并在這兩者之中,再沸器可水平也可垂直,還有和蒸餾塔是可拆卸裝配還是固定裝配,等等。
Vessel shapes also contribute significantly to the cost of the unit.In general, flat components(e.g., a flat head)will be several times thicker than curved ones(e.g., a formed head).Therefore, unless there are reasons to specify flat components(such as for easier access to internals), it is always better to specify curved ones(2).容器的形狀也有助于控制成本。在一般情況下,平面部件(例如,一個(gè)平封頭)比弧形的(例如,成型封頭)要厚數(shù)倍。因此,除非有原因才使用平面部件(如更容易地進(jìn)入到設(shè)備內(nèi)部),弧形封頭一直是更好的選擇。
Maintenance: It is important to consider cost reductions throughout the life of the equipment.For example, ease of maintenance is very important in high-fouling environments where frequent cleaning is required.Fouling can often be minimized by maintaining high fluid velocities and avoiding stagnant fluid regimes.Other considerations include the selection of the most appropriate method for cleaning(chemical or mechanical, off-line or on-line, etc.)and establishing whether the tube bundle needs to be removed to be properly cleaned(3).維護(hù):考慮整個(gè)設(shè)備的使用壽命來(lái)降低造價(jià)那是相當(dāng)重要的。比如,在高污染介質(zhì)中頻繁清洗對(duì)于維護(hù)是非常重要的的。污垢往往可以最小化而能保持高流速和避免流體停滯的現(xiàn)象。其他考慮因素包括選擇最合適的方法進(jìn)行清洗(化學(xué)或機(jī)械,停車狀態(tài)或正常運(yùn)行狀態(tài),等等),并確定管束有無(wú)必要抽出清洗。Vibration: Vibration or excessive velocity can occur even in an exchanger that has been designed for optimum operation and maintainability.In many cases, the type of baffling or baffle spacing(or both), tube layout, or tube dimensions may have to be modified to avoid these problems.For example, using more longitudinal flow will decrease fluid velocities and reduce the probability of vibration.These changes require redesigning the unit to establish the optimum process design that also avoids these problems.振動(dòng):在已完成按照最優(yōu)化操作和維護(hù)設(shè)計(jì)的換熱器中可能會(huì)出現(xiàn)振動(dòng)或者過(guò)高的流速,在許多情況下,只需改動(dòng)折流板或者折流板間距(或兩者),換熱管排布,或者管間距的形式就能避免這些問(wèn)題。例如更多的縱向流動(dòng),降低流速,就能減少振動(dòng)的可能性。這些改變,需要重新設(shè)計(jì)以確定最佳的工藝設(shè)計(jì)從而避免這些問(wèn)題。
Erosion-corrosion: Erosion-corrosion can decrease the equipment's operational life.One method to avoid excessive erosion is to maintain fluid velocities below an allowable maximum.Erosion effects are also important in corrosion chemistry.Changes in oxygen concentration, as well as the destruction of protective layers, are other consequences of erosion attack(4).沖刷腐蝕:沖刷腐蝕會(huì)降低設(shè)備的使用壽命。避免過(guò)度侵蝕的方法之一就是保持低于允許的最大流速。
Suitable materials of construction and protective covers can be selected to minimize corrosion attack and reduce costs.For example, cost savings of over 50% have been realized using alloy-clad materials rather than solid alloys(5).In addition, care should be taken to avoid excessive thermal stresses caused by welding metals with different thermal 合適的結(jié)構(gòu)材料和保護(hù)層能將腐蝕最小化并能降低成本。比如,用合金襯里就比全合金省50%以上的資金。另外,由于金屬焊接溫度的差異導(dǎo)致熱應(yīng)力必須得重視
6(三-2)Mechanical design the ASME Code 機(jī)械設(shè)計(jì)ASME標(biāo)準(zhǔn)
The ASME Code was established by the American Society of Mechanical Engineers at the turn of the century to standardize boiler design because of frequent boiler explosions.The current edition is the 1995 ASME Boiler and Pressure Vessel Code.The section of interest to shell-and-tube heat-exchanger designers is Section VIII, Rules for Construction of Pressure Vessels, Division 1.This is the primary standard used for vessel mechanical design in the United States.ASME標(biāo)準(zhǔn)是在本世紀(jì)初由于頻繁的鍋爐爆炸事件發(fā)生而由美國(guó)機(jī)械工程師協(xié)會(huì)建立的。當(dāng)前的版本是1995年的ASME鍋爐壓力容器準(zhǔn)則。感興趣的管殼式換熱器部分是第VIII卷-壓力容器監(jiān)造規(guī)程第一分冊(cè)。在美國(guó),這是壓力容器設(shè)計(jì)最主要的標(biāo)準(zhǔn)。
What can go wrong? 會(huì)出什么錯(cuò)?
Performing mechanical design independently from thermal design can result in an exchanger that does not perform as expected.Two main types of problems can occur:
脫離了熱力設(shè)計(jì)的機(jī)械設(shè)計(jì)可能會(huì)導(dǎo)致?lián)Q熱器的性能達(dá)不到預(yù)期效果。兩個(gè)最主要的問(wèn)題可能會(huì)發(fā)生:
Changes initiated by mechanical design that require adjustment to thermal design;and mechanical design criteria that can significantly increase cost.機(jī)械設(shè)計(jì)的改變可能會(huì)需要重新調(diào)整熱力設(shè)計(jì),機(jī)械設(shè)計(jì)的準(zhǔn)則能明顯的增加造價(jià)。Changes that require more changes 一方的改動(dòng)需要另一方更多的改動(dòng)
Changes made by the mechanical designer that necessitate thermal design adjustments include: 機(jī)械設(shè)計(jì)者得變動(dòng)需要熱力設(shè)計(jì)有如下調(diào)整:
1.Tubes that will not fit into the stated diameter.This can occur because(a)a minimum tolerance is required for mechanical construction(for example, for TEMA T or S rear head types),(b)a high tube side design pressure reduces the available outer tube limit(OTL)calculated during the thermal design,(c)the inside diameter was used for thermal design but an outside diameter criterion had to be used for mechanical design due to the product form(e.g., pipe vs.plate), or(d)the outside diameter was used for thermal design and the resulting wall thickness calculated in the mechanical design reduces the number of tubes that will fit in the shell.1.換熱管原先的管徑不再適合。這可能是因?yàn)椋?/p>
a)機(jī)械結(jié)構(gòu)需要最小的公差。(比如,TEMA標(biāo)準(zhǔn)的浮頭式換熱器“T”或者“S”型后端管箱)b)熱力設(shè)計(jì)中,一個(gè)高設(shè)計(jì)壓力的管程會(huì)減少已計(jì)算好的最外側(cè)布管限制數(shù)量。
c)熱力設(shè)計(jì)一般用內(nèi)徑,而機(jī)械設(shè)計(jì)由于產(chǎn)品形式(如用板材卷制的管道)一般用外徑準(zhǔn)則。d)熱力設(shè)計(jì)中用外徑計(jì)算時(shí),機(jī)械設(shè)計(jì)中計(jì)算壁厚的結(jié)果會(huì)減少換熱管的數(shù)量從而適合殼體。
2.Additional tube supports added to stiffen the rear end of bundles with floating heads or U-tubes 額外增加的換熱管支撐能增強(qiáng)浮頭式或U型管尾端的強(qiáng)度
3.Shell side nozzles that are moved due to construction requirements, such as mechanical reinforcement rules, hub flanges clearances, etc.由于結(jié)構(gòu)需要?dú)こ探庸芤灰苿?dòng),比如機(jī)械加固,hub flanges clearances,等等
4.Mechanical design changes, such as a different exchanger type, different materials, closer baffle spacing, or different tube dimensions, to accommodate the differential expansion of the shell and tubes in fixed-tubesheet exchangers.4.改變機(jī)械設(shè)計(jì)以滿足固定管板式換熱器殼體和換熱管的膨脹差,諸如不同的換熱器形式,不同的材料,減小折流板間距或者不同的管徑
5.Mechanical design changes to reduce excessive thermal stresses in one component due to the large temperature gradients, for example, the tubesheet in multipass units.比如,多管程換熱器中管板,由于大的溫度梯度,在其中通過(guò)改變機(jī)械設(shè)計(jì)來(lái)減少過(guò)分的熱應(yīng)力。
Tubes will not fitO.D.vs.I.D.If the product form is pipe but the unit was thermally designed to use plate, the number of tubes may not fit.The mechanical portion of the design software will calculate the required wall thickness.If this wall thickness is significant and the design proceeds inward from the outside diameter, the resulting inside diameter may not be large enough to contain the required internals.This problem can also happen if the thermal design is based on the vessel outside diameter.The channel(tube)side may also control the tube layout, particularly when the pressure differential between the tubeside and the shellside is considerable.Special tubesheet construction, such as stub ends for butt welds, will add additional clearance that can also reduce the area available for tubes.換熱管將不適用于-外徑相對(duì)于內(nèi)徑。如果殼體的生產(chǎn)形式以標(biāo)準(zhǔn)管道來(lái)設(shè)計(jì),但是該裝置卻熱力設(shè)計(jì)時(shí)使用板材卷制時(shí)。計(jì)算軟件的機(jī)械設(shè)計(jì)部分算出所需殼體壁厚,如果壁厚比較大,而且設(shè)計(jì)步驟是從外徑再確定內(nèi)徑的話。所得的殼體內(nèi)徑將不滿足所需的內(nèi)部空間。如果熱力設(shè)計(jì)是基于容器外徑那么問(wèn)題就會(huì)發(fā)生。尤其是當(dāng)管程和課程的壓力差比較大時(shí),管程可能會(huì)約束換熱管的排管布置。特別是管板結(jié)構(gòu),比如,將會(huì)多出額外的間隙這樣也會(huì)降低布管區(qū)域的可利用性。
Additional tube supports.In typical removable-bundle designs, the tubes need to be rigid enough to avoid sagging.One way to stiffen the bundle is to add support plates near the rear head of a floating head or U-tube exchanger(Figure 2).In some instances, these additional supports render the tube surface partially ineffective in this area.The same situation arises in U-tube construction when the baffle span is greater than recommended to avoid vibration--additional supports are added at the rear of the U-tube bundle to reduce the unsupported tube span.Care should be taken to make the tube surface in these areas as effective as possible without unreasonable pressure drop penalties.額外的管支撐,在典型的可移動(dòng)管束設(shè)計(jì)中,換熱管需要加固措施以避免管子下垂,加固管束的方法之一就是在浮頭式或者U型管式換熱器尾部增加支撐板。在某些情況下,額外的支撐會(huì)使換熱管和支撐板接觸的表面部分會(huì)換熱失效,在同樣的情況下,U型管換熱器中當(dāng)折流板間距大于推薦值時(shí)可以避免振動(dòng)---在U型管束的彎管處增加額外的支撐能降低無(wú)支撐跨距。還要對(duì)換熱管表面采取一定的有效措施以避免不合理的壓力降損失。
Incorrect nozzle location.Another potential problem involves the position of the shell nozzles relative to the baffles.The proper nozzle position with respect to the impingement plate and the first baffle is illustrated in Figure 3a.錯(cuò)誤的接管位置。另一個(gè)潛在的問(wèn)題就是殼體接管相對(duì)于折流板的位置,圖3a所示為接管相對(duì)于防沖板和第一塊折流板的恰當(dāng)位置。
A reinforcing pad is required(discussed later), the shell inlet nozzle may be shifted(to accommodate the required clearance between the pad and the tubesheet), as shown in Figure 3b.With the nozzle in this position, the inlet flow is split by the first baffle and much of the flow misses the impingement plate, resulting in severe fluid bypass and potential tube erosion.This can be avoided by moving the impingement plate and first baffle to the right so they are positioned correctly relative to the impingement plate and baffle.如果需要補(bǔ)強(qiáng)圈(后續(xù)討論),正如圖3b所示可能會(huì)改變殼體的進(jìn)口管位置(以調(diào)整管板和補(bǔ)強(qiáng)圈之間的距離)。介于接管所處位置,進(jìn)口流體被第一塊折流板后分成多股流體再加上大量的流體不通過(guò)防沖板而直接沖刷管束,導(dǎo)致產(chǎn)生很多旁路流體并且存在潛在的換熱管沖刷腐蝕。通過(guò)移動(dòng)防沖板位置和第一塊折流板的位置便能避免這些問(wèn)題。
Changes in mechanical design.If design changes are made during the mechanical design phase, a thermal re-evaluation of the exchanger may be required.For example, a common solution to solve excessive tube compressive stress in fixed tubesheet exchangers is to add more baffles.If such action were taken, the previous thermal design results would be incorrect.機(jī)械設(shè)計(jì)上的改變。如果在機(jī)械設(shè)計(jì)階段時(shí)設(shè)計(jì)出現(xiàn)變更,那么換熱器的熱效率需要被重新評(píng)估。比如,固定管板換熱器過(guò)分的壓縮應(yīng)力常用方法是增加折流板數(shù)量。一旦采取這些措施,原先的熱力設(shè)計(jì)將會(huì)不再準(zhǔn)確
Changes to reduce thermally induced stresses.All stresses in a vessel must be within the maximum allowed by code.In a heat exchanger, since both sides are at different temperatures, there will always be thermal stresses.Depending on the temperature gradient, geometry, materials of construction, and other factors, these stresses can be significant.Mechanical changes designed to reduce thermally induced stresses can severely impact thermal performance.為降低熱應(yīng)力做變動(dòng),容器內(nèi)所有的應(yīng)力必須在標(biāo)準(zhǔn)允許的最大范圍內(nèi)。在換熱器中,管程和殼程有溫度差,所以一直有熱應(yīng)力。根據(jù)溫度梯度,幾何形狀,結(jié)構(gòu)材料以及其他因數(shù),這些應(yīng)力相當(dāng)大,為降低熱應(yīng)力而做的機(jī)械設(shè)計(jì)變更可能大幅的影響熱性能。
In the simplest case, an expansion joint needs to be added to a fixed-tubesheet exchanger to absorb the excessive thermal stresses.If the stresses are still too high after adding an expansion joint, a change in geometry is required.在最簡(jiǎn)單的情況下,固定管板式換熱器需加一個(gè)膨脹節(jié)來(lái)吸收過(guò)多的熱應(yīng)力,如果在加了膨 脹節(jié)后應(yīng)力仍然很大,那么就需要改變幾何結(jié)構(gòu)了。
A floating head or U-tube construction may be acceptable if a fixed-tubesheet unit cannot be used.Exchanger designs that serve dual purposes can sometimes be used.For example, if a fixed-tubesheet kettle is going to be used and the stress analysis recommends an expansion joint, the kettle itself can serve as an expansion joint.Clearly, dual-purpose construction lowers capital costs.Excessive thermal stresses can also occur in multi-tube exchangers where the tubesheet is subject to large temperature gradients from pass to pass.In these cases, proper gasket selection is important to avoid potential leakage due to metal distortion.如果固定管板式不能使用,那么可以用浮頭式和U型管式的換熱器。有時(shí)要設(shè)計(jì)雙重作用的換熱器。比如,使用釜式固定管板式換熱器并且應(yīng)力分析建議使用膨脹節(jié),釜體本身可充當(dāng)膨脹節(jié)。所以雙重作用的結(jié)構(gòu)形式能降低成本資金。在多管程換熱器中,由于流體的流進(jìn)流出管板存在很大的溫度梯度,繼而產(chǎn)生過(guò)度的熱應(yīng)力。在這些情況下,由于金屬的變形,為了避免潛在的泄露而選擇恰當(dāng)?shù)膲|片形式是非常重要的。
10(三-3)Mechanical criteria that affect cost 機(jī)械標(biāo)準(zhǔn)影響了成本
Mechanical design criteria that can significantly affect the cost of an exchanger include: 機(jī)械設(shè)計(jì)標(biāo)準(zhǔn)顯著的影響換熱器成本包括如下: 1.Equipment designed under “l(fā)ethal service” Code rules.1.致命錯(cuò)誤下設(shè)計(jì)的設(shè)備
2.Special materials of construction or construction features required to accommodate very low or very high design temperatures.2.很低或者很高的設(shè)計(jì)溫度需要特殊的結(jié)構(gòu)材料和結(jié)構(gòu)形式
3.Supports that need to be redesigned because of excessive shell or head buckling due to support loads.因?yàn)橹С休d荷引起殼體和管箱過(guò)度位移,需要重新設(shè)計(jì)支撐形式
Lethal service: If a vessel's contents could kill, it is the user's responsibility to provide a safe design.The ASME Code provides rules to make vessels safer under the label “l(fā)ethal service.” 危險(xiǎn)性使用:如果容器的介質(zhì)是致命性的,提供安全的設(shè)計(jì)服務(wù)是對(duì)用戶的責(zé)任。在―危險(xiǎn)性使用‖標(biāo)簽下,ASME標(biāo)準(zhǔn)為容器提供更安全的規(guī)章。
Although many substances are harmful if allowed to escape the vessel boundaries, the Code defines lethal substances as poisonous gases or liquids that are dangerous to life when inhaled(e.g., hydrocyanic acid, carbonyl chloride, cyanogen ,xylyl bromide, and others(8)).However, many other processes could easily qualify as lethal if somehow the vessel contents were allowed to escape.The decision then becomes one of added cost vs.additional safety features.The equipment user has the responsibility of labeling the equipment as “l(fā)ethal service.”
盡管許多物質(zhì)具有有害性,即使允許不納入容器劃類,但是對(duì)于吸入這些有毒的氣體或液體后對(duì)人產(chǎn)生危害的(比如氫氰酸、羰基氯化物、光氣、甲芐基溴等),規(guī)程把其定義為致命性物質(zhì)。如果有時(shí)容器介質(zhì)允許不劃類,但是其他許多因素很容易使其被認(rèn)為是致命性的。然后就是決定到底是增加制造成本還是額外安全附件。設(shè)備用戶有責(zé)任在設(shè)備上標(biāo)示―危險(xiǎn)性使用‖
Lethal service designs have the following requirements: vessel butt welds must be fully radio graphed;
使用具有危險(xiǎn)性的設(shè)備必須遵循以下要求;容器的對(duì)接焊縫必須100%RT。
Body flanges must be of the hub type;carbon steel material must be post-weld heat-treated;and additional rules concerning tubes and product forms(such as seamless rather than welded tubes [the latter require further testing])must be adhered to.凸面法蘭必須是帶頸法蘭形式;碳鋼必須做焊后熱處理;以及必須遵守?fù)Q熱管產(chǎn)品形式的附加規(guī)則(例如是無(wú)縫鋼管而不是焊接管[后者需要復(fù)檢])。
Full radiography means to x-ray every butt-weld seam of the vessel to verify the quality of the welds.Figure 4 illustrates a hub-type flange with a butt-weld at the end.In contrast, a simple ring flange is shown in Figure 5.Note that the simple ring flange, although more economical, cannot be used in lethal service because of the lack of a butt weld.Welds of the type shown in Figure 5 are referred to as fillet welds, and they cannot be x-rayed in a meaningful way.100%RT能確保每一道對(duì)接焊縫的質(zhì)量。圖4所示為一帶頸對(duì)焊法蘭。相反,如圖5所示一個(gè)簡(jiǎn)單的法蘭盤,盡管更加便宜,但是由于焊縫不能對(duì)接所以不能用在危險(xiǎn)性設(shè)備上。圖5所示的焊縫為角焊縫,角焊縫不易做X射線探傷。
Low-temperature service: In low-temperature service(typically lower than-20F), it is important to make sure that the metals will not fail due to loss of impact resistance.Several tests are required to ensure that unalloyed ferrous materials will behave adequately at low temperatures.At low operating temperatures(the specific temperature depends on the particular material), impact tests may be required on the materials and welds.In some cases, different materials whose properties are better at low temperatures may have to be used.The Code requires each vessel component to be reviewed, its minimum design metal temperature(MDMT)calculated, and the controlling MDMT stamped on the vessel.低溫工況;在低溫工況下(通常低于-20F), 確保材料的沖擊性能是非常重要的,需要做幾項(xiàng)測(cè)試。在低溫環(huán)境下,需要做幾項(xiàng)測(cè)試來(lái)確保合金的低溫性能。在很低工作的溫度下(具體溫度取決于特定的材料),母材和焊縫需要做沖擊試驗(yàn)。在某些情況下,不同的材料在低溫條件下性能更好。標(biāo)準(zhǔn)規(guī)定,容器每個(gè)部件都要進(jìn)行審核,按其最低設(shè)計(jì)金屬溫度(MDMT)計(jì)算并且在容器上印上最低設(shè)計(jì)金屬溫度的控制值。
High-temperature service: Metals have different mechanical strengths that depend on temperaturethe horizontal shellside-vaporization kettle with finned tubes is roughly equivalent in price to the vertical tubeside reboiler with plain tubes.對(duì)熱力/機(jī)械設(shè)計(jì)進(jìn)行聯(lián)合優(yōu)化,再沸器的成本降低40%,從 186,400 美元降到109,500美元,并且冷凝器的成本減少了65%,從81700美元降到29,000美元(見表1)。翅片管式的水平釜式再沸器和普通的垂直氣化再沸器價(jià)格上大致相當(dāng),最終可能成為替代品。Glycerin/water evaporator.甘油/水蒸發(fā)器
Differences in material of construction costs can be significant.Consider a glycerin/water evaporator operating under vacuum.If corrosion were not a problem and carbon steel could be used on the process side, the equipment cost would be 60% less than if the unit were built of the recommended Type 316L stainless steel.If the process side of the exchanger were classified as lethal service, the increase in cost to meet the more-stringent construction criteria would be 15%;additional costs would be incurred if the whole unit were to be classified as lethal service(Table 2).材料在制造成本上的差異可能會(huì)很大。以真空狀態(tài)下的甘油/水蒸發(fā)器為例。如果沒有腐蝕問(wèn)題,管程和殼程可以用碳鋼,這樣設(shè)備的成本會(huì)比使用316L材料減少60%以上。如果換熱器的其中一程被認(rèn)定為危險(xiǎn)性工況,如果為滿足嚴(yán)格要求費(fèi)用將提高15%,如果管程和殼程都是危險(xiǎn)工況的話成本又會(huì)上去(見表2)
Platform feed vaporizer/reactor effluent condenser.Although there are obvious cases that dictate whether a fluid should be placed on the shellside or tubeside to maximize thermal performance, even in cases that look equivalent it is important to at least consider the possibility of switching sides.In this example, platform feed is vaporized from a vapor/liquid mixture at about 165 psia and reactor effluent is partially condensed at about 433 psia.Everything else being equal(such as maintenance requirements, etc.), switching fluid sides reduces the cost by 22%(Table 3).板式物料蒸發(fā)器/反應(yīng)器物料進(jìn)入冷凝器。雖然有明顯的情況下,決定流體是走殼程還是管程,可以最大限度地提高傳熱性能,但是甚至在某些情況下,看相當(dāng)于,重要的是,至少要考慮切換流側(cè)的可能性。在這個(gè)例子中,物料是從約165 Psia的氣液混合物中蒸發(fā)出來(lái),和出反應(yīng)器的物料在433 Psia的壓力下冷凝。其他一切條件相同(如維護(hù)要求等),切換流體側(cè)能降低成本22%(見表3)。
Project completion time Thermal and mechanical design integration also reduces the overall costs of a project by reducing the project completion time(10).Additional steps, such as drawing generation and vendor interfacing, could be taken in parallel, thereby further reducing the project completion time.This idea of achieving faster project execution has also been referred to as “fast tracking”(11).熱力和機(jī)械設(shè)計(jì)一體化降低了項(xiàng)目的整體成本也降低了工程完成時(shí)間(10)。另外的步驟可以同時(shí)進(jìn)行,如圖紙生成和供應(yīng)商的接口,從而進(jìn)一步降低了該項(xiàng)目的完成時(shí)間。這種更快完成項(xiàng)目的思想也被稱為―快速追蹤‖(11)。Conclusion 結(jié)論
With the advancement of integrated tools, the project engineer can now design shell-and-tube heat exchangers from beginning to end, including fabrication drawings.The advantages of this once-through approach are significant:
隨著集成工具的進(jìn)步,項(xiàng)目工程師現(xiàn)在可以從項(xiàng)目開始到結(jié)束全程跟蹤,包括制造圖紙?jiān)O(shè)計(jì)和管殼式換熱器的設(shè)計(jì)。這一次通過(guò)的方法的優(yōu)點(diǎn)是顯著的: reduced costs because of an optimized thermal and mechanical design;因?yàn)闊崃蜋C(jī)械設(shè)計(jì)的優(yōu)化降低了成本
Reduced costs as a result of applying ASME rules early in the project and minimizing rework later;
由于在項(xiàng)目初期運(yùn)用了ASME標(biāo)準(zhǔn)和對(duì)返工最小化而減少成本。
Reduced costs associated with shorter project completion times;and improved cost projections resulting from the simulation of equipment fabrication 縮短項(xiàng)目的完成時(shí)間降低成本,并且因進(jìn)行設(shè)備制造的模擬仿真而增加了設(shè)計(jì)費(fèi)
15(四-1)管板式換熱器的有效設(shè)計(jì)
Chemical Engineering Progress , Feb 1998 by Mukherjee, Rajiv To make the most of exchanger design software, one needs to understand STHE classification, exchanger components, tube layout, baffling, pressure drop, and mean temperature difference.為了充分利用設(shè)計(jì)軟件,人們需要了解固定管板式換熱器分類,比如換熱器組件,管程布局,折流板位置,壓降,以及平均氣溫差異
Thermal design of shell-and-tube heat exchangers(STHEs)is done by sophisticated computer software.However, a good understanding of the underlying principles of exchanger design is needed to use this software effectively.管殼式換熱器熱設(shè)計(jì)(STHEs)是由精密的電腦軟件設(shè)計(jì)的。然而為了有效使用該軟件,需要很好的對(duì)換熱器設(shè)計(jì)的基本原則。
This article explains the basics of exchanger thermal design, covering such topics as: STHE components;classification of STHEs according to construction and according to service;data needed for thermal design;tubeside design;shellside design, including tube layout, baffling, and shellside pressure drop;and mean temperature difference.The basic equations for tubeside and shellside heat transfer and pressure drop are wellknown;here we focus on the application of these correlations for the optimum design of heat exchangers.A followup article on advanced topics in shell-and-tube heat exchanger design, such as allocation of shellside and tubeside fluids, use of multiple shells, overdesign, and fouling, is scheduled to appear in the next issue.;S6 M;t5 Q% U: F 這篇文章解釋了換熱器設(shè)計(jì)基礎(chǔ),包含的主題例如;固定管板式換熱器成分:依照結(jié)構(gòu)和服務(wù)對(duì)固定管板式換熱器的分類:對(duì)熱設(shè)計(jì)需要的數(shù)據(jù);管程設(shè)計(jì);殼程設(shè)計(jì),包括換熱管的排布和殼程壓力降和不同的平均溫度。換熱器管程殼程的傳熱導(dǎo)和壓力降有一個(gè)著名的基本方程。這里我們著眼于這些對(duì)換熱器優(yōu)化設(shè)計(jì)的相關(guān)應(yīng)用。在后續(xù)的前沿課題中,比如換熱器殼程管程流體的分配,使用多殼程,重復(fù)設(shè)計(jì)以及浪費(fèi),是將在下一期提及。Components of STHEs 固定管板式換熱器的組件
It is essential for the designer to have a good working knowledge of the mechanical features of STHEs and how they influence thermal design.The principal components of an STHE are: 設(shè)計(jì)師有一個(gè)良好的STHEs的機(jī)械性能的知識(shí),以及他們?nèi)绾斡绊懥藷崃υO(shè)計(jì),那是必不可少的。STHEs的主要組成部分是 shell;殼程 shell cover;封頭 tubes;換熱管 channel;管箱 channel cover;管箱蓋 tube-sheet;管板 baffles;折流板 nozzles.接管
(四-2)Other components include tie-rods and spacers, pass partition plates, impingement plate, longitudinal baffle, sealing strips, supports, and foundation.其他內(nèi)容包括:拉桿和定距管,分程隔板,防沖板,縱向擋板,密封條,支撐件和基礎(chǔ)條件。The Standards of the Tubular Exchanger Manufacturers Association(TEMA)(1)describe these various components in detail.管殼式換熱器制造協(xié)會(huì)標(biāo)準(zhǔn)(TEMA)詳細(xì)描述了這些不同的組成部分。
An STHE is divided into three parts: the front head, the shell, and the rear head.Figure 1 illustrates the TEMA nomenclature for the various construction possibilities.Exchangers are described by the letter codes for the three sections for example, a BFL exchanger has a bonnet cover, a two-pass shell with a longitudinal baffle, and a fixed-tubesheet rear head.一個(gè)固定管板式換熱器分為三個(gè)部分:前端管箱,殼體和后端管箱。圖一指出了各種結(jié)構(gòu)的TEMA標(biāo)準(zhǔn)術(shù)語(yǔ)。用字母來(lái)表達(dá)換熱器的三個(gè)部分。BFL換熱器就表示前端是封頭管箱,中間是具有縱向隔板的雙程殼體,后端是與B相似的固定管板結(jié)構(gòu)的封頭管箱。
Classification based on construction 基于結(jié)構(gòu)的分類
Fixed tubesheet.A fixed-tubesheet heat exchanger(Figure 2)has straight tubes that are secured at both ends to tubesheets welded to the shell.The construction may have removable channel covers(e.g., AEL), bonnet-type channel covers(e.g., BEM), or integral tubesheets(e.g., NEN).固定管板。固定管板式換熱器(圖2)是兩端帶直管的管板焊在殼體的結(jié)構(gòu)。結(jié)構(gòu)可以是帶可拆卸平蓋管箱(如AEL式),可以是兩頭是封頭管箱式的(如BEM式)或者是兩端與管板制成一體的固定管板結(jié)構(gòu)(如NEN式)。
The principal advantage of the fixedtubesheet construction is its low cost because of its simple construction.In fact, the fixed tubesheet is the least expensive construction type, as long as no expansion joint is required.固定管板結(jié)構(gòu)的主要優(yōu)勢(shì)在于其結(jié)構(gòu)簡(jiǎn)單,成本低。事實(shí)上,只要不需要加膨脹節(jié),固定管板式的是最便宜的結(jié)構(gòu)形式,Other advantages are that the tubes can be cleaned mechanically after removal of the channel cover or bonnet, and that leakage of the shellside fluid is minimized since there are no flanged joints.其他的優(yōu)點(diǎn)在于在可拆卸平蓋管箱或者封頭管箱移除后管程便于機(jī)械沖洗。而且由于沒有法蘭接頭殼程的流體泄露將降至最低。
A disadvantage of this design is that since the bundle is fixed to the shell and cannot be removed, the outsides of the tubes cannot be cleaned mechanically.Thus, its application is limited to clean services on the shellside.However, if a satisfactory chemical cleaning program can be employed, fixed-tubesheet construction may be selected for fouling services on the shellside.該設(shè)計(jì)的一個(gè)缺點(diǎn)是帶管束的管板焊死在殼體上,所以殼程不能做機(jī)械清洗。因此,他的適用范圍僅適用于殼程側(cè)流體干凈的情況。但是如果可以用有效的化學(xué)清洗,固定管板式結(jié)構(gòu)可以用在殼程積垢較高的情況。In the event of a large differential temperature between the tubes and the shell, the tubesheets will be unable to absorb the differential stress, thereby making it necessary to incorporate an expansion joint.This takes away the advantage of low cost to a significant extent.在管殼程溫差較大的情況下,管板將不能吸收應(yīng)力差,因此有必要加上一個(gè)膨脹節(jié)。而在很大程度上失去了低成本的優(yōu)勢(shì)。
U-tube.As the name implies, the tubes of a U-tube heat exchanger(Figure 3)are bent in the shape of a U。
U型管,顧名思義,如圖3所示U型管換熱器的管子被彎曲成―U‖的形狀
There is only one tubesheet in a Utube heat exchanger.However, the lower cost for the single tubesheet is offset by the additional costs incurred for the bending of the tubes and the somewhat larger shell diameter(due to the minimum U-bend radius), making the cost of a U-tube heat exchanger comparable to that of a fixedtubesheet exchanger.U型管換熱器只有一個(gè)管板,然而這種較低成本的單管板換熱器的優(yōu)勢(shì)被由換熱管彎制和大直徑殼體(取決于最小的U形管半徑)的產(chǎn)生的額外費(fèi)用和給抵消了。U形管換熱器的制作成本與固定管板式的相當(dāng)。
The advantage of a U-tube heat exchanger is that because one end is free, the bundle can expand or contract in response to stress differentials.In addition, the outsides of the tubes can be cleaned, as the tube bundle can be removed.U形管的優(yōu)勢(shì)在于換熱管束的一端是自由的,在應(yīng)力差作用下管束能自由的伸縮。另外管束外能被清洗,也能被移除。
The disadvantage of the U-tube construction is that the insides of the tubes cannot be cleaned effectively, since the U-bends would require flexible-end drill shafts for cleaning.Thus, U-tube heat exchangers should not be used for services with a dirty fluid inside tubes.U形管的缺點(diǎn)在于管程側(cè)不能有效清洗,因?yàn)榍逑碪形管需要很靈敏的鉆軸。所以U形管換熱器管程不適用于很臟的流體。
Floating head.The floating-head heat exchanger is the most versatile type of STHE, and also the costliest.In this design, one tubesheet is fixed relative to the shell, and the other is free to “float” within the shell.This permits free expansion of the tube bundle, as well as cleaning of both the insides and outsides of the tubes.Thus, floating-head SHTEs can be used for services where both the shellside and the tubeside fluids are dirty-making this the standard construction type used in dirty services, such as in petroleum refineries.浮頭式。浮頭式換熱器在管板式換熱器中是最通用的,也是最昂貴的一種。在設(shè)計(jì)中,相對(duì)于殼體一個(gè)管板是固定的,另一個(gè)在殼體中作為浮頭是自由的。這種可允許自由膨脹的管束也使管束內(nèi)外都易清洗。因此浮頭式的固定管板換熱器能被用在管殼兩程流體都是很臟的場(chǎng)合,諸如石油精煉。
(四-3)There are various types of floating-head construction.The two most common are the pull-through with backing device(TEMA S)and pullthrough(TEMA T)designs.浮頭式換熱器的結(jié)構(gòu)有很多種。最常見是鉤圈式浮頭(TEMA S)和可抽式浮頭(TEMA T)The TEMA S design(Figure 4)is the most common configuration in the chemical process industries(CPI).The floating-head cover is secured against the floating tubesheet by bolting it to an ingenious split backing ring.This floating-head closure is located beyond the end of the shell and contained by a shell cover of a larger diameter.To dismantle the heat exchanger, the shell cover is removed first, then the split backing ring, and then the floating-head cover, after which the tube bundle can be removed from the stationary end.$ Y& X: ]' J X4 O f8 Y.v2 c2 N$ J In the TEMA T construction(Figure 5), the entire tube bundle, including the floating-head assembly, can be removed from the stationary end, since the shell diameter is larger than the floating-head flange.The floatinghead cover is bolted directly to the floating tubesheet so that a split backing ring is not required.如圖4,在化工行業(yè)里鉤圈式浮頭是最常用的結(jié)構(gòu)。栓住鉤圈使浮頭頂蓋固定在浮頭管板。超出殼體的浮頭后端包在一個(gè)較大直徑的封頭里。拆卸換熱器時(shí),首先移除殼體,再卸去鉤圈,接著就是浮頭頂蓋,然后管束能從固定端移除。在TEMA T結(jié)構(gòu)中(圖5),由于殼體直徑比浮頭法蘭大,管束連帶浮頭能被整體抽出。這種浮頭頂蓋直接被螺栓緊固在否頭管板上,所以不需要鉤圈。
The advantage of this construction is that the tube bundle may be removed from the shell without removing either the shell or the floatinghead cover, thus reducing maintenance time.This design is particularly suited to kettle reboilers having a dirty heating medium where U-tubes cannot be employed.Due to the enlarged shell, this construction has the highest cost of all exchanger types.這種結(jié)構(gòu)的優(yōu)點(diǎn)就在于無(wú)需拆卸殼體或者浮頭頂蓋就能把管束從殼體里抽出,由此降低了維修時(shí)間。這種結(jié)構(gòu)非常適用于工作環(huán)境非常臟并且不能用U形管的釜式重沸器。因?yàn)闅んw直徑被擴(kuò)大了,這種結(jié)構(gòu)在所有的換熱器結(jié)構(gòu)中是造價(jià)最貴的。# e3 P3 W.~(o8 p* g;l' X There are also two types of packed floating-head construction--outsidepacked stuffing-box(TEMA P)and outside-packed lantern ring(TEMA W)(see Figure 1).However, since they are prone to leakage, their use is limited to services with shellside fluids that are nonhazardous and nontoxic and that have moderate pressures and temperatures(40 kg/cm2 and 300 deg C).浮頭式結(jié)構(gòu)也有兩種形式--填料函式浮頭(TEMA P)和帶套環(huán)填料函式浮頭(TEMA W)(見圖1).但是由于容易泄漏,它們的使用范圍僅限于殼程流體為無(wú)毒無(wú)害介質(zhì),并且壓力40 kg/cm2以下溫度在300℃以下
Classification based on service 基于服務(wù)的分類
Basically, a service may be singlephase(such as the cooling or heating of a liquid or gas)or two-phase(such as condensing or vaporizing).Since there are two sides to an STHE, this can lead to several combinations of services.基本上,一個(gè)服務(wù)可以是單相(如冷卻加熱液體或氣體)或者是兩相(比如冷凝和蒸發(fā))。因?yàn)楣馨迨綋Q熱器有兩側(cè),這可能導(dǎo)致有幾種組合
Broadly, services can be classified as follows: 從廣義來(lái)講,可以分為以下幾類: single-phase(both shellside and tubeside);單相(管程和殼程)condensing(one side condensing and the other single-phase);冷凝(一側(cè)冷凝過(guò)程,另一側(cè)單相)vaporizing(one side vaporizing and the other side single-phase);蒸發(fā)(一側(cè)蒸發(fā)過(guò)程,另一側(cè)單相)
condensing/vaporizing(one side condensing and the other side vaporizing).冷凝/蒸發(fā)(一側(cè)冷凝,另一側(cè)蒸發(fā)} The following nomenclature is usually used: 下列術(shù)語(yǔ)通常用于
Heat exchanger: both sides singlephase and process streams(that is, not a utility).換熱器:兩程都是單相的工藝流體
Cooler: one stream a process fluid and the other cooling water or air.冷卻器:一側(cè)工藝流體,另一側(cè)冷卻水或者空氣
Heater: one stream a process fluid and the other a hot utility, such as steam or hot oil.加熱器:一側(cè)工藝流體,另一側(cè)公用工程熱流,如蒸汽或者熱的油品。Condenser: one stream a condensing vapor and the other cooling water or air.冷凝器:一側(cè)蒸汽冷凝,另一側(cè)是冷卻水或者空氣
Chiller: one stream a process fluid being condensed at sub-atmospheric temperatures and the other a boiling refrigerant or process stream.深冷器:一側(cè)是被負(fù)壓狀態(tài)下被壓縮工藝流體,另一側(cè)是沸騰的制冷劑或者工藝流體。Reboiler: one stream a bottoms stream from a distillation column and the other a hot utility(steam or hot oil)or a process stream.再沸器:一側(cè)是來(lái)自蒸餾塔底的流體,另一側(cè)是來(lái)自公用工程(蒸汽或者熱油品)或者是工藝流體。
This article will focus specifically on single-phase applications.本文將側(cè)重單相場(chǎng)合
Design data 設(shè)計(jì)數(shù)據(jù)
Before discussing actual thermal design, let us look at the data that must be furnished by the process licensor before design can begin:
在討論實(shí)際的熱力設(shè)計(jì)之前,我們必須在提供流程許可的條件下開始研究數(shù)據(jù)并開始設(shè)計(jì): 1.flow rates of both streams.兩程流體的流速
2.inlet and outlet temperatures of both streams.兩程流體的進(jìn)出口溫度
3.operating pressure of both streams.This is required for gases, especially if the gas density is not furnished;it is not really necessary for liquids, as their properties do not vary with pressure.兩程流體的工作壓力。尤其是當(dāng)沒有提供氣體密度時(shí),對(duì)氣體來(lái)講那是必須的;因?yàn)橐后w的屬性不隨壓力變化,所以對(duì)于液體不是必須的。
4.allowable pressure drop for both streams.This is a very important parameter for heat exchanger design.Generally, for liquids, a value of 0.5-0.7 kg/cm2 is permitted per shell.A higher pressure drop is usually warranted for viscous liquids, especially in the tube side.For gases, the allowed value is generally 0.05-0.2 kg/cm2, with 0.1 kg/cm2 being typical.兩程流體的許可壓力降。對(duì)于熱力設(shè)計(jì)來(lái)講那是非常重要的。一般對(duì)液體而言殼程的許可壓力降為0.5-0.7 kg/cm2。特別在管程,粘性液體壓降將更大,允許值一般為0.05-0.2 kg/cm2,一般為0.1 kg/cm2
(五)主題:管殼式換熱器鞍座哪一側(cè)為固定端,哪一側(cè)為移動(dòng)端。
Normally, there are two saddles for horizontal shell-and-tube heat exchangers, one defined as channel side saddle and the other defined as rear head side saddle.通常,水平布置的管殼式換熱器有兩個(gè)鞍座,一個(gè)定義為前管箱側(cè)鞍座另一個(gè)定義為后管箱側(cè)鞍座。
As you all know, for these two saddles there shall be one “ fixed” and one “ sliding”.Which one is selected as “sliding” to be better design? 眾所周知,兩個(gè)鞍座應(yīng)該一個(gè)固定 一個(gè)可移動(dòng),哪一個(gè)設(shè)計(jì)做為移動(dòng)端更好呢?
If there is no special requirements, usually we select the saddle near channel side as “fixed” and the other one near rear head as “sliding”.如果沒有特殊要求,通常我么選擇靠近前管箱側(cè)為固定端,靠近后管箱出為滑動(dòng)端 But if piping stress is not a problem, how about reverse the selection: channel side saddle sliding and the other side fixed? 但是如果管道應(yīng)力不成問(wèn)題,顛倒方向如何:前管箱側(cè)鞍座為滑動(dòng),另一側(cè)為固定?
(六)HTRI流路分析
Definition of A, B, C, E, F Stream as: A,B,C,E,F流路定義:
A-Stream: Tube-to-baffle hole leakage stream;can become rather large in narrow baffle spacing where larger TEMA clearances apply.However, it is effective thermally.This stream is usually smaller for multi-segmental baffles.If you expect a fouling layer deposit thick enough to plug the tube-to-baffle hole clearance, test your design by blocking the A stream on the Clearances panel.Specify the built-up fouling layer thickness for a “safe” design from a pressure drop standpoint.A流路:換換熱管與折流板孔漏流;采用較大的TEMA標(biāo)準(zhǔn)間隙處漏流在窄折流板間距中相當(dāng)大。然而這是對(duì)傳熱有效的。這股流體通常在經(jīng)過(guò)多段折流板后變小.如果流體結(jié)垢嚴(yán)重足以堵住折流板和換熱管孔的間隙,通過(guò)規(guī)定A 流露的間隙來(lái)檢驗(yàn)?zāi)愕脑O(shè)計(jì)。從壓降角度規(guī)定污垢層的厚度。
B-Stream: Main crossflow stream through the bundle;normally at least 60 percent of the total flow for turbulent flow and 40 percent for laminar flow.If B stream is lower than these values, examine clearances and baffle spacing carefully.Baffle spacing that is too narrow causes more flow in the A, C, and E streams, thereby decreasing heat transfer.!p)w0 z# g5 T% {!U(E$ E2 W B流路:這是橫向掠過(guò)管束的主要流路;通常至少60%的總流量為湍流和40%為層流。如果B流路低于這些值,仔細(xì)檢查間隙和折流板間距。折流板間距太窄則會(huì)增加A、C、E流路,因此減少傳熱。
C-Stream: Bundle-to-shell crossflow bypass stream;normally less than 10 percent of the total flow.Incorporate additional sealing strips to decrease flow fraction.C流路:管束和殼體間的間隙產(chǎn)生旁路;通常低于總流量的10%。
F –Stream: Tubepass partition bypass stream;generally should not exceed 10 percent of the total flow.Incorporate additional and/or larger seal rods in the F-stream pass partition to decrease flow fraction.F流路:折流板和殼體間的間隙產(chǎn)生旁路;一般不應(yīng)超過(guò)總流量的10%。在F流路加上額外的或者加大密封條可以減少一小部分F流路。
(七)今日主題;空氣冷卻器的設(shè)計(jì)
Highly recommended Technical Paper: ―Effectively Design Air-cooled Heat Exchangers‖ Mukherjee, published on CHEMICAL ENGINEERING PROCESS / FEB 1997 Page 26 to 46.強(qiáng)烈推薦這篇技術(shù)文獻(xiàn):《空氣冷卻器的有效設(shè)計(jì)》
Abstract: This primer discusses the thermal design of ACHEs and the optimization of the;thermal design, and offers guidance on selecting ACHEs for various applications.摘要:這是空氣冷卻器熱力設(shè)計(jì)的引論以及熱力設(shè)計(jì)的優(yōu)化,為各種場(chǎng)合選擇空冷器并提供指導(dǎo)。
API 661—Petroleum, petrochemical and natural gas industries—Air –Cooled heat exchangers API 661-煉油通用操作空冷式換熱器 Applications: 應(yīng)用場(chǎng)合.?
Forced and induced draft air cooled heat exchangers 強(qiáng)制對(duì)流空冷器 ?
Recirculation and shoe-box air cooled heat exchangers 3 D ?
Hydrocarbon process and steam condensers 烴類和蒸汽的冷凝 ?
Large engine radiators 大型發(fā)動(dòng)機(jī)散熱器 ?
Turbine lube oil coolers 汽輪機(jī)潤(rùn)滑油冷卻器 ?
Turbine intercoolers 渦輪冷卻器
Natural gas and vapor coolers 天然氣/蒸汽冷凝器 ?
Combustion pre-heaters 燃燒預(yù)熱器 ?
Flue gas re-heaters 煙氣加熱器 ?
Lethal service 危險(xiǎn)性工況 ?
Unique customizations Recommend Vendor: 推薦供貨商;
Hudson Products Corporation 哈德森產(chǎn)品公司
GEA Rainey? Corporation GEA雷尼公司
Jord International 約旦國(guó)際
Korea Heat Exchanger Ind.Co., Ltd.? 韓國(guó)熱交換器工業(yè)有限公司
FBM-HUDSON ITALIANA S.P.A.FBM哈德遜公司 Air Cooler Design 空冷器設(shè)計(jì) Heat Transfer Basics 傳熱基礎(chǔ)
Air cooled heat exchangers rely on thermodynamic properties of heat transfer.Specifically, heat transfer is energy released over time.Two standard formulas used to calculate heat transfer are as follows: 風(fēng)冷式換熱器傳熱依靠熱力學(xué)性質(zhì)。具體來(lái)說(shuō),傳熱是隨著時(shí)間的推移釋放能量。用兩個(gè)標(biāo)準(zhǔn)公式計(jì)算熱量。
Duty=Fluid Mass Flow * Cp * △T.負(fù)荷=流量*比熱容*△T The overall heat-transfer coefficient, U, is determined as follows: 總傳熱系數(shù)U,定義如下: 1/U=1/airside heat transfer coefficient+1/tubeside heat transfer+tubeside fouling resistance + airside fouling resistance+ tube wall resistance
1/U=1/空氣側(cè)傳熱系數(shù)+1/管程傳熱系數(shù)+管程污垢熱阻+空氣側(cè)污垢熱阻+管壁熱阻 Duty=U * Area * LMTD 負(fù)荷=U*傳熱面積*對(duì)數(shù)平均溫差 U is the inverse of sum resistance to heat transfer(defined as above)U是傳熱熱阻之和的倒數(shù)(定義如下)
Area is the cooler’s total finned heat transfer area 8 傳熱面積等于冷卻器的總翅片傳熱系數(shù)
LMTD is the Log Mean Temperature Difference, or the driving force of heat transfer 對(duì)數(shù)平均溫差就是溫差的對(duì)數(shù),或者是傳熱的推動(dòng)力
Given the above graph, recommending an absolute minimum of 10°C Delta T for most applications based on economies of scale.Of course smaller Delta T’s, such as 5°F, have been designed.Keep in mind as the ambient increases, the LMTD goes down reducing cooling ability.The optimum temperature is around 15°C-20°C more than the design ambient temperature.Flow Pattern & LMTD Effects There are three main types of flow patterns used in air cooled heat exchangers;counter-current flow, co-current flow and cross current flow.Counter-Current Flow – By far the most common in the process industry, counter-current flow cools the hottest fluid with the warmest air, and the coldest fluid with the coldest air.In other words, the process fluid enters the heat exchanger and passes through the finned tubes at the top of the bundle.These top tubes are exposed to air warmed by the lower tube rows.As the process fluid cools and passes through the lower tube rows, the air temperature is lower as it has been exposed to less and less tube rows.Co-Current Flow – This flow pattern is typically used in processes with critical pour points as it provides the highest outlet process temperature control since it has the lowest efficiency.In this pattern the ambient air cools the hottest fluid, and the hottest air attempts to cool the coldest fluid.The shaded arrows to the right illustrate this flow pattern.Cross-Current Flow – Most common in the gas compression industry, the cross-current flow pattern exposes each pass of the process fluid to the same air stream.Therefore the pass plates inside the headers are vertical, rather than horizontal, to allow the fluid to pass perpendicular to the air stream.Minimizing Air Cooler Costs:
Through understanding the customer’s needs to size and design air cooled heat exchangers use commercially available software programs, typical HTRI, B-JAC etc.These programs, while not offering a thermal guarantee, can offer an advantage to customers when trying to compare air coolers from different manufacturers.Quick selection between multiple designs: ?
Maximize tube length while maintaining
Design air cooler with a 1 to 3 ratio.For example, if your cooler is 30’ long it should typically be around 10’ wide.This helps reduce the header size, the most expensive portion of an air cooler, while still maintaining proper fan coverage.?
Minimize tube rows to increase heat transfer effectiveness of area, minimize header thickness.Typically between four to six tube rows ?
Try and maintain 1‖ tube diameters, depending on service.Even high viscosity services that appear to benefit from larger diameter tubes can typically be designed cheaper with more 1‖ diameter tubes.?
Use a counter-current flow where possible as it reduces surface and potentially minimize header plate thickness.?
Increase your allowable pressure drop.This allows more passes in the bundle reducing the cooler size.Components
An air cooled heat exchanger consists of the following components: ?
One or more bundles of heat transfer surface.?
An air-moving device, such as a fan, blower, or stack.?
Unless it is natural draft, a driver and power transmission to mechanically rotate the fan or blower.?
A plenum between the bundle or bundles and the air-moving device.?
A support structure high enough to allow air to enter beneath the ACHE at a reasonable rate.?
Optional header and fan maintenance walkways with ladders to grade.?
Optional louvers for process outlet temperature control.?
Optional recirculation ducts and chambers for protection against freezing or solidification of high pour point fluids in cold weather.?
Optional variable pitch fan hub for temperature control and power savings.Typical components of an air-cooled heat exchanger Tube Bundle
A tube bundle is an assembly of tubes, headers, side frames, and tube supports as shown in figure below.Usually the tube surface exposed to the passage of air has extended surface in the form of fins to compensate for the low heat transfer rate of air at atmospheric pressure and at a low enough velocity for reasonable fan power consumption.Typical construction of tube bundles with plug and cover plate headers The prime tube is usually round and of any metal suitable for the process, due consideration being given to corrosion, pressure, and temperature limitations.Fins are helical or plate type, and are usually of aluminum for reasons of good thermal conductivity and economy of fabrication.Steel fins are used for very high temperature applications.Fins are attached to the tubes in a number of ways:
An extrusion process in which the fins are extruded from the wall of an aluminum tube that is integrally bonded to the base tube for the full length.?
Helically wrapping a strip of aluminum to embed it in a pre-cut helical groove and then peening back the edges of the groove against the base of the fin to tightly secure it.?
Wrapping on an aluminum strip that is footed at the base as it is wrapped on the tube.Sometimes serrations are cut in the fins.This causes an interruption of the air boundary layer, which increases turbulence which in turn increases the airside heat transfer coefficient with a modest increase in the air-side pressure drop and the fan horsepower.The choice of fin types is critical.This choice is influenced by cost, operating temperatures, and the atmospheric conditions.Each type has different heat transfer and pressure drop characteristics.The extruded finned tube affords the best protection of the liner tube from atmospheric corrosion as well as consistent heat transfer from the initial installation and throughout the life of the cooler.This is the preferred tube for operating temperatures up to 600°F.The embedded fin also affords a continued predictable heat transfer and should be used for all coolers operating above 600°F and below 750°F.The wrap-on footed fin tube can be used below 250°F;however, the bond between the fin and the tube will loosen in time and the heat transfer is not predictable with certainty over the life of the cooler.It is advisable to derate the effectiveness of the wrap-on tube to allow for this probability.There are many configurations of finned tubes, but manufacturers find it economically practical to limit production to a few standard designs.Tubes are manufactured in lengths from 6 to 60 feet and in diameters ranging from 5/8 inch to 6 inches, the most common being I inch.Fins are commonly helical, 7 to 11 fins per inch, 5/16 to I inch high, and 0.010 to 0.035 inch thick.The ratio of extended to prime surface varies from 7:1 to 25:1.Bundles are rectangular and typically consist of 2 to 10 rows of finned tubes arranged on triangular pitch.Bundles may be stacked in depths of up to 30 rows to suit unusual services.The tube pitch is usually between 2 and 2.5 tube diameters.Net free area for air flow through bundles is about 50% of face area.Tubes are rolled or welded into the tube sheets of a pair of box headers.The box header consists of tube sheet, top, bottom, and end plates, and a cover plate that may be welded or bolted on.If the cover is welded on, holes must be drilled and threaded opposite each tube for maintenance of the tubes.A plug is screwed into each hole, and the cover is called the plug sheet.Bolted removable cover plates are used for improved access to headers in severe fouling services.Partitions are welded in the headers to establish the tube-side flow pattern, which generates suitable velocities in as near countercurrent flow as possible for maximum mean temperature difference.Partitions and stiffeners(partitions with flow openings)also act as structural stays.Horizontally split headers may be required to accommodate differential tube expansion in services
having high fluid temperature differences per pass.The figure below illustrates common head types.Bundles are usually arranged horizontally with the air entering below and discharging vertically.Occasionally bundles are arranged vertically with the air passing across horizontally, such as in a natural draft tower where the bundles are arranged vertically at the periphery of the tower base.Bundles can also be arranged in an “A” or “V” configuration, the principal advantage of this being a saving of plot area.The disadvantages are higher horsepower requirements for a given capacity and decreased performance when winds on exposed sides inhibit air flow.Within practical limits, the longer the tubes and the greater the number of rows, the less the heat transfer surface costs per square foot.One or more bundles of the same or differing service may be combined in one unit(bay)with one set of fans.All bundles combined in a single unit will have the same air-side static pressure loss.Consequently, combined bundles having different numbers of rows must be designed for different face velocities
(八)接下來(lái)主題:重沸器設(shè)計(jì)
“Optimize reboiler Design--Use these guidelines for best performance” ―重沸器最優(yōu)化設(shè)計(jì)--使用這些準(zhǔn)則使性能最優(yōu)化
By Edward Chen, public on HYDROCARBON PROCESS/ July 2001, page 61 to 67.―Properly Design Thermosyphon Reboilers‖ 熱虹吸重沸器的恰當(dāng)設(shè)計(jì)
By Andrew W.Sloley, published on CHEMICAL ENGINEERING PROCESS/ MARCH 1997, Page 52 to 64.)
Ed Chen publiced Fig.2 Flow chart for selecting reboilers and Table 1 Advantiges and disadvantage of Various type reboilers are very useful and helpful for reboiler design.Reboiler type 重沸器形式
*Vertical thermosyphon normally in-tube boiling;立式管程沸騰熱虹吸重沸器 *Horizontal thermosyphon normally shell-side boiling;臥式殼程沸騰熱虹吸重沸器 *Internal boiling reboilers(bathing-in type)內(nèi)置式重沸器 *Once-through natural circulation reboilers 自然循環(huán)重沸器 *Forced circulation reboilers強(qiáng)制循環(huán)重沸器 *Kettle reboilers 釜式重沸器
For a detailed horizontal or vertical thermosyphon reboiler design, if HTRI is available, HTRI can simulate this case.如果可用HTRI進(jìn)行詳盡的臥式或者水平熱虹吸再沸器設(shè)計(jì),HTRI能模擬這段過(guò)程 Key points關(guān)鍵點(diǎn)
1)Process Flow Diagram or P&ID of the process system.工藝系統(tǒng)的工藝流程圖或者P&ID圖1 2)Process Fluid boiling range / boiling components.工藝液體的沸點(diǎn)范圍/沸點(diǎn)組分 3)Fouling;污垢
4)Vaporization percentage;氣化率
5)Connecting inlet & outlet piping.進(jìn)出口管道的連接
6)Column or tower liquid head, its internals and elevation.容器或塔器的液柱壓頭,其內(nèi)部容積和高度
Kettle Reboiler Design 釜式重沸器的設(shè)計(jì)
The maximum heat flux should be 100,000 Btu/hr-ft2(recommended by HTRI).最高的熱通量為100,000 Btu/hr-ft2(HTRI推薦值)
The main effects of Kettle parameters on overall performances:在整體性能上釜式重沸器最主要的影響因素
a)Bundle geometry 管束幾何形狀 b)Overall Delta T壁面過(guò)熱度 c)Physical properties 物理性能 d)Mixture composition 混合物的組分 e)Pressure 壓力 f)Surface 表面粗糙度 g)Finned tubes(highly effective in low Delta T boiling)翅片管(在低溫差的重沸器中高效率)h)Excess(non-condensed)steam 過(guò)熱蒸汽 The typical Pool Boiling Curve: 典型的大容器沸騰曲線
HTRI B-K-1 Report Page 2-1 gave a different division as followings: Region I: Natural convection: no bubbles are produced, and heat is transferred purely by natural convection.區(qū)域I:自然對(duì)流:不產(chǎn)生氣泡,而且熱量?jī)H通過(guò)自然對(duì)流來(lái)傳遞。
Region II: Incipient Boiling: heat transfer is a combination of single-phrase convection and nuclear boiling.區(qū)域II:初始沸騰:熱傳遞由孤立氣泡結(jié)合和核態(tài)沸騰組成。
Region III: Nuclear boiling: Strong bubbling and heat transfer is a function of Delta T.區(qū)域III:核態(tài)沸騰:劇烈生成氣泡并在溫差下熱傳遞。
Region IV: Transition boiling: A transition to film boiling, and heat flux passes through a maximum and begin to decrease rapidly with increasing Delta T.Un-expecting operation region/ reboilers shall not design within this region.區(qū)域IV:過(guò)渡沸騰:像膜態(tài)沸騰轉(zhuǎn)變,熱流密度達(dá)到最大值并且隨著壁面過(guò)熱度的增加而急劇降低。重沸器不應(yīng)該在此不確定操作區(qū)域內(nèi)進(jìn)行設(shè)計(jì)。
Region V: Stable Film boiling: Above certain wall temperature, liquid can no longer stay in contact with the metal surface, and the tube becomes surrounded by a stable vapor film which reduces the heat transfer coefficient.區(qū)域V:穩(wěn)定的膜態(tài)沸騰:隨著壁溫的的升高,液體將不在停留在金屬壁面上,管子周圍充滿了降低熱傳遞效率的穩(wěn)定的蒸汽膜。
Region VI: Film boiling with increasing radiation: sometimes due to a fixed high heating medium temperature, reboilers had to design within this region.區(qū)域VI:伴隨熱輻射增加的膜態(tài)沸騰:由于一個(gè)恒定的高溫加熱介質(zhì)溫度,再沸器不得不在此區(qū)間內(nèi)設(shè)計(jì)。
(九)“降低管殼式換熱器污垢”--正確的設(shè)計(jì)能降低成本并且提高效率和開車時(shí)間。
Common Fouling mechanisms are: 常規(guī)的結(jié)垢機(jī)理為:
Particulate Fouling results from sedimentation of dust, rust, fine sand or other entrained solids.微粒狀的污垢來(lái)自粉塵、細(xì)砂或者其他帶入固體的沉積。
Precipitation Fouling is a solids deposition at the heat transfer surface from a supersaturated fluid.沉淀污垢是過(guò)飽和液體中固體沉積在傳熱面上
Chemical reaction Fouing is the breakdown and bonding of unstable compounds at the heat transfer surface.Oil sludge and polymerization are examples of chemical reaction fouling.化學(xué)反應(yīng)污垢是不穩(wěn)定的化合物在換熱面上分解和合成而形成的。油污和聚合就是個(gè)化學(xué)反應(yīng)結(jié)垢的例子。
Coking is a subset of chemical reaction fouling.It is one of the most problematic types of fouling.In the extreme, the coke deposit is a very hard layer of carbon, salts and other compounds.焦化屬于化學(xué)反應(yīng)結(jié)垢。這是積垢的最麻煩的類型之一。在極端的情況下,沉積的焦炭是由碳、鹽類以及其他化合物組成的堅(jiān)硬層。
Corrosion Fouling is the accumulation of corrosion products, such as iron oxide, on the heat transfer surface.腐蝕污垢是腐蝕產(chǎn)物的積聚物,諸如換熱面上的氧化鐵。
Biological fouling is the growth of living organisms, like algae and mussels, on the heat transfer surface.生物質(zhì)污垢是有機(jī)生物體在傳熱面上生長(zhǎng)而成,像海藻和貝類。
Fouling is services is often a combination of two or more mechanisms.Also, one mechanism may be initiator for anther mechnism.Fluids may be categorized into three groups according to their potential for fouling 污染往往是由兩個(gè)或兩個(gè)以上的機(jī)理組合成。而且,一個(gè)機(jī)理可能引發(fā)另一個(gè)機(jī)理。流體根據(jù)抗污能力可分為三類:
Nonfouling fluids do not require regular cleaning.Some examples are nonpolymerzing light hydrocarbons, steam and subcooled boiler feed water.不結(jié)垢流體不需要頻繁的清洗。如非聚合輕烴、蒸汽以及過(guò)冷的鍋爐給水。
Asymptotic fouling fluids reach a maximun constant fouling resistance after a short run time.The fluid velocity imports a shear stress at the fouling layer that removes some of the deposit.Cooling water is an example of an asymptotic fouling fluid.漸進(jìn)型污垢流體在短時(shí)間運(yùn)行時(shí)間后達(dá)到最大的恒定污垢熱阻。流體流速在污垢層形成剪切力以去除部分沉積污垢。冷卻水就是漸進(jìn)型污垢流體的一種
Linear fouling fluids have a fouling layer that is too tenacious to prevent with economic design velocities.The fouling layer thickness is a function of time, velocity, surface temperature.Crude oils and polymerizing hydrocarbons are examples of linear fouling fluids.線性型污垢流體的污垢層由于太堅(jiān)固以至于在設(shè)計(jì)流速下都能維持。這種污垢的厚度在于時(shí)間、流速、表面溫度的集合作用。原油和聚合烴類就是線性污垢流體的例子。
The problem with this approach is that the fouling resistance is not static.Fouling depends on
many factors, especially velocity, surface temperature and chemistry.Actual fouling in service can vary greatly about the mean performace predicted by static fouling factors.This is the most noticeable in exchanger performance where the fouling margin is large.Problematic serviecs, or “frequent foulers”, can reach the performance limit is a matter of days, rather than the full run cycle.Thereafter, the user must clean the exchanger or live the reduced performance.這種趨勢(shì)的問(wèn)題在于污垢熱阻不是恒定的。污垢取決于很多因素,特別是流速,表面溫度和化學(xué)成分。工作下的實(shí)際污垢和由靜態(tài)污垢因素來(lái)預(yù)測(cè)的平均值差別很大。大幅區(qū)域積垢是換熱器性能中最引人注意的地方。有問(wèn)題的工作狀態(tài)下,或者頻繁積垢的情況下,幾天之內(nèi)就能達(dá)到性能極限,不再滿負(fù)荷運(yùn)轉(zhuǎn)。之后,用戶必須得清理?yè)Q熱器或者調(diào)試來(lái)適應(yīng)降低的性能。
One approach to this problem is to further increase the margin for fouling.Unfortunately, this has diminishing returns.Use of large fouling factors can be a self-fulfilling prophecy.Large fouling factors or other safety margins result in added surface area.A design with large surface area will always have lower fluid velocity than a design with less area at the same given pressure drop.As surface area is added, velocity decreases.As velocity decrease, fouling increases.Thus, the prophecy is fulfilled.問(wèn)題會(huì)進(jìn)一步擴(kuò)大污垢范圍。這就會(huì)降低盈利。在大量積垢因素下使用會(huì)自然的發(fā)生情況。大量積垢因素或者其他安全裕度會(huì)導(dǎo)致增加表面積。在給定壓降前提下一個(gè)大表面積的設(shè)計(jì)中流速會(huì)比小面積來(lái)的小。隨著表面積的正大,流速會(huì)降低。隨著流速的降低,積垢加劇。因此預(yù)測(cè)情況必然發(fā)生。
An alternate approach is to avoid fouling altogether by designing for critical velocity, surface temperature, and/or other factors that preclude significant fouling.HTRI is leading the effort to determine these critical design parameters.Due to the complexity of fouling, it may be some time before these criteria are fully developed.However, partial results are available now for some problematic refinery applications.通過(guò)設(shè)計(jì)關(guān)鍵流速、表面溫度、以及/或者排除顯在性污垢來(lái)完全避免積垢。HTRI在確定這些關(guān)鍵性設(shè)計(jì)參數(shù)中起到指導(dǎo)的作用。由于積垢的復(fù)雜性,這些標(biāo)準(zhǔn)得到充分開發(fā)前可能需要花費(fèi)一段時(shí)間。然而,部分結(jié)果現(xiàn)已被一些存在問(wèn)題的煉油廠所應(yīng)用。
(十)HTRI 報(bào)告提取
Most Crude oils not foul excessively when: 當(dāng)大部分原油結(jié)垢不是很嚴(yán)重時(shí): Tubeside velocity above 6.6 ft/s;管程流速在6.6 ft/s以上(2 m/s)Shellside velocity above 2 ft/s;殼程流速在2 ft/s以上(0.6 m/s)
Surface temperature below 570 Degree F.表面溫度在570℉以下(298 ℃)
Hydrocarbon mixtures with: 烴類混合物
API gravity < 45;API指數(shù)小于45(國(guó)外對(duì)于相對(duì)密度的稱呼 又叫比重系數(shù))Heavy particulate matter(e.g., catalyst fines)absent;無(wú)重顆粒物質(zhì)(比如催化劑顆粒)Reasonable salt content(no desalter malfunctions).合適的含鹽量(脫鹽設(shè)備不失靈)Particularly amendable to exchangers with these fouling-induced issues: 尤其對(duì)有污垢誘導(dǎo)因素的換熱器進(jìn)行修正
short maintenance cycles;短期維護(hù)周期
Problematic thermal or hydraulic performance;傳熱或水壓性能存在問(wèn)題 Vibration.振動(dòng)
Reduced Capital Costs:降低資金成本
Must reconcile installed exchanger cost with increased pumping cost.必須對(duì)換熱器成本和增加的泵運(yùn)轉(zhuǎn)開銷進(jìn)行協(xié)調(diào)
Low-fouling design greatly increases run time, but not necessarily infinite:低結(jié)垢設(shè)計(jì)大幅增加運(yùn)轉(zhuǎn)時(shí)間,但是沒必要無(wú)限。
Evaluate need for online cleaning, parallel shells, shell bypass.需要對(duì)在線清掃,縱流殼程,殼程旁路進(jìn)行評(píng)估。
Consider impact of turndown operation, including possible pump circle, exchanger velocity if fluid bypass used for temperature control.包括如果流體旁路被用來(lái)溫度控制,則要考慮夜班操作包括合理的泵循環(huán)、換熱器流速的影響,Liquid Hydrocarbon Service recommended criteria: 液態(tài)烴場(chǎng)合推薦準(zhǔn)則: Tube side velocity is greater than 6.6 ft/s(2 m/s);管程流速大于2m/s Wall temperature is less than 570 Degree F(300 Degree C)壁溫低于300℃ B-Stream fraction > 0.65 B 流路大于65% Use single segmental baffles 用單弓形折流板
Baffle Cut 20-25% recommended 折流板切口值推薦20-25% If impingement device required: use one row of rods for 90 degree layouts;two rows of rods for staggered layouts;Do not use plates.如果需要防沖裝置:用一排90度布置的金屬棒;錯(cuò)列布置2排金屬棒;不要用板。Window velocity / crossflow velocity ratio: tubes in window baffle design lower than 2 but 1~1.5 preferred;NTIW design lower than 3 but 1.5~2 preferred.窗口流速和錯(cuò)流流速之比:窗口處折流板設(shè)計(jì)低于2,首選1~1.5;窗口不排管設(shè)計(jì)低于3,首選1.5~2.33 If both fluids within scope: add 20% excess surface;DO NOT USE FOULING FACTORS.如果在范圍內(nèi)有2種流體:額外增加20%的表面;不要用污垢因素。
:If one fluid within scope: consider fouling factor for fluid outside scope(omit fouling factor if fluid is non-fouling);multiply HTC(heat transfer coefficient)of fluid within scope by 0.83 but do not use fouling factor.如果范圍內(nèi)只有一種流體:流體外側(cè)范圍考慮污垢因素(如果沒有污垢則忽略);范圍內(nèi)流體熱傳導(dǎo)系數(shù)增加0.83但是不要使用污垢因素
就HTRI軟件的計(jì)算結(jié)果,個(gè)人的一些經(jīng)驗(yàn)吧: 1)check warning message(some you have to resolve.)2)free vibration(some certain cases you can solve vib-problem with some methods or devices.)3)check overall heat transfer rate V.S.existing heat exchangers or experiences.(I know there is a diagram with curves for usual fluid overall U.)4)Cost(check your design is economical or not.This kind of check may come to shell ID, tube count, material, baffle No.and estimate body flanges & tubesheet etc.)5)Actual pressure drop V.S.allowable(velocity, Re-Number, shear stress and so on)
6)thermal resistance(Shell / Tube / Fouling/Metal, which part is controlling? Fouling should be less than 20%.)7)Flow Fractions(A-F, B stream >40%,others less than 15% or 10%.If not, check your Clearance setting.)8)check output V.S.input(sometimes you might make a wrong input of process data, properties etc.)9)If there is phrase change, check pure componet or not.Mole fraction of noncondensables & percentage should be notified for there is a large amount of noncondensabe.For boiling, a wide temperature range boiling should differ much from narrow range.For reboilers, you need to check maxium heat flux, boling regime etc.)
第二篇:資料總結(jié) 文檔
重慶市豐都縣雙龍鎮(zhèn)政府廣場(chǎng)綠化工程
資料總結(jié)
一、工程概述:
工程名稱:重慶市豐都縣雙龍鎮(zhèn)政府廣場(chǎng)綠化工程 參見單位:
建設(shè)單位:重慶市豐都縣雙龍鎮(zhèn)政府 施工單位:重慶建洲園林藝術(shù)工程有限公司 工程地址:重慶市豐都縣雙龍鎮(zhèn) 施工面積:1500平方米
工程主要內(nèi)容:
1、甲方提供的《重慶市豐都縣雙龍鎮(zhèn)交通樞紐站綠化工程施工設(shè)計(jì)圖》中所標(biāo)注和要求的以及實(shí)現(xiàn)設(shè)計(jì)功能意圖需完成的:路沿石安裝、花臺(tái)砌體及石材飾面、以及設(shè)計(jì)變更通知單要求的內(nèi)容。2.地面:砼墊層、水泥砂漿找平,石材、地磚粘貼等工作。3.電氣安裝:配線、配管、燈具、燈桿等安裝。
二、工程資料情況:
1.本工程施工中嚴(yán)格按照國(guó)家標(biāo)準(zhǔn)《建筑工程施工質(zhì)量驗(yàn)收統(tǒng)一標(biāo)準(zhǔn)》GB50300-2001,進(jìn)場(chǎng)材料由監(jiān)理工程師和建設(shè)方現(xiàn)場(chǎng)代表共同見證取樣送檢,檢驗(yàn)合格后,才準(zhǔn)用于本工程。2.工程子分部為2個(gè):裝飾裝修、電氣安裝。
按建筑工程竣工技術(shù)文件材料要求,檔案組負(fù)責(zé)項(xiàng)目部技術(shù)文件的編號(hào)、登記、發(fā)放、保管,并負(fù)責(zé)竣工資料的收集和積累。竣工原件資料形成如下:工程質(zhì)量評(píng)定資料由項(xiàng)目技術(shù)負(fù)責(zé)人、質(zhì)檢員形成;試驗(yàn)資料由現(xiàn)場(chǎng)管理員提取試件,監(jiān)理見證取樣后按有關(guān)規(guī)定送交試驗(yàn)室進(jìn)行試驗(yàn),試驗(yàn)室根據(jù)試驗(yàn)結(jié)果形成資料,返回項(xiàng)目部原件資料。匯總表及評(píng)定表由內(nèi)業(yè)資料員、技術(shù)負(fù)責(zé)人形成;
原 材 料 質(zhì)量保證書在材料進(jìn)場(chǎng)時(shí)由廠家提供,材料員收到后及時(shí)交檔案員處存檔,內(nèi)業(yè)技術(shù)員進(jìn)行匯總及整理;施工技術(shù)交底記錄由項(xiàng)目施工員形成,交檔案員處存檔;隱蔽檢查資料、施工記錄、由施工員根據(jù)現(xiàn)場(chǎng)實(shí)際情況形成,交建設(shè)單位。
分項(xiàng)工程嚴(yán)格按檢驗(yàn)批驗(yàn)收程序,驗(yàn)收合格后,再轉(zhuǎn)入下一道工序。對(duì)影響結(jié)構(gòu)安全的關(guān)鍵部分,隱蔽工程施工員、建設(shè)單位現(xiàn)場(chǎng)代表,共同進(jìn)行了現(xiàn)場(chǎng)驗(yàn)收。本工程在收集整理檔
案的過(guò)程中,堅(jiān)持與工程進(jìn)度同步的原則,施工前完成各項(xiàng)技術(shù)交底記錄,隱檢、以及材質(zhì)證明資料的收集、整理工作等。在施工過(guò)程中,及時(shí)如實(shí)地填寫各項(xiàng)施工記錄,隱蔽驗(yàn)收記錄和檢查記錄,按照規(guī)范要求進(jìn)行了各項(xiàng)測(cè)試,并對(duì)記錄及時(shí)整理,所有記錄均簽證及時(shí),數(shù)據(jù)準(zhǔn)確、內(nèi)容真實(shí)。在進(jìn)行檔案資料收集、整理、匯總、裝訂時(shí),嚴(yán)格按照《重慶市建設(shè)工程檔案專項(xiàng)驗(yàn)收辦法》及重慶市城建檔案的有關(guān)要求進(jìn)行,做到檔案資料完整、準(zhǔn)確、真實(shí)、齊全。
本工程在建設(shè)方的大力支持下,通過(guò)本工程項(xiàng)目部精心施工,使本工程各種試件及實(shí)體檢測(cè),工程質(zhì)量完全達(dá)到了設(shè)計(jì)要求,通過(guò)對(duì)各項(xiàng)試驗(yàn)數(shù)據(jù)和檢查結(jié)果的綜合分析,我們認(rèn)為本工程結(jié)構(gòu)安全可靠,工程實(shí)體質(zhì)量檢測(cè)合格,使用功能抽樣檢測(cè)合格,各分部、分項(xiàng),檢驗(yàn)批質(zhì)量驗(yàn)收資料齊全,能夠達(dá)到設(shè)計(jì)的使用要求,達(dá)到了設(shè)計(jì)預(yù)期目的,符合國(guó)家建筑工程施工質(zhì)量驗(yàn)收合格標(biāo)準(zhǔn)。特申請(qǐng)建設(shè)單位按照基本建設(shè)程序,組織有關(guān)職能部門對(duì)本工程進(jìn)行綜合竣工驗(yàn)收。
本公司將嚴(yán)格遵守國(guó)家現(xiàn)行有關(guān)建筑法規(guī),根據(jù)國(guó)務(wù)院第279號(hào)令《建設(shè)工程工程質(zhì)量管理?xiàng)l例》有關(guān)規(guī)定作好本工程的保修工作。
整理單位:重慶建洲園林藝術(shù)工程有限公司 整理人: 年
月
日
第三篇:資料總結(jié)
資料總結(jié)三
高層建筑主體資料(附實(shí)驗(yàn)及委托單)高層建筑主體資料(附實(shí)驗(yàn)及委托單)
一、施工測(cè)量放線報(bào)驗(yàn)
1、施工測(cè)量放線報(bào)驗(yàn)單(A11)
2、多層高層各層放線測(cè)量記錄(C1204)
3、施工放線控制網(wǎng)記錄(C1202)(只做一次)
4、規(guī)劃部門的定位坐標(biāo)、高程控制摘錄(C1201)(只做一次)
5、施工放線驗(yàn)收記錄(C1203)6.放線平面圖。
7、技術(shù)復(fù)核記錄
以上資料可根據(jù)實(shí)際做。(C1201、C1202在開挖前做,根據(jù)規(guī)劃部門的定位線做)
二、土方開挖報(bào)驗(yàn)
1.土方開挖工程檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(A1001)2.工序交接檢查記錄(B1024)3.施工記錄(檢查記錄)(B1063-04)
三、地下室外墻防水報(bào)驗(yàn)
1.卷材防水層檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(A1035)涂料防水層檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(A1036)金屬板防水層檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(A1037)塑料板防水層檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(A1038)注:根據(jù)施工圖紙?jiān)O(shè)計(jì)而選用相關(guān)的表格 2.細(xì)部構(gòu)造檢驗(yàn)批質(zhì)量驗(yàn)收記錄(A1039)3.隱蔽工程驗(yàn)收記錄(B1023)4.工序交接檢查記錄(B1024)
四、土方回填報(bào)驗(yàn)
1.土方回填工程檢驗(yàn)批質(zhì)量驗(yàn)收記錄(A1002)2.土層回填現(xiàn)場(chǎng)抽樣實(shí)驗(yàn)點(diǎn)位示意圖(C1004)3.土及灰土地基(墊層)回填現(xiàn)場(chǎng)試驗(yàn)記錄(C1101)4.土方回填隱蔽驗(yàn)收記錄(B1023)
五、鋼筋報(bào)驗(yàn)
1.鋼筋加工工程檢驗(yàn)批質(zhì)量驗(yàn)收記錄(A2004)2.鋼筋安裝工程檢驗(yàn)批質(zhì)量驗(yàn)收記錄(A2005)3.工序交接檢查記錄(B1024)4.鋼筋隱蔽驗(yàn)收記錄(B1023)
六、模板安裝報(bào)驗(yàn)
1.模板安裝工程檢驗(yàn)批質(zhì)量驗(yàn)收記錄(A2001)2.現(xiàn)澆砼模板安裝、拆除施工記錄(C1214)3.工序交接檢查記錄(B1024)
七、砼澆注報(bào)審 1.砼澆注報(bào)審表
2.砼澆注申請(qǐng)表(C1210)3.附;商品砼出廠合格資料 4.混凝土原材料及配合比設(shè)計(jì)檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(A2006)注:A2006表商砼廠提供,如商砼廠不提供時(shí),按照商品砼控制資料填寫
八、砼施工報(bào)驗(yàn)
1.砼配合比及澆注施工記錄(C1212)2.砼坍落度檢查記錄(C1217)3.現(xiàn)澆砼全過(guò)程施工記錄(C1213)4.混凝土施工檢驗(yàn)批質(zhì)量驗(yàn)收記錄(A2007)防水混凝土檢驗(yàn)批質(zhì)量驗(yàn)收記錄(A1033)
注:有抗?jié)B、防水要求時(shí)用(A1033){一般在地下室時(shí)用} 5.砼試件同條件養(yǎng)護(hù)記錄(六百度日)6.冬期砼攪拌及澆灌測(cè)量記錄(C1216)7.工序交接記錄(B1024)
九、模板拆除報(bào)驗(yàn)
1.模板拆除工程檢驗(yàn)批質(zhì)量驗(yàn)收記錄(A2003)2.現(xiàn)澆砼模板安裝、拆除施工記錄(C1214)
3.現(xiàn)澆結(jié)構(gòu)外觀及尺寸偏差檢驗(yàn)批質(zhì)量驗(yàn)收記錄(A2011)。
十、填充墻報(bào)驗(yàn)
1.磚砌體工程檢驗(yàn)批質(zhì)量驗(yàn)收記錄(A2017)注:磚混樓時(shí)使用 填充墻砌體工程檢驗(yàn)批質(zhì)量驗(yàn)收記錄(A2020)
混凝土小型空心砌塊砌體工程檢驗(yàn)批質(zhì)量驗(yàn)收記錄(A2018)石砌體工程檢驗(yàn)批質(zhì)量驗(yàn)收記錄(A2019)注:用于擋土墻基礎(chǔ)、河壩等時(shí)使用
注:以上表格A2017~A2020根據(jù)施工圖紙?jiān)O(shè)計(jì)要求選用表格 2.砌體質(zhì)量控制記錄(C1227)3.構(gòu)造柱配筋砌體配筋、拉結(jié)筋施工記錄(C1228)4.隱蔽工程檢驗(yàn)記錄(B1023)十一.屋面報(bào)驗(yàn)
(1)1.水泥焦渣屋面找平層檢驗(yàn)質(zhì)量驗(yàn)收記錄表(A4002)
2.隱蔽工程驗(yàn)收記錄表(B1023)
1.憎水珍珠巖板屋面保溫層檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(A4001)2.隱蔽工程驗(yàn)收記錄表(B1023)
(2)1.卷材防水層檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(A4003)2.屋面防水工程質(zhì)量檢查施工記錄(C1232)3.屋面淋水蓄水試驗(yàn)記錄表(D1001)4.隱蔽工程驗(yàn)收記錄表(B1023)十二.裝飾裝修報(bào)驗(yàn)
1.一般抹灰工程檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(A3027)找平層檢驗(yàn)批質(zhì)量驗(yàn)收記錄(A3008)水泥混凝土面層檢驗(yàn)批質(zhì)量驗(yàn)收記錄(A3011)大理石和花崗石面層檢驗(yàn)批質(zhì)量驗(yàn)收記錄(A3017)2.隱蔽工程驗(yàn)收記錄表(B1023)
十四、廚房、、衛(wèi)生間水泥沙漿找平層報(bào)驗(yàn) 1.找平層檢驗(yàn)質(zhì)量驗(yàn)收記錄表(A3008)2.隱蔽工程驗(yàn)收記錄表(B1023)
十五、廚房、衛(wèi)生間涂膜防水層報(bào)驗(yàn) 1.涂膜防水層檢驗(yàn)質(zhì)量驗(yàn)收記錄表(A4004)
2.衛(wèi)生間、廚房、陽(yáng)臺(tái)及其它有防水要求的地面潑水、蓄水試驗(yàn)記錄(D1003)
3.隱蔽工程驗(yàn)收記錄表(B1023)
十六、廚房、衛(wèi)生間水泥沙漿防水保護(hù)層報(bào)驗(yàn) 1.找平層檢驗(yàn)質(zhì)量驗(yàn)收記錄表(A3008)2.隱蔽工程驗(yàn)收記錄表(B1023)
十七、屋面廣場(chǎng)磚粘貼
1.飾面磚粘貼工程檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(A3045)2.隱蔽工程驗(yàn)收記錄表(B1023)原材料匯總(實(shí)驗(yàn)室出報(bào)告)鋼材;鋼材出廠合格證、進(jìn)場(chǎng)抽樣復(fù)試報(bào)告匯總表(C1401)鋼材材質(zhì)證明文件
注:廠家材質(zhì)單 鋼材物物性能試驗(yàn)報(bào)告(C1402)
注:實(shí)驗(yàn)室復(fù)試報(bào)告 鋼筋焊接;鋼筋焊接性能檢驗(yàn)報(bào)告匯總表(C1423)
鋼材焊接性能檢驗(yàn)報(bào)告(C1403)
注:實(shí)驗(yàn)室復(fù)試報(bào)告 后附:焊接用料資料(包括供貨商資質(zhì)、檢驗(yàn)報(bào)告及合格證)鋼筋機(jī)械連接;鋼筋機(jī)械連接性能檢驗(yàn)報(bào)告匯總表(C1424)
鋼材機(jī)械連接性能檢驗(yàn)報(bào)告(C1402)注:實(shí)驗(yàn)室復(fù)試報(bào)告 后附:機(jī)械連接用料資料(包括供貨商資質(zhì)、檢驗(yàn)報(bào)告及合格證)水泥;水泥、外加劑、摻合料出廠合格證進(jìn)廠試驗(yàn)報(bào)告匯總表(C1405)出廠檢驗(yàn)報(bào)告3d、28d
注:粘于B1015表上 水泥安定性試驗(yàn)報(bào)告(C1407)
注:實(shí)驗(yàn)室復(fù)試報(bào)告 水泥復(fù)檢報(bào)告3d、28d(C1406)
注:實(shí)驗(yàn)室復(fù)試報(bào)告 磚、砌塊;燒結(jié)磚、多孔磚、砌塊出廠合格證復(fù)試報(bào)告匯總表(C1408)出廠資料(包括供貨商資質(zhì)、檢驗(yàn)報(bào)告及合格證)多孔磚檢驗(yàn)報(bào)告(C1409-04)
注:實(shí)驗(yàn)室復(fù)試報(bào)告 磚檢驗(yàn)報(bào)告(C1410-04)
注:實(shí)驗(yàn)室復(fù)試報(bào)告 普通砼砌塊(C1411)
注:實(shí)驗(yàn)室復(fù)試報(bào)告 燒結(jié)空心磚和空心砌塊(C1428-04)
注:實(shí)驗(yàn)室復(fù)試報(bào)告 砂子;水泥、外加劑、摻合料出廠合格證進(jìn)廠試驗(yàn)報(bào)告匯總表(C1405)砂子檢驗(yàn)報(bào)告(C1412)注:實(shí)驗(yàn)室復(fù)試報(bào)告 石子;水泥、外加劑、摻合料出廠合格證進(jìn)廠試驗(yàn)報(bào)告匯總表(C1405)石子檢驗(yàn)報(bào)告(C1413)
注:實(shí)驗(yàn)室復(fù)試報(bào)告 防水材料;防水材料出廠合格證、進(jìn)場(chǎng)復(fù)試匯總表(C1419)出廠資料(包括供貨商資質(zhì)、檢驗(yàn)報(bào)告及合格證)防水卷材試驗(yàn)報(bào)告(C1420)
注:實(shí)驗(yàn)室復(fù)試報(bào)告 防水涂料試驗(yàn)報(bào)告(C1421)
注:實(shí)驗(yàn)室復(fù)試報(bào)告 混凝土試件;(標(biāo)養(yǎng))砼試件統(tǒng)計(jì)分析評(píng)定匯總記錄(C1205)現(xiàn)場(chǎng)施工砼試件強(qiáng)度統(tǒng)計(jì)分析評(píng)定表(C1206)
標(biāo)準(zhǔn)養(yǎng)護(hù)砼試件抗壓強(qiáng)度試驗(yàn)報(bào)告數(shù)據(jù)匯總表(B1425-04)附:(標(biāo)養(yǎng))混凝土抗壓強(qiáng)度檢驗(yàn)報(bào)告(C1415)注:實(shí)驗(yàn)室復(fù)試報(bào)告 混凝土試件;(同條件)同條件養(yǎng)護(hù)砼試件抗壓強(qiáng)度試驗(yàn)報(bào)告數(shù)據(jù)匯總表(B1426-04)附:(同條件)混凝土抗壓強(qiáng)度檢驗(yàn)報(bào)告(C1415)注:實(shí)驗(yàn)室復(fù)試報(bào)告 混凝土試件;(抗?jié)B)防水砼試件抗?jié)B試件試驗(yàn)報(bào)告數(shù)據(jù)匯總表(B1427-04)附:防水混凝土抗?jié)B試驗(yàn)報(bào)告(C1416)注:實(shí)驗(yàn)室復(fù)試報(bào)告 砂漿;砂漿試件抗壓強(qiáng)度試驗(yàn)報(bào)告數(shù)據(jù)匯總表(B1425-04)附:砂漿抗壓強(qiáng)度檢驗(yàn)報(bào)告(C1418)注:實(shí)驗(yàn)室復(fù)試報(bào)告 砼、砂漿配合比報(bào)告;預(yù)拌砼、現(xiàn)場(chǎng)拌制砼配合比報(bào)告(C1414)注:實(shí)驗(yàn)室出報(bào)告 砂漿配合比試驗(yàn)報(bào)告(C1417)
注:實(shí)驗(yàn)室出報(bào)告 給排水及采暖、消防報(bào)驗(yàn)
一、雨水管道安裝
1.雨水管道及配件安裝檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(A5005)2.排水管灌水、通水試驗(yàn)記錄(C2010)3.排水管通球試驗(yàn)記錄(C2010)
二、空調(diào)冷凝水管道安裝
1.雨水管道及配件安裝檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(A5005)2.排水管灌水、通水試驗(yàn)記錄(C2010)3.排水管通球試驗(yàn)記錄(C2010)
三、排水管道安裝
1.室內(nèi)排水管道及配件安裝檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(A5004)2.管道工程隱蔽驗(yàn)收記錄表(C2009)3.排水管灌水、通水試驗(yàn)記錄(C2010)4.排水管通球試驗(yàn)記錄(C2010)
四、室內(nèi)給水系統(tǒng)安裝
1.室內(nèi)給水管道及配件安裝檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(A5001)2.管道工程隱蔽驗(yàn)收記錄(C2009)
3.管道系統(tǒng)、強(qiáng)度和嚴(yán)密性試驗(yàn)記錄表(C2002)4.管道、設(shè)備清洗(吹洗、脫脂)記錄(C2010)5.生活給水管道沖洗消毒記錄(C2013)6.管道及設(shè)備保溫檢查記錄(C2006)
五、采暖系統(tǒng)安裝報(bào)驗(yàn)申請(qǐng)表
1.室內(nèi)采暖管道及配件安裝工程檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(A5010)2.室內(nèi)采暖輔助設(shè)備及散熱器及金屬輻射板安裝工程檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(A5011)
3.管道系統(tǒng)、強(qiáng)度和嚴(yán)密性試驗(yàn)記錄表(C2002)4.管道工程隱蔽驗(yàn)收記錄(C2009)
5.管道、設(shè)備清洗(吹洗、脫脂)記錄(C2010)6.管道及設(shè)備保溫檢查記錄(C2006)
六、衛(wèi)生器具及給水配件安裝
1.衛(wèi)生器具及給水配件安裝工程檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(A5008)2.衛(wèi)生器具排水管道安裝工程檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(A5009)3.排水管灌水、通水試驗(yàn)記錄(C2010)4.衛(wèi)生器具蓄水試驗(yàn)記錄(C2011)
七、消防系統(tǒng)安裝
1.室內(nèi)給水管道及配件安裝檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(A5001)2.消防水泵結(jié)合器及消火栓安裝工程檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(A5014)3.室內(nèi)消火栓系統(tǒng)安裝檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(A5002)4.管道系統(tǒng)、強(qiáng)度和嚴(yán)密性試驗(yàn)記錄表(C2002)
5.管道焊口檢查記錄(如消防管道為焊接鋼管時(shí)用)(C2005)6.管道及設(shè)備保溫檢查記錄(C2006)
7.管道工程隱蔽驗(yàn)收記錄(只在地溝內(nèi)填)
(C2009)8.管道、設(shè)備清洗(吹洗、脫脂)記錄(C2010)9.消火栓系統(tǒng)試射試驗(yàn)記錄(C2008)
10.消防系統(tǒng)檢驗(yàn)試驗(yàn)記錄(消防驗(yàn)收時(shí)填)
(C2007)
八、隱蔽工程匯總
1.隱蔽工程驗(yàn)收記錄匯總表(B1064-04)
注:是B1064-04所有隱蔽工程資料的匯總,這張表放在所有管道隱蔽資料的最前面。
原材料報(bào)驗(yàn)
給排水、采暖及消防材料
1.工程材料/構(gòu)配件/設(shè)備報(bào)審表(A9)2.出廠資料(廠家資料或供貨商資料)
出廠資料包括(營(yíng)業(yè)執(zhí)照、稅務(wù)登記證、組織機(jī)構(gòu)代碼、CCC認(rèn)證證書等)
3.檢驗(yàn)報(bào)告及合格證
4.材料、成品、半成品、構(gòu)件、器具、設(shè)備進(jìn)廠檢查驗(yàn)收記錄(B1065-04)5.?dāng)?shù)量清單
注:以上與材料相關(guān)的資料如是復(fù)印件時(shí)必須加蓋廠家或供貨商紅章 閥門及散熱器報(bào)驗(yàn)
1.工程材料/構(gòu)配件/設(shè)備報(bào)審表(A9)2.出廠資料(廠家資料或供貨商資料)
出廠資料包括(營(yíng)業(yè)執(zhí)照、稅務(wù)登記證、組織機(jī)構(gòu)代碼、CCC認(rèn)證證書等)
3.檢驗(yàn)報(bào)告及合格證
4.材料、成品、半成品、構(gòu)件、器具、設(shè)備進(jìn)廠檢查驗(yàn)收記錄(B1065-04)5.閥門及散熱器安裝前強(qiáng)度嚴(yán)密性試驗(yàn)記錄(C2004)6.?dāng)?shù)量清單
注:以上與材料相關(guān)的資料如是復(fù)印件時(shí)必須加蓋廠家或供貨商紅章 材料匯總
1.管道材料、設(shè)備出廠合格證匯總表(C2001)
注:當(dāng)所有給排水、采暖、消防材料、構(gòu)配件、設(shè)備全部進(jìn)場(chǎng)并已報(bào)監(jiān)理后,才能匯總。電 氣 報(bào) 驗(yàn)
一、接地裝置安裝
1.接地裝置安裝檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(A6024)2.建筑電氣隱蔽工程驗(yàn)收記錄(C3024)3.接地焊接平面圖(參考圖紙接地平面圖)
二、接地電阻測(cè)試
1.接地電阻測(cè)試記錄(C3019)2.接地電阻測(cè)試平面圖
三、主體電氣報(bào)驗(yàn)(預(yù)埋電管)
一層一做 1)墻、柱預(yù)埋電管(強(qiáng)電)
1.電線導(dǎo)管,電纜導(dǎo)管和線槽敷設(shè)檢驗(yàn)批質(zhì)量驗(yàn)收記錄(A6013)2.避雷引下線和變配電室接地干線敷設(shè)檢驗(yàn)批質(zhì)量 驗(yàn)收記錄表(避雷引下線)
(A6025)3.電氣隱蔽工程驗(yàn)收記錄(C3024)2)頂板預(yù)埋電管(強(qiáng)電)1.電線導(dǎo)管,電纜導(dǎo)管和線槽敷設(shè)檢驗(yàn)批質(zhì)量驗(yàn)收記錄(A6013)2.電氣隱蔽工程驗(yàn)收記錄(C3024)3)墻、柱預(yù)埋電管(弱電)
1.電線導(dǎo)管,電纜導(dǎo)管和線槽敷設(shè)檢驗(yàn)批質(zhì)量驗(yàn)收記錄(A6013)
2.電氣隱蔽工程驗(yàn)收記錄(C3024)4)頂板預(yù)埋電管(弱電)
1.電線導(dǎo)管,電纜導(dǎo)管和線槽敷設(shè)檢驗(yàn)批質(zhì)量驗(yàn)收記錄(A6013)2.電氣隱蔽工程驗(yàn)收記錄(C3024)
四、建筑物等電位聯(lián)結(jié)報(bào)驗(yàn)
一層一做,一般部位在衛(wèi)生間 1.建筑物等電位聯(lián)結(jié)檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(A6028)2.電氣隱蔽工程驗(yàn)收記錄(C3024)
五、電線、電纜穿管報(bào)驗(yàn)
一層一做
1.電線、電纜纜穿管和線槽敷設(shè)檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(A6015)2.建筑電氣隱蔽工程驗(yàn)收記錄(C3024)3.電氣線路絕緣電阻測(cè)試記錄(C3020)
六、開關(guān)、插座、風(fēng)扇安裝
一層一做
1.開關(guān)、插座、風(fēng)扇安裝檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(A6022)2.線路插座、開關(guān)接地檢驗(yàn)記錄(C3022)
七、燈具安裝
一層一做
1.普通燈具安裝檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(A6019)2.專用燈具安裝檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(A6020)
3.疏散照明(備用照明、安全照明)電源轉(zhuǎn)換時(shí)間測(cè)試記錄(C3014)
八、電纜橋架安裝
1.電纜橋架安裝和橋架內(nèi)電纜敷設(shè)檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(A6011)2.電纜頭制作、接線和線路絕緣測(cè)試檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(A6018)3.建筑電氣隱蔽工程驗(yàn)收記錄(C3024)
九、電纜溝內(nèi)和電纜豎井內(nèi)電纜敷設(shè)
1.電纜溝內(nèi)和電纜豎井內(nèi)電纜敷設(shè)檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(A6012)2.電纜頭制作、接線和線路絕緣測(cè)試檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(A6018)3.建筑電氣隱蔽工程驗(yàn)收記錄(C3024)
十、配電柜安裝
常用A6005 1.成套配電柜、控制柜(屏、臺(tái))和動(dòng)力、照明配電箱(盤)安裝檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(Ⅲ)照明配電箱(盤)(A6005)成套配電柜、控制柜(屏、臺(tái))和動(dòng)力、照明配電箱(盤)安裝檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(Ⅰ)高壓開關(guān)柜
(A6003)成套配電柜、控制柜(屏、臺(tái))和動(dòng)力、照明配電箱(盤)安裝檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(Ⅱ)低壓成套柜(屏、臺(tái))(A6004)2.低壓成套
配
電
柜
交
接
試
驗(yàn)
記錄
(C3009)
十一、電氣系統(tǒng)運(yùn)行、測(cè)試報(bào)驗(yàn)
1.建筑物照明通電試運(yùn)行檢驗(yàn)批質(zhì)量驗(yàn)收記錄表(A6023)2.漏電保護(hù)裝置試驗(yàn)記錄(C3016)3.建筑物照明通電試運(yùn)行記錄(C3017)4.電氣設(shè)備空載(負(fù)荷)試運(yùn)行記錄(C3015)5.電氣設(shè)備單體試運(yùn)行記錄(C3012)
十二、電氣隱蔽工程匯總
1.建筑電氣隱蔽工程驗(yàn)收記錄匯總表(C3023)
注:C3023是所有電氣隱蔽工程資料的匯總,這張表放在所有電氣隱蔽資料的最前面。
材料報(bào)驗(yàn)
一般材料報(bào)驗(yàn) 1.工程材料/構(gòu)配件/設(shè)備報(bào)審表(A9)2.出廠資料(廠家資料或供貨商資料)
出廠資料包括(營(yíng)業(yè)執(zhí)照、稅務(wù)登記證、組織機(jī)構(gòu)代碼、CCC認(rèn)證證書等)3.檢驗(yàn)報(bào)告及合格證
4.電氣設(shè)備、材料每批進(jìn)場(chǎng)全數(shù)(抽樣)檢查記錄(C3002)5.數(shù)量清單
注:以上與材料相關(guān)的資料如是復(fù)印件時(shí)必須加蓋廠家或供貨商紅章 電線導(dǎo)管材料報(bào)驗(yàn)
1.工程材料/構(gòu)配件/設(shè)備報(bào)審表(A9)2.出廠資料(廠家資料或供貨商資料)
出廠資料包括(營(yíng)業(yè)執(zhí)照、稅務(wù)登記證、組織機(jī)構(gòu)代碼、CCC認(rèn)證證書等)3.檢驗(yàn)報(bào)告及合格證
4.電氣設(shè)備、材料每批進(jìn)場(chǎng)全數(shù)(抽樣)檢查記錄(C3002)5.電氣導(dǎo)管管徑、壁厚及均勻度進(jìn)場(chǎng)抽樣檢測(cè)記錄(C3006)6.數(shù)量清單
注:以上與材料相關(guān)的資料如是復(fù)印件時(shí)必須加蓋廠家或供貨商紅章 電線材料報(bào)驗(yàn)
1.工程材料/構(gòu)配件/設(shè)備報(bào)審表(A9)2.出廠資料(廠家資料或供貨商資料)
出廠資料包括(營(yíng)業(yè)執(zhí)照、稅務(wù)登記證、組織機(jī)構(gòu)代碼、CCC認(rèn)證證書等)
3.檢驗(yàn)報(bào)告及合格證
4.電氣設(shè)備、材料每批進(jìn)場(chǎng)全數(shù)(抽樣)檢查記錄(C3002)5.電線、電纜線徑和絕緣層厚度進(jìn)場(chǎng)抽樣檢測(cè)記錄(C3005)6.數(shù)量清單
注:以上與材料相關(guān)的資料如是復(fù)印件時(shí)必須加蓋廠家或供貨商紅章 開關(guān)、插座材料報(bào)驗(yàn)
1.工程材料/構(gòu)配件/設(shè)備報(bào)審表(A9)2.出廠資料(廠家資料或供貨商資料)
出廠資料包括(營(yíng)業(yè)執(zhí)照、稅務(wù)登記證、組織機(jī)構(gòu)代碼、CCC認(rèn)證證書等)
3.檢驗(yàn)報(bào)告及合格證
4.電氣設(shè)備、材料每批進(jìn)場(chǎng)全數(shù)(抽樣)檢查記錄(C3002)5.開關(guān)、插座現(xiàn)場(chǎng)抽樣檢測(cè)記錄(C3004)6.數(shù)量清單
注:以上與材料相關(guān)的資料如是復(fù)印件時(shí)必須加蓋廠家或供貨商紅章 燈具材料報(bào)驗(yàn)
1.工程材料/構(gòu)配件/設(shè)備報(bào)審表(A9)2.出廠資料(廠家資料或供貨商資料)
出廠資料包括(營(yíng)業(yè)執(zhí)照、稅務(wù)登記證、組織機(jī)構(gòu)代碼、CCC認(rèn)證證書等)
3.檢驗(yàn)報(bào)告及合格證
4.電氣設(shè)備、材料每批進(jìn)場(chǎng)全數(shù)(抽樣)檢查記錄(C3002)5.照明成套燈具現(xiàn)場(chǎng)抽樣檢測(cè)記錄(C3003)6.數(shù)量清單+0-00/-200-注:以上與材料相關(guān)的資料如是復(fù)印件時(shí)必須加蓋廠家或供貨商紅章
材料匯總
1.設(shè)備、材料進(jìn)場(chǎng)全數(shù)(抽樣)檢驗(yàn)記錄匯總表(C3001)注:當(dāng)所有電氣材料、構(gòu)配件、設(shè)備全部進(jìn)場(chǎng)并已報(bào)監(jiān)理后,才能匯總。驗(yàn)槽
C1106地基驗(yàn)槽記錄
B1027分項(xiàng)、分部(子分部)工程通過(guò)驗(yàn)收各方會(huì)簽表 B1060工程質(zhì)量責(zé)任單位地基驗(yàn)槽記錄 會(huì)議簽到表
地基與基礎(chǔ)(主體)驗(yàn)收?qǐng)?bào)驗(yàn)
自檢報(bào)驗(yàn):B1040 分項(xiàng)工程質(zhì)量驗(yàn)收記錄
B1041 分部(子分部)工程質(zhì)量驗(yàn)收記錄
B1027 分項(xiàng)、分部(子分部)工程通過(guò)驗(yàn)收各方會(huì)簽表 會(huì)議簽到表
竣工報(bào)驗(yàn)
B1006 建設(shè)工程責(zé)任主體單位名稱及主要負(fù)責(zé)人情況表 B1007 工程項(xiàng)目施工管理人員名單
B1003 建設(shè)工程主要審批文件施工許可證、中標(biāo)通知書一覽表 B1039 施工現(xiàn)場(chǎng)質(zhì)量管理檢查記錄 B1001 單位(子單位)工程概況表
B1044 單位(子單位)工程質(zhì)量竣工驗(yàn)收記錄表 B1055 竣工報(bào)告
B1045 單位(子單位)工程控制資料核查記錄
(一)續(xù)表 B1046 單位(子單位)工程安全和功能檢驗(yàn)資料核查及主要功能抽查記錄
B1047 單位(子單位)工程觀感質(zhì)量檢查記錄
質(zhì)量管理資料整編
1.單位(子單位)工程概況
B1001 2.建設(shè)工程審批文件施工許可證、中標(biāo)通知書
B1003 3.開工報(bào)告
B1004 4.建筑工程各責(zé)任主體單位及有關(guān)機(jī)構(gòu)負(fù)責(zé)人簡(jiǎn)況表
B1006 5.取樣送檢人授權(quán)書
B1012
施工組織設(shè)計(jì)報(bào)審表
B1008 6.擬送檢驗(yàn)單位報(bào)審表 B1014 7.施工現(xiàn)場(chǎng)質(zhì)量管理檢查記錄
B1039 8.可行性研究報(bào)告的批復(fù)(發(fā)展計(jì)劃局)9.初步設(shè)計(jì)的批復(fù)(發(fā)展和改革委員會(huì)文件)10.建設(shè)項(xiàng)目可行性研究報(bào)告(建筑設(shè)計(jì)室)11.住房建設(shè)規(guī)劃 12.中標(biāo)通知書
13.建設(shè)工程質(zhì)量安全監(jiān)督申報(bào)通知表 14.建設(shè)用地規(guī)劃許可證 15.建筑工程施工許可證 16.建設(shè)工程規(guī)劃許可證 17.企業(yè)法人營(yíng)業(yè)執(zhí)照 18.稅務(wù)登記證 19.組織機(jī)構(gòu)代碼證 20.安全生產(chǎn)許可證 21.總監(jiān)任命書(監(jiān)理方)
22.工程設(shè)計(jì)證書(建筑設(shè)計(jì)研究院)23.建設(shè)工程勘察合同
24.工程項(xiàng)目施工企業(yè)主要管理人員名單(附件)B1007 25.項(xiàng)目部組成人員通知書(附證件)
26.巖土勘察報(bào)告結(jié)論及建議、樁土工程試樁結(jié)論 B1009 附:巖土工程勘察報(bào)告 27.樁基、人工地基處理、人工地基
B1010
附:人工地基工程質(zhì)量檢測(cè)報(bào)告 28.人工地基檢測(cè)報(bào)告真實(shí)性聲明
人工地基質(zhì)量檢測(cè)任務(wù)委托書 29.素土、灰土擊實(shí)試驗(yàn)報(bào)告
C1422 30.儀器設(shè)備檢測(cè)中心鑒定證書 31.施工圖紙會(huì)審紀(jì)要 32.工程變更項(xiàng)目記錄表 工程資料的組卷
第一類案卷:施工質(zhì)量管理竣工驗(yàn)收資料
B1001—B1060 第二類案卷:分項(xiàng)工程檢驗(yàn)批質(zhì)量驗(yàn)收資料 第三類案卷:工程質(zhì)量控制資料
1.建筑工程施工強(qiáng)制性條文檢查記錄
C1001—C1012 2.建筑與結(jié)構(gòu)工程施工記錄
1地基處理及樁基工程
C1101—C1137 2測(cè)量放線施工試驗(yàn):主體結(jié)構(gòu)裝飾屋面工程
C1201—C1233 3建筑與結(jié)構(gòu)原材料試件試驗(yàn)
C1401—C1422 3.給排水與采暖工程施工記錄
C2001—C2021 4.建筑電氣工程施工記錄
C3001—C3025 5.通風(fēng)與空調(diào)工程施工記錄
C4001—C4023 第四類案卷:工程安全和功能抽查資料
第五類案卷:1建筑竣工圖2結(jié)構(gòu)竣工圖3給排水采暖竣工圖 4電氣竣工圖5智能工程竣工圖6通風(fēng)與空調(diào)竣工圖 第六類案卷:施工日志(單獨(dú)裝訂)
實(shí)驗(yàn)組批原則及取樣規(guī)定
一.水泥每200噸為一批,隨機(jī)抽取不少于12㎏做為試樣。(袋裝水泥)
二.1、普通燒結(jié)磚每10萬(wàn)塊為一批,隨機(jī)抽取20塊作為試樣。
2、燒結(jié)多孔磚每5萬(wàn)塊為一批,隨機(jī)抽取20塊作試樣。
3、燒結(jié)空心磚和空心砌塊,每3萬(wàn)塊為一批,隨機(jī)抽取20塊作試樣。三.熱軋帶肋鋼筋,同一廠家,同一爐號(hào),同一規(guī)格,同一進(jìn)廠時(shí)間每60噸為一批,不足60噸也按一批計(jì)。其中在任選的兩根鋼筋上切取兩根長(zhǎng)50㎝兩根長(zhǎng)30㎝。
四、鋼筋連接
1,閃光對(duì)焊,同一臺(tái)班同一焊工完成的300個(gè)同級(jí)別,同直徑鋼筋焊接接頭應(yīng)作為一批。當(dāng)同一臺(tái)班內(nèi),可在一周內(nèi)累計(jì)計(jì)算;累計(jì)仍不足300個(gè)接頭,也按一批計(jì)。力學(xué)性能試驗(yàn)時(shí),試件應(yīng)從成品中隨機(jī)切取6個(gè)試件,其中3個(gè)做拉伸試驗(yàn),3個(gè)做彎曲試驗(yàn)。2.電渣壓力焊,一般構(gòu)筑物中以300個(gè)同級(jí)別鋼筋接頭作為一驗(yàn)收批。在現(xiàn)澆鋼筋砼土多層結(jié)構(gòu)中,應(yīng)以每一樓層或施工區(qū)中300個(gè)同級(jí)別鋼筋接頭作為一驗(yàn)收批,不足300個(gè)接頭也按一批計(jì)。試件應(yīng)從成品中隨機(jī)切取3個(gè)接頭進(jìn)行拉伸試驗(yàn)。
3.套筒連接;同規(guī)格每500個(gè)接頭為一批,不足500個(gè)時(shí)按一批計(jì)。取3根接頭試件取3根母材試件各長(zhǎng)50㎝。五.砼試塊每100M3為一批不足100M3時(shí)按一批計(jì),每100M3取樣不少于一組。(同一配合比同一臺(tái)班)
六.砂漿試塊同一配合比,同一強(qiáng)度等級(jí),同一樓層每100M3取樣不少于一組。實(shí)驗(yàn)組批原則及取樣規(guī)定 一.水泥的取樣試驗(yàn);(1).水泥的取樣
1).水泥試驗(yàn)應(yīng)以同一水泥廠、同強(qiáng)度等級(jí)、同品種、同一生產(chǎn)時(shí)間、同一一進(jìn)場(chǎng)日期的水泥,散裝水泥500t、袋裝水泥200t為一驗(yàn)收批,不足噸數(shù)時(shí)按一驗(yàn)收批計(jì)算。
2).每一驗(yàn)收批取樣一組數(shù)量不少于12㎏的水泥做為試樣。3).取樣要有代表性,一般可以從20個(gè)以上的不同部位或20袋中取等量樣品,總數(shù)至少12㎏,拌合均勻后分成兩等份,一份由試驗(yàn)室按標(biāo)準(zhǔn)進(jìn)行試驗(yàn),一份密封保存?zhèn)鋸?fù)驗(yàn)用。(2).常用六種水泥的必試項(xiàng)目; 1).水泥強(qiáng)度(抗壓強(qiáng)度、抗折強(qiáng)度); 2).水泥安定性; 3).水泥初凝時(shí)間;
必要時(shí)試驗(yàn)試驗(yàn)項(xiàng)目;細(xì)度和凝結(jié)時(shí)間 二.鋼筋的取樣試驗(yàn);(1).熱軋、余熱處理和冷軋帶肋鋼筋;每批由同一廠別、同一爐罐號(hào)、同一規(guī)格、同一進(jìn)場(chǎng)時(shí)間的鋼筋組成。熱軋帶肋鋼筋,熱軋光圓鋼筋、低碳鋼熱軋圓盤余熱處理鋼筋每批數(shù)量不得大于60t,冷軋帶肋鋼筋每批數(shù)量不得大于50t。取3根50㎝、3根30㎝。
(2).同一牌號(hào)、同一規(guī)格尺寸、同一臺(tái)軋機(jī)、同一臺(tái)班,每10t為一 驗(yàn)收批,不足10t也按一批計(jì)。每一驗(yàn)收批取拉伸試件1個(gè),彎曲試 件1個(gè),重量、節(jié)距、厚度各3個(gè)。3.鋼筋取樣(鋼材的力學(xué)試驗(yàn) 是:拉伸和彎曲試驗(yàn))(3).鋼筋的必試項(xiàng)目;
1).物理必試項(xiàng)目:拉力試驗(yàn)(屈服強(qiáng)度、抗拉強(qiáng)度、伸長(zhǎng)率); 冷彎試驗(yàn)(冷拔低碳鋼絲為反復(fù)彎曲試驗(yàn))。
2).化學(xué)分析:主要分析碳(C)、硫(S)、磷(P)、錳(Mn)、硅(Si)三.磚的取樣試驗(yàn);
(1).燒結(jié)普通磚:每15萬(wàn)塊為一驗(yàn)收批,不足15萬(wàn)塊按一批計(jì)。每一驗(yàn)收批隨機(jī)抽取試樣一組(10塊)。
必試項(xiàng)目:抗壓強(qiáng)度;其他項(xiàng)目:抗風(fēng)化、泛霜、石灰爆裂、抗凍。(2).燒結(jié)多孔磚:每5萬(wàn)塊為一驗(yàn)收批,不足5萬(wàn)塊按一批計(jì)。每一驗(yàn)收批隨機(jī)抽取試樣一組(10塊)。
必試項(xiàng)目:抗壓強(qiáng)度;其他凍融、泛霜、石灰爆裂、吸水率。(3).蒸壓灰砂磚:每10萬(wàn)塊磚為一驗(yàn)收批,不足1萬(wàn)塊按一批計(jì)。每一驗(yàn)收批隨機(jī)抽取試樣一組(10塊)。
(4).燒結(jié)空心磚和空心砌塊:3萬(wàn)塊為一批,不足該數(shù)量亦按一批計(jì),按隨機(jī)抽樣法抽取20塊作強(qiáng)度試驗(yàn)。
必試項(xiàng)目:抗壓強(qiáng)度、抗折強(qiáng)度;其他項(xiàng)目:密度、抗凍。磚的主要必試項(xiàng)目:抗壓強(qiáng)度。四.砂、石的取樣試驗(yàn)
(1).砂、石試驗(yàn)的取樣方法和數(shù)量
1).砂子試驗(yàn)應(yīng)以同一產(chǎn)地,同一規(guī)格,同一進(jìn)廠時(shí)間,每400M3或600t為一驗(yàn)收批計(jì);人工生產(chǎn)或小型運(yùn)輸?shù)纳?、石產(chǎn)地和規(guī)格均相同的則以300t為一批。
2).每驗(yàn)收批取試樣一組,砂數(shù)量為22㎏,石子數(shù)量40㎏(最大粒徑為10㎜、15㎜、20㎜)或80㎏(最大粒徑30㎜、40㎜)。(2).砂、石試驗(yàn)的必試項(xiàng)目;
①.砂必試項(xiàng)目:篩分析、含泥量、泥塊含量、含水率。②.石必試項(xiàng)目:篩分析、含泥量、泥塊含量、針、片狀顆粒含量、壓碎指標(biāo)。
五.防水材料的取樣試驗(yàn)(1).防水材料的取樣方法和數(shù)量
1).石油瀝青試驗(yàn)的取樣方法和數(shù)量
①.石油瀝青同一產(chǎn)地、同一品種、同一規(guī)格標(biāo)號(hào),每20t為一驗(yàn)收批,不足20t時(shí)按一批計(jì)。②.每一驗(yàn)收批,取試樣1㎏。③.取樣方法;
在料堆上取樣時(shí),取樣部位應(yīng)均勻分布(不少于5處),每處取潔凈、等量的試樣共1㎏。2).防水卷材試驗(yàn)的取樣方法和數(shù)量 ①.以同一生產(chǎn)廠家、同一品種、標(biāo)號(hào)、等級(jí)的產(chǎn)品每1000卷內(nèi)為一驗(yàn)收批,不足1000卷者按一驗(yàn)收批計(jì)。
②.抽樣:在重量檢驗(yàn)合格的10卷中取重量最輕的、外觀、面積合格的無(wú)接頭的一卷作為物理性能試驗(yàn),若最輕的一卷不符合抽樣條件時(shí),可取次輕的一卷,但要詳細(xì)記錄。
③.將取樣的一卷卷材切除距外層卷頭2500㎜后,順縱向截取長(zhǎng)度為500㎜的全幅卷材兩塊,一塊作物理性試驗(yàn)試件,另一塊備用。(2).防水材料試驗(yàn)的必試項(xiàng)目
1).石油瀝青的必試項(xiàng)目:軟化點(diǎn)、針入度、延伸率。
2).卷材的必試項(xiàng)目:拉力試驗(yàn)、耐熱度試驗(yàn)、不透水性試驗(yàn)、柔度試驗(yàn)。
六.防水涂料的取樣試驗(yàn)
(1).同一生產(chǎn)廠家,以甲組份每5t為一檢驗(yàn)批,不足5t也按一批計(jì)算。乙組份按產(chǎn)品重量配比相應(yīng)增加。
(2).每一驗(yàn)收批按產(chǎn)品的配比分別取樣,甲、乙組份樣品總重為2㎏。(3).攪拌均勻后的樣品,分別裝入干燥的樣品容器中,樣品容器內(nèi)留有5%的空隙,密封并做好標(biāo)志。
防水涂料的試驗(yàn)項(xiàng)目:固體含量、拉伸強(qiáng)度、斷裂伸長(zhǎng)率、不透水性、低溫柔度、耐熱度(屋面用)。七.回填土(土壤擊實(shí))的取樣試驗(yàn)
回填土必須分層夯壓密度,并分層、分段取樣做干密度試驗(yàn),施工試驗(yàn)資料主要是取樣平面位置圖和回填土干密度試驗(yàn)報(bào)告。(1).取樣方法
環(huán)刀法:每段每層進(jìn)行檢驗(yàn),應(yīng)在夯實(shí)層下半部(至每層表面以下2/3處)用環(huán)刀取樣。
罐砂法:用于級(jí)配砂石回填或不宜用環(huán)刀法取樣的土質(zhì)。代表性土樣:
20㎏
熟化石灰粉:
10㎏
(2).回填土的必試項(xiàng)目;干密度、含水率。八.砌筑砂漿試塊的留置及取樣試驗(yàn)(1).試塊留置
1).(砌筑砂漿);基礎(chǔ)砌筑砂漿以同一砂漿品種、同一強(qiáng)度等級(jí)、同一配合比、同種原材料為一取樣單位,砌體超過(guò)250m3,以每250m3為一取樣單位,余者計(jì)為一取樣單位。
每一取樣單位標(biāo)準(zhǔn)養(yǎng)護(hù)試塊的留置組數(shù)不得少于1組(每組6塊),還應(yīng)制作同條件養(yǎng)護(hù)試塊、備用試塊各1組。試樣要有代表性,每組試塊(包括相對(duì)應(yīng)的同條件備用試塊)的試樣必須取自同一次拌制的砌筑砂漿拌合物。{ 試塊尺寸邊長(zhǎng)為7.07㎝為標(biāo)準(zhǔn),砂漿標(biāo)養(yǎng)試塊齡期28d要準(zhǔn),非標(biāo)養(yǎng)試養(yǎng)護(hù)要做測(cè)溫記錄 }。
2).(建筑地面用砂漿);以每一樓層或1000㎡為一檢驗(yàn)批,不足1000㎡也按一批計(jì),每批砂漿至少取樣一組,當(dāng)改變配合比時(shí)也應(yīng)相應(yīng)的留置試塊。
(2).砂漿配合比設(shè)計(jì)取量規(guī)定:
水泥 20㎏ 抗壓強(qiáng)度試驗(yàn) 砂 30㎏ 抗壓強(qiáng)度試驗(yàn) 摻合料 30㎏ 抗壓強(qiáng)度試驗(yàn)
(3).砌筑砂漿的必試項(xiàng)目:抗壓試驗(yàn)。九.混凝土試塊的留置及取樣試驗(yàn)(1).試配的申請(qǐng)
取樣:應(yīng)從現(xiàn)場(chǎng)取樣,一般水泥12㎏,砂、石各20~30㎏。(2).混凝土試件的制作、養(yǎng)護(hù)和抗壓強(qiáng)度試驗(yàn)報(bào)告
每拌制100盤且不超過(guò)100m3的同配合比的混凝土,其取樣不得少于1次(每組3個(gè)試塊)。以邊長(zhǎng)150㎜的標(biāo)準(zhǔn)尺寸的立方體試體,在標(biāo)準(zhǔn)養(yǎng)護(hù)至28d齡期時(shí)按標(biāo)準(zhǔn)試驗(yàn)方法測(cè)得的混凝土立方體抗壓強(qiáng)度。
(3).混凝土配合比設(shè)計(jì)取量規(guī)定及試驗(yàn)項(xiàng)目: 石最大粒徑 30㎜ 40㎜ 70㎜ 抗壓強(qiáng)度 塌 落 度 水泥(㎏)25 50 60 抗壓強(qiáng)度 塌 落 度 砂
(㎏)20 40 80 抗壓強(qiáng)度 塌 落 度 石
(㎏)40 80 160 抗壓強(qiáng)度 塌 落 度
(4).混凝土試塊的必試項(xiàng)目:抗壓試驗(yàn),(當(dāng)有特殊要求時(shí),還需做抗凍、抗?jié)B等試驗(yàn))。
十、鋼筋焊接的取樣試驗(yàn)(1).取樣方法;①.機(jī)械連接:每500個(gè)接頭為一批,取樣:每組3個(gè)50㎝連接,(3個(gè)50㎝原材)共6根。
②.焊接每300個(gè)接頭為批,取樣:每組3個(gè)50㎝。(2).焊接試驗(yàn)的必試項(xiàng)目: 1).點(diǎn)焊(焊接骨架和焊接網(wǎng)片)必試項(xiàng)目:抗剪試驗(yàn)、抗拉試驗(yàn)。2).閃光對(duì)焊
必試項(xiàng)目:抗拉試驗(yàn)、冷彎試驗(yàn)。3).電弧焊接頭 必試項(xiàng)目:抗拉試驗(yàn)。4).電渣壓力焊 必試項(xiàng)目:抗拉試驗(yàn)。
5).預(yù)埋件T形接頭、埋弧壓力焊 必試項(xiàng)目:抗拉試驗(yàn)。6).鋼筋氣壓焊。
必試項(xiàng)目:抗拉試驗(yàn)、冷彎試驗(yàn)。
十一、建筑密封材料的取樣試驗(yàn)(1).取樣及試驗(yàn): ①.進(jìn)場(chǎng)的改性瀝青密封材料抽樣復(fù)檢,應(yīng)符合同一規(guī)格、品種的材料就以2t為一批,不足2t者按一批進(jìn)行抽檢,每批產(chǎn)品任取3桶(袋),材料攪拌均勻后(或距袋表皮50㎜處取樣),每桶(袋)取1㎏,進(jìn)行物理性能測(cè)定。
②.進(jìn)場(chǎng)的合成高分子密封材料抽樣復(fù)檢,應(yīng)符合同一規(guī)格、品種的材料每1t為一批,不足1t者按一批進(jìn)行抽檢。
(2).建筑密封材料的必試項(xiàng)目:密度、表干時(shí)間、低溫柔性、拉伸、粘結(jié)。
十二、瑪蹄脂配合比的試驗(yàn)
(1).瑪蹄脂配合比:瀝青2㎏,填充料全部通過(guò)0.21㎜小于900孔/㎝2行篩孔1㎏。
(2).取自現(xiàn)場(chǎng)1㎏瑪蹄脂。
必試項(xiàng)目:耐熱度、柔韌性、粘結(jié)力。
一.回填土試驗(yàn):
1)回填土取樣數(shù)量 1〉環(huán)刀取樣數(shù)量
1樁基回填:抽樣柱基總數(shù)的10%,但不少于5個(gè)
2基槽和管溝回填土:每層按長(zhǎng)度20-50m取樣1組,但不少于1組 3基坑和室內(nèi)回填:每層按100-500m3取樣一組,不少于1組 4坑地平整回填:每層按400-900萌⊙1組,不少于1組(2)回填土的必試項(xiàng)目,干密度和壓實(shí)系數(shù)。
土及灰土地基(墊層)回填現(xiàn)場(chǎng)試驗(yàn)記錄 填方每層厚度15cm,使用機(jī)械,打夯機(jī) 要求壓實(shí)系數(shù)≥0.94,要求最優(yōu)含水率17.4%
二、多層房屋及各層放線測(cè)試記錄 1.平面軸線:定位或控制方法
2.層位標(biāo)高:經(jīng)緯儀引至原始點(diǎn),尺量放出軸線,由±0.000垂直控制(水準(zhǔn)儀測(cè)量,50線控制)
3.垂直中心線:鉛錘吊線,使鉛錘與原始點(diǎn)重合 4.偏差糾正處理
三、施工放線內(nèi)容:
±0.000的控制方法:水準(zhǔn)儀測(cè)量是引至固定建筑物上 軸線的控制方法:鋼卷尺測(cè)量做標(biāo)記 水準(zhǔn)儀型號(hào):DS3200
編號(hào):1226241
原材料、配件、設(shè)備實(shí)驗(yàn)委托單 1.混凝土試塊強(qiáng)度試驗(yàn)(板樣)委托試驗(yàn)項(xiàng)目:C30混凝土試塊抗壓
試樣、試件名稱:C30混凝土試塊
代表批量:48m3 工程使用部位:十層頂板梁1-29軸
送樣數(shù)量:1組
要求試驗(yàn)項(xiàng)目:①試驗(yàn)項(xiàng)目:C30混凝土試塊抗壓
②規(guī)格:150×150×150
③成型日期:
④養(yǎng)護(hù)方式:標(biāo)準(zhǔn)養(yǎng)護(hù)
水泥:P.042.5R扶風(fēng)冀東水泥有限公司
⑤累計(jì)天數(shù):28天 2.混凝土試塊強(qiáng)度試驗(yàn):(同條件)委托試驗(yàn)項(xiàng)目:C30混凝土十塊抗壓
試樣、試件名稱:C30混凝土試塊
代表批量:26m3 工程使用部位:十層頂板梁
送樣數(shù)量:1組 要求試驗(yàn)項(xiàng)目:①試驗(yàn)項(xiàng)目:C30混凝土試塊抗壓
②規(guī)格:150×150×150
③成型日期:
④養(yǎng)護(hù)方式:同條件
水泥:P.042.5R扶風(fēng)冀東水泥有限公司
⑤累計(jì)溫度:592℃
砂子:渭河中沙
石子:16~31.5㎜卵石 3.水泥強(qiáng)度調(diào)試:
委托試驗(yàn)項(xiàng)目:水泥強(qiáng)度復(fù)試
代表批量:100T 試樣、試件名稱:/
送樣數(shù)量:1組 要求試驗(yàn)項(xiàng)目:①試驗(yàn)項(xiàng)目:3天、28天強(qiáng)度復(fù)試
②水泥品種:P.C32.5R“盾石”
③
水
泥
批
號(hào)
:NC3R100
生產(chǎn)廠家:×××
④進(jìn)場(chǎng)日期:2009.9.22 4.水泥安定性試驗(yàn):
委托試驗(yàn)項(xiàng)目:水泥安定性
代表批量:50T 試樣、試件名稱:/
送樣數(shù)量:1組 要求試驗(yàn)項(xiàng)目:①試驗(yàn)項(xiàng)目:水泥安定性試驗(yàn)
②水泥品種:P.C32.5R“盾石”
③
水
泥
批
號(hào)
:NC3R100
生產(chǎn)廠家:冀東海德堡(扶風(fēng))水泥有限公司
④進(jìn)場(chǎng)日期:2009.9.22 5.水泥混合砂漿試塊抗壓強(qiáng)度試驗(yàn): 委托試驗(yàn)項(xiàng)目:M5.0水泥混合砂漿試塊抗壓強(qiáng)度
試樣、試件名稱: M5.0水泥混合砂漿
代表批量:50m3 工程使用部位:一層填充墻 要求試驗(yàn)項(xiàng)目:①砂:渭河中砂
②水泥:P.C32.5R“盾石”
扶風(fēng)冀東水泥有限公司
③白灰:松林白灰廠
④制作日期:
規(guī)格:70.7㎜×70.7㎜×70.7㎜
⑤養(yǎng)護(hù)方式:標(biāo)準(zhǔn)養(yǎng)護(hù)
養(yǎng)護(hù)時(shí)間:28天
6.骨料單項(xiàng)分項(xiàng):(代表批量:400m3)
試驗(yàn)項(xiàng)目:砂單項(xiàng)分析試驗(yàn)
砂:渭河中砂
7.骨料單項(xiàng)分析試驗(yàn):(代表批量:400m3)試樣、試件名稱:1-3卵石(渭河)試驗(yàn)項(xiàng)目:石單項(xiàng)分析試驗(yàn)
石:1-3卵石(渭河)8.磚抗壓強(qiáng)度試驗(yàn):(普通燒結(jié)磚)試樣、試件名稱:Mu10燒結(jié)普通轉(zhuǎn) 試驗(yàn)項(xiàng)目:Mu10燒結(jié)普通轉(zhuǎn)抗壓強(qiáng)度試驗(yàn) 規(guī)格品種:240㎜×115㎜×53㎜ 進(jìn)場(chǎng)日期:
×年×月×日
9.磚抗壓試塊強(qiáng)度試驗(yàn)(非承重空心磚抗壓強(qiáng)度試驗(yàn))委托試驗(yàn)項(xiàng)目:MU2.5非承重空心磚抗壓強(qiáng)度試驗(yàn)
試樣、試件名稱:Mu2.5非承重空心磚
代表批量:3萬(wàn) 試驗(yàn)項(xiàng)目:Mu2.5非承重空心磚抗壓強(qiáng)度試驗(yàn) 規(guī)格品種:240㎜×180㎜×115㎜ 進(jìn)場(chǎng)日期:
×年×月×日
10.2:8(3:
7、1:9)灰土擊實(shí)試驗(yàn)
送樣數(shù)量:一組 試樣、試件名稱:土、白灰
試驗(yàn)項(xiàng)目:2:8(3:
7、1:9)灰土擊實(shí)試驗(yàn) 白灰:地址
11.鋼材焊接性能試驗(yàn) 試驗(yàn)項(xiàng)目:鋼材焊接性能試樣
試樣、試件名稱:12 14
代表數(shù)量:各300頭 使用部位:主體3—6層
送樣數(shù)量:各一組
要求試驗(yàn)
試驗(yàn)項(xiàng)目
鋼材焊接性能 項(xiàng)目
焊接方法
雙面搭接焊
焊
接
規(guī)格
牌號(hào)
雙面搭接焊接
HRB400
14雙面搭接焊接
HRB400
焊接時(shí)間
×年×月×日
焊接證號(hào)
XXX
焊工 XXX 12.鋼材物理性能試驗(yàn) 試驗(yàn)、試件名稱:8 10 18 試驗(yàn)項(xiàng)目:鋼材物理性能試驗(yàn) 牌號(hào)
規(guī)
格
批號(hào)
批量
生產(chǎn)廠家
Q235
2586P
8T
陜西龍鋼
Q235
2396P
14T HRB400
64B498
30T 13.鋼筋抗拉試驗(yàn)
試件:鋼筋電渣壓力焊接頭
代表批量:各300頭 試驗(yàn)項(xiàng)目:鋼筋抗拉試驗(yàn)
HRB400(螺紋鋼)熱軋帶肋鋼筋 12(3組)(海鑫鋼鐵集團(tuán))
制作人:XXX
制作日期:XXX
證號(hào):61010200007309 14.M7.5混合砂漿配合比
試樣、試件名稱:水泥、砂、白灰 試驗(yàn)項(xiàng)目:M7.5混合砂漿配合比
水泥:P.O42.5R
編號(hào):NC312141 生產(chǎn)廠家:地址
砂:渭河中砂
白灰:地址 15.M10水泥砂漿配合比 試樣、試件名稱:水泥、砂、試驗(yàn)項(xiàng)目:M10水泥砂漿配合比 水泥:PC 32.5R“盾石”
砂:渭河中砂
石:渭河1-3卵石 水泥批號(hào):NC3R046
進(jìn)場(chǎng)日期:XXX 單位工程共分為九大分部
一、地基與基礎(chǔ)
1.無(wú)支護(hù)土方;①.土方開挖分項(xiàng);②.土方回填分項(xiàng); 2.地基處理;①.灰土地基分項(xiàng);②.砂和砂石地基分項(xiàng); 3.地下防水;①.防水砼分項(xiàng);②.水泥砂漿防水層分項(xiàng); ③.卷材防水層分項(xiàng)④.涂料防水層分項(xiàng);⑤.細(xì)部構(gòu)造分項(xiàng); 4.砼基礎(chǔ); ①.模板分項(xiàng);②.鋼筋分項(xiàng);③.砼分項(xiàng);④.后澆帶砼分項(xiàng);5.砌體;①.磚砌體分項(xiàng);②.砼砌塊砌體分項(xiàng);③.配筋砌體分項(xiàng)。
二、主體分部
1.砼結(jié)構(gòu);①.模板分項(xiàng);②.鋼筋分項(xiàng) ;③.現(xiàn)澆結(jié)構(gòu)分項(xiàng); 2.砌體結(jié)構(gòu);①.磚砌體分項(xiàng); ②.砼小型空心砌塊砌體分項(xiàng) ;③.填充墻砌體分項(xiàng);④.配筋磚砌體分項(xiàng)。
三、裝飾裝修
1.地面;①.水泥砼面層分項(xiàng);②.水泥砂漿面層分項(xiàng);③.水磨石面層分項(xiàng);④.磚面層分項(xiàng);⑤.大理石面層和花崗巖面層分項(xiàng); 2.抹灰;①.一般抹灰分項(xiàng);
3.門窗;①.木門窗制作與安裝分項(xiàng);②.金屬門窗安裝分項(xiàng);③.塑料門窗安裝分項(xiàng);④特種門安裝分項(xiàng);⑤.門窗玻璃安裝分項(xiàng);4.吊頂;①.暗龍骨吊頂分項(xiàng);②.明龍骨吊頂分項(xiàng);5.輕質(zhì)隔墻;①.板材隔墻分項(xiàng);
6.飾面板(磚);①.飾面板安裝分項(xiàng);②.飾面磚粘貼分項(xiàng);7.幕墻;①.玻璃幕墻分項(xiàng);②.金屬幕墻分項(xiàng);③.石材幕墻分項(xiàng);8.涂飾;①.水性涂料涂飾分項(xiàng);②.溶劑型涂料涂飾分項(xiàng);9.細(xì)部;①.門窗套制作與安裝分項(xiàng);②.護(hù)欄和扶手制作與安裝
四、建筑屋面
1.卷材防水屋面;①.保溫層分項(xiàng); ②.找平層分項(xiàng); ③.卷材防水層分項(xiàng); ④.細(xì)部構(gòu)造分項(xiàng);
2.涂膜防水屋面;①.保溫層分項(xiàng); ②.找平層分項(xiàng); ③.涂膜防水層分項(xiàng); ④.細(xì)部構(gòu)造分項(xiàng);
五、建筑給水排水及采暖
1.室內(nèi)給水系統(tǒng);①.給水管道及配件安裝分項(xiàng);②.內(nèi)室內(nèi)消火栓系統(tǒng)安裝分項(xiàng);③.給水設(shè)備安裝分項(xiàng);④.管道防腐分項(xiàng);⑤.絕熱分項(xiàng)。
2.室內(nèi)排水系統(tǒng);①.排水管道及配件安裝分項(xiàng);②.雨水管道及配件安裝分項(xiàng)。
3.室內(nèi)熱水供應(yīng)系統(tǒng);①.管道及配件安裝分項(xiàng);②.輔助設(shè)備安裝分項(xiàng);③.防腐分項(xiàng);④.絕熱分項(xiàng)。
4.衛(wèi)生器具安裝;①.衛(wèi)生器具安裝分項(xiàng);②.衛(wèi)生器具及給水配件安裝分項(xiàng);③.衛(wèi)生器具排水管道安裝分項(xiàng);
5.室內(nèi)采暖系統(tǒng);①.管道及配件安裝分項(xiàng);②.輔助設(shè)備及散熱器安裝分項(xiàng);③.系統(tǒng)水壓試驗(yàn)及調(diào)試分項(xiàng);④.防腐分項(xiàng);⑤.絕熱分項(xiàng)。6.室外給水網(wǎng)、室外排水管網(wǎng)、室外供熱管網(wǎng)、建筑中水系統(tǒng)及游泳池系統(tǒng)、供熱鍋爐及輔助設(shè)備安裝;①.給排水管道安裝分項(xiàng);②.消防水泵接合器及室外消火栓安裝分項(xiàng);③.管溝及井室分項(xiàng);④.排水管道安裝分項(xiàng);⑤.排水管溝與井池分項(xiàng);
六、建筑電氣.電氣照明安裝;
1、①.成套配電柜、控制柜(屏、臺(tái))和動(dòng)力、照明配電箱(盤)安裝分項(xiàng);②.電線、電纜導(dǎo)管和線槽敷設(shè)分項(xiàng);③.電線、電纜導(dǎo)管和線槽敷線,槽板配線分項(xiàng);④.普通燈具安裝分項(xiàng);⑤.專用燈具安裝分項(xiàng);⑥.插座、開關(guān)、風(fēng)扇安裝分項(xiàng);⑦.建筑照明通電試運(yùn)行分項(xiàng);
2.防雷及接地安裝;①.接地裝置安裝分項(xiàng);②.避雷引下線和變配電室接地干線敷設(shè)分項(xiàng);③.建筑物等電位連接分項(xiàng);④.接閃器安裝分項(xiàng)。
七、智能建筑
八、通風(fēng)與空調(diào)
送排風(fēng)系統(tǒng);①.風(fēng)管與配件制作分項(xiàng);②.部件制作分項(xiàng);③風(fēng)管系統(tǒng)安裝分項(xiàng);④.空氣處理設(shè)備安裝分項(xiàng);⑤.消聲設(shè)備制作與安裝分項(xiàng);⑥.風(fēng)管與設(shè)備防腐分項(xiàng);⑦.風(fēng)機(jī)安裝分項(xiàng);⑧.系統(tǒng)調(diào)試分項(xiàng)。
第四篇:資料總結(jié)
十九大報(bào)告中關(guān)于互聯(lián)網(wǎng)時(shí)代的內(nèi)容:
1.強(qiáng)調(diào)現(xiàn)代化經(jīng)濟(jì)體系要聯(lián)合互聯(lián)網(wǎng)時(shí)代的優(yōu)勢(shì)
深化供給側(cè)結(jié)構(gòu)性改革。建設(shè)現(xiàn)代化經(jīng)濟(jì)體系,必須把發(fā)展經(jīng)濟(jì)的著力點(diǎn)放在實(shí)體經(jīng)濟(jì)上,把提高供給體系質(zhì)量作為主攻方向,顯著增強(qiáng)我國(guó)經(jīng)濟(jì)質(zhì)量?jī)?yōu)勢(shì)。加快建設(shè)制造強(qiáng)國(guó),加快發(fā)展先進(jìn)制造業(yè),推動(dòng)互聯(lián)網(wǎng)、大數(shù)據(jù)、人工智能和實(shí)體經(jīng)濟(jì)深度融合,在中高端消費(fèi)、創(chuàng)新引領(lǐng)、綠色低碳、共享經(jīng)濟(jì)、現(xiàn)代供應(yīng)鏈、人力資本服務(wù)等領(lǐng)域培育新增長(zhǎng)點(diǎn)、形成新動(dòng)能。支持傳統(tǒng)產(chǎn)業(yè)優(yōu)化升級(jí),加快發(fā)展現(xiàn)代服務(wù)業(yè),瞄準(zhǔn)國(guó)際標(biāo)準(zhǔn)提高水平。促進(jìn)我國(guó)產(chǎn)業(yè)邁向全球價(jià)值鏈中高端,培育若干世界級(jí)先進(jìn)制造業(yè)集群。加強(qiáng)水利、鐵路、公路、水運(yùn)、航空、管道、電網(wǎng)、信息、物流等基礎(chǔ)設(shè)施網(wǎng)絡(luò)建設(shè)。堅(jiān)持去產(chǎn)能、去庫(kù)存、去杠桿、降成本、補(bǔ)短板,優(yōu)化存量資源配置,擴(kuò)大優(yōu)質(zhì)增量供給,實(shí)現(xiàn)供需動(dòng)態(tài)平衡。激發(fā)和保護(hù)企業(yè)家精神,鼓勵(lì)更多社會(huì)主體投身創(chuàng)新創(chuàng)業(yè)。建設(shè)知識(shí)型、技能型、創(chuàng)新型勞動(dòng)者大軍,弘揚(yáng)勞模精神和工匠精神,營(yíng)造勞動(dòng)光榮的社會(huì)風(fēng)尚和精益求精的敬業(yè)風(fēng)氣。加快建設(shè)創(chuàng)新型國(guó)家。創(chuàng)新是引領(lǐng)發(fā)展的第一動(dòng)力,是建設(shè)現(xiàn)代化經(jīng)濟(jì)體系的戰(zhàn)略支撐。要瞄準(zhǔn)世界科技前沿,強(qiáng)化基礎(chǔ)研究,實(shí)現(xiàn)前瞻性基礎(chǔ)研究、引領(lǐng)性原創(chuàng)成果重大突破。加強(qiáng)應(yīng)用基礎(chǔ)研究,拓展實(shí)施國(guó)家重大科技項(xiàng)目,突出關(guān)鍵共性技術(shù)、前沿引領(lǐng)技術(shù)、現(xiàn)代工程技術(shù)、顛覆性技術(shù)創(chuàng)新,為建設(shè)科技強(qiáng)國(guó)、質(zhì)量強(qiáng)國(guó)、航天強(qiáng)國(guó)、網(wǎng)絡(luò)強(qiáng)國(guó)、交通強(qiáng)國(guó)、數(shù)字中國(guó)、智慧社會(huì)提供有力支撐。加強(qiáng)國(guó)家創(chuàng)新體系建設(shè),強(qiáng)化戰(zhàn)略科技力量。深化科技體制改革,建立以企業(yè)為主體、市場(chǎng)為導(dǎo)向、產(chǎn)學(xué)研深度融合的技術(shù)創(chuàng)新體系,加強(qiáng)對(duì)中小企業(yè)創(chuàng)新的支持,促進(jìn)科技成果轉(zhuǎn)化。倡導(dǎo)創(chuàng)新文化,強(qiáng)化知識(shí)產(chǎn)權(quán)創(chuàng)造、保護(hù)、運(yùn)用。培養(yǎng)造就一大批具有國(guó)際水平的戰(zhàn)略科技人才、科技領(lǐng)軍人才、青年科技人才和高水平創(chuàng)新團(tuán)隊(duì)。
2.文化信息建設(shè)要結(jié)合互聯(lián)網(wǎng)時(shí)代的優(yōu)勢(shì)
牢牢掌握意識(shí)形態(tài)工作領(lǐng)導(dǎo)權(quán)。意識(shí)形態(tài)決定文化前進(jìn)方向和發(fā)展道路。必須推進(jìn)馬克思主義中國(guó)化時(shí)代化大眾化,建設(shè)具有強(qiáng)大凝聚力和引領(lǐng)力的社會(huì)主義意識(shí)形態(tài),使全體人民在理想信念、價(jià)值理念、道德觀念上緊緊團(tuán)結(jié)在一起。要加強(qiáng)理論武裝,推動(dòng)習(xí)近平新時(shí)代中國(guó)特色社會(huì)主義思想深入人心。深化馬克思主義理論研究和建設(shè),加快構(gòu)建中國(guó)特色哲學(xué)社會(huì)科學(xué),加強(qiáng)中國(guó)特色新型智庫(kù)建設(shè)。高度重視傳播手段建設(shè)和創(chuàng)新,提高新聞?shì)浾搨鞑チ?、引?dǎo)力、影響力、公信力。加強(qiáng)互聯(lián)網(wǎng)內(nèi)容建設(shè),建立網(wǎng)絡(luò)綜合治理體系,營(yíng)造清朗的網(wǎng)絡(luò)空間。落實(shí)意識(shí)形態(tài)工作責(zé)任制,加強(qiáng)陣地建設(shè)和管理,注意區(qū)分政治原則問(wèn)題、思想認(rèn)識(shí)問(wèn)題、學(xué)術(shù)觀點(diǎn)問(wèn)題,旗幟鮮明反對(duì)和抵制各種錯(cuò)誤觀點(diǎn)。
3.教育保障要結(jié)合互聯(lián)網(wǎng)時(shí)代的優(yōu)勢(shì)
推動(dòng)城鄉(xiāng)義務(wù)教育一體化發(fā)展,高度重視農(nóng)村義務(wù)教育,辦好學(xué)前教育、特殊教育和網(wǎng)絡(luò)教育,普及高中階段教育,努力讓每個(gè)孩子都能享有公平而有質(zhì)量的教育。完善職業(yè)教育和培訓(xùn)體系,深化產(chǎn)教融合、校企合作。加快一流大學(xué)和一流學(xué)科建設(shè),實(shí)現(xiàn)高等教育內(nèi)涵式發(fā)展。健全學(xué)生資助制度,使絕大多數(shù)城鄉(xiāng)新增勞動(dòng)力接受高中階段教育、更多接受高等教育。支持和規(guī)范社會(huì)力量興辦教育。加強(qiáng)師德師風(fēng)建設(shè),培養(yǎng)高素質(zhì)教師隊(duì)伍,倡導(dǎo)全社會(huì)尊師重教。辦好繼續(xù)教育,加快建設(shè)學(xué)習(xí)型社會(huì),大力提高國(guó)民素質(zhì)。
十九大報(bào)告關(guān)于新時(shí)代的內(nèi)容:
2017年10月18日,上午9時(shí),中國(guó)共產(chǎn)黨第十九次全國(guó)人民代表大會(huì)在北京人民大會(huì)堂開幕,隨著大會(huì)開幕,中國(guó)也正式進(jìn)入“十九大時(shí)間“。中國(guó)共產(chǎn)黨第十九次全國(guó)代表大會(huì),是在全面建成小康社會(huì)決勝階段、中國(guó)特色社會(huì)主義發(fā)展關(guān)鍵時(shí)期召開的一次十分重要的大會(huì)。
自黨的十八大以來(lái),以習(xí)近平同志為核心的黨中央帶領(lǐng)全黨,全國(guó)各族人民昂揚(yáng)奮進(jìn),砥礪前行,取得了舉世矚目的巨大成就。廣大人民群眾看在眼里,記在心里,充分感受到了偉大祖國(guó)的日新月異,觸摸到了來(lái)自內(nèi)心的滿足感。
在黨的十九大報(bào)告中指出:“經(jīng)過(guò)長(zhǎng)期努力,中國(guó)特色社會(huì)主義進(jìn)入了新時(shí)代,這是我國(guó)發(fā)展新的歷史方位?!边@一重大政治論斷,是報(bào)告的一大亮點(diǎn),貫穿報(bào)告全篇。在黨的十九大報(bào)告中首次提出了“新時(shí)代“的概念。有學(xué)者認(rèn)為,新時(shí)代是從黨的十八大開啟的,而黨的十九大確立了新時(shí)代的指導(dǎo)思想,提出了新時(shí)代黨的歷史使命,描繪了新時(shí)代的宏偉藍(lán)圖,做出了新時(shí)代的戰(zhàn)略部署,明確了新時(shí)代黨的建設(shè)的新要求。中國(guó)特色社會(huì)主義已經(jīng)進(jìn)入新時(shí)代,主要體現(xiàn)在六個(gè)方面: 一,從新起點(diǎn),新階段來(lái)看,自黨的十八大以來(lái),我們?cè)谶^(guò)去長(zhǎng)期努力的及基礎(chǔ)上,我國(guó)發(fā)展不斷取得新的重大成就,黨和國(guó)家事業(yè)發(fā)生了歷史性變革,我國(guó)發(fā)展站到了新的歷史起點(diǎn)上,中國(guó)特色社會(huì)主義進(jìn)入了新的發(fā)展階段。二,從黨的指導(dǎo)思想實(shí)現(xiàn)了新的與時(shí)俱進(jìn)來(lái)看。十八大以來(lái)我黨形成了具有鮮明特色的馬克思主義中國(guó)化最新成果—習(xí)近平新時(shí)代中國(guó)特色社會(huì)主義思想。三,我國(guó)社會(huì)的主要矛盾發(fā)生了新的變化,這是中國(guó)特色社會(huì)主義進(jìn)入新時(shí)代的一個(gè)重要標(biāo)志。四,從我國(guó)邁上全面建設(shè)社會(huì)主義現(xiàn)代化國(guó)家新征程來(lái)看,今后五年將是我們兩個(gè)百年奮斗目標(biāo)的歷史交匯期,在實(shí)現(xiàn)全指出,面建成小康社會(huì)之后,我們將為第二個(gè)百年奮斗目標(biāo)而奮斗。五,從黨的新的歷史使命來(lái)看,十九大報(bào)告明確指出在新時(shí)代我們要進(jìn)行偉大斗爭(zhēng),建設(shè)偉大工程,推進(jìn)偉大事業(yè),實(shí)現(xiàn)偉大夢(mèng)想,這凸顯了當(dāng)代中國(guó)共產(chǎn)黨人的使命和擔(dān)當(dāng)。六,從黨的建設(shè)新要求上來(lái)看,報(bào)告強(qiáng)調(diào),進(jìn)入新時(shí)代黨的建設(shè)要有新氣象,要有新作為。從黨和國(guó)家事業(yè)發(fā)展的角度來(lái)說(shuō),這里的新時(shí)代指的是中國(guó)特色社會(huì)主義進(jìn)入新時(shí)代,這也應(yīng)該是我們?nèi)绾卫斫庑聲r(shí)代的立腳點(diǎn)。
總書記指出,這個(gè)新時(shí)代,是承前啟后、繼往開來(lái)、在新的歷史條件下繼續(xù)奪取中國(guó)特色社會(huì)主義偉大勝利的時(shí)代,是決勝全面建成小康社會(huì)、進(jìn)而全面建設(shè)社會(huì)主義現(xiàn)代化強(qiáng)國(guó)的時(shí)代,是全國(guó)各族人民團(tuán)結(jié)奮斗、不斷創(chuàng)造美好生活、逐步實(shí)現(xiàn)全體人民共同富裕的時(shí)代,是全體中華兒女戮力同心、奮力實(shí)現(xiàn)中華民族偉大復(fù)興中國(guó)夢(mèng)的時(shí)代,是我國(guó)日益走近世界舞臺(tái)中央、不斷為人類作出更大貢獻(xiàn)的時(shí)代。
讀十九大報(bào)告后的小組感受:
我們作為青年學(xué)生,站在新時(shí)代的起跑線上,對(duì)于新時(shí)代中國(guó)特色社會(huì)主義更應(yīng)該有自己的感受與想法,通過(guò)學(xué)習(xí)新時(shí)代思想將有助于我們樹立牢固的思想和遠(yuǎn)大的理想。作為青年學(xué)生,我們更應(yīng)該不忘初心,堅(jiān)守理想,用青春,激情和奉獻(xiàn)共圓中國(guó)夢(mèng)。我們的初心應(yīng)該是繼承老一輩革命黨人前赴后繼奮斗的精神,在實(shí)現(xiàn)中華民族偉大復(fù)興的道路上接力前行,牢記使命,銳意進(jìn)取,做有時(shí)代擔(dān)當(dāng)?shù)暮们嗄辍?/p>
網(wǎng)絡(luò)時(shí)代對(duì)大學(xué)生的影響:
正面影響
1.網(wǎng)絡(luò)對(duì)大學(xué)生道德素質(zhì)的影響
網(wǎng)絡(luò)對(duì)大學(xué)生思想品德素質(zhì)的積極影響主要體現(xiàn)為:網(wǎng)絡(luò)已經(jīng)成為思想政治教育的重要 陣地,大學(xué)生訪問(wèn)這些網(wǎng)站,參加網(wǎng)站開展的各項(xiàng)活動(dòng),有助于增強(qiáng)愛國(guó)、愛黨意識(shí),有助 于強(qiáng)化道德主體意識(shí)與地位。
2.網(wǎng)絡(luò)對(duì)大學(xué)生智力素質(zhì)的影響:
網(wǎng)絡(luò)對(duì)大學(xué)生智力素質(zhì)的積極影響主要體現(xiàn)為:網(wǎng)絡(luò)的開放性和方便性、內(nèi)容的多樣性 和廣泛性,為大學(xué)生提供了一個(gè)廣闊的學(xué)習(xí)空間,大大拓寬了大學(xué)生的求知途徑,有助于大 學(xué)生開闊視野、促進(jìn)學(xué)業(yè);網(wǎng)絡(luò)可以為大學(xué)生提供一種自由、輕松、沒有壓力的學(xué)習(xí)環(huán)境,有助于大學(xué)生培養(yǎng)和發(fā)揮創(chuàng)新能力;網(wǎng)絡(luò)是一個(gè)廣闊空間,存在著許多新鮮和未知的事物,有助于開發(fā)大學(xué)生的潛力。
3.網(wǎng)絡(luò)對(duì)大學(xué)生社會(huì)適應(yīng)能力的積極影響主要體現(xiàn)為:
網(wǎng)絡(luò)技術(shù)的飛速發(fā)展和信息傳遞的快捷,以及人機(jī)對(duì)話的平等的新型人際關(guān)系,有助于 啟發(fā)和引導(dǎo)大學(xué)生培養(yǎng)和形成學(xué)習(xí)、效率、平等、開放等現(xiàn)代觀念;網(wǎng)絡(luò)縮短了人與人之間 的空間距離,有助于大學(xué)生擴(kuò)大交往的范圍;網(wǎng)上新型人際交往方式和社會(huì)關(guān)系的建立為大 學(xué)生在現(xiàn)實(shí)社會(huì)中進(jìn)行社會(huì)交往提供了一種緩沖的空間;網(wǎng)絡(luò)還為大學(xué)生的社會(huì)化提供了角 色的練兵場(chǎng),有助于促進(jìn)大學(xué)生的社會(huì)化。
負(fù)面影響
1.禍福相生
世間的許多事物都是利弊相生,禍福相隨,網(wǎng)絡(luò)也不例外。網(wǎng)絡(luò)就像一條大河,挾裹著 珍珠和泥沙翻騰而下,既傳播文明又傾瀉垃圾,既開啟民智又制造蒙昧盲目。就其與大學(xué)生的發(fā)展之間的關(guān)系而言,一方面網(wǎng)絡(luò)作為一種新的大眾傳播媒介、交往方式,極大地滿足了 人們信息資源共享、進(jìn)行超越時(shí)空限制的交流等需求;另一方面,網(wǎng)絡(luò)本身存在著一定缺陷,網(wǎng)絡(luò)環(huán)境往往較為復(fù)雜以及缺乏有效的管理和保護(hù)。
2.自我過(guò)濾
由于大學(xué)生的心理發(fā)育還不夠十分成熟,有的大學(xué)生對(duì)“網(wǎng)絡(luò)文化”、網(wǎng)絡(luò)環(huán)境和網(wǎng)絡(luò)交往等信息缺乏甄別過(guò)濾功能。因此,在當(dāng)前學(xué)校教育側(cè)重于學(xué)業(yè)成績(jī),部分學(xué)生跟不上學(xué)業(yè)和就業(yè)壓力比較重的情況下,網(wǎng)絡(luò)極易成為某些大學(xué)生躲避負(fù)擔(dān)和壓力的“防空洞”,使一些人沉迷其中不能自拔。因此,少數(shù)學(xué)生沉溺于網(wǎng)上娛樂(lè)而無(wú)心向?qū)W,有的學(xué)生上網(wǎng)造成道德水平下降,這在調(diào)查結(jié)果中都有顯示,在上面的舉例中已提到。對(duì)于“網(wǎng)絡(luò)世界存在的三大危害:暴力游戲、沉溺聊天、泛濫色情”的觀點(diǎn)都表示認(rèn)同,網(wǎng)戀現(xiàn)象時(shí)有發(fā)生。對(duì)互聯(lián)網(wǎng)新時(shí)代下的大學(xué)生發(fā)展的個(gè)人見解
網(wǎng)絡(luò)生活已經(jīng)成為了當(dāng)代大學(xué)日常生活不可或缺的一部分。中國(guó)新聞網(wǎng)對(duì)全國(guó)29個(gè)省份的大學(xué)生上網(wǎng)時(shí)間調(diào)查結(jié)果顯示,90%以上的大學(xué)生每天上網(wǎng)時(shí)間超過(guò)2小時(shí),更有12.2%的大學(xué)生每天上網(wǎng)時(shí)間超過(guò)8小時(shí),平均時(shí)間3.76小時(shí)。網(wǎng)絡(luò)已經(jīng)成為大學(xué)生獲取信息的重要途徑。大學(xué)生群體平均網(wǎng)齡達(dá)6.91年。大量的網(wǎng)絡(luò)信息長(zhǎng)時(shí)間地影響當(dāng)代大學(xué)生群體,對(duì)他們的價(jià)值觀有這深刻的塑造作用和強(qiáng)大的導(dǎo)向作用。
網(wǎng)絡(luò)信息豐富、自由的特點(diǎn),塑造了大學(xué)生群體多元化的價(jià)值觀。不同于傳統(tǒng)的單一價(jià)值觀,多元化價(jià)值觀不再以某種價(jià)值觀為核心的單一主導(dǎo)為特征, 而是以多元價(jià)值觀為基礎(chǔ)的兼容并包。一方面這樣的特點(diǎn)培養(yǎng)了大學(xué)生多方面思考、判斷事物的能力。另一方面,網(wǎng)絡(luò)上某些不良信息也可能使大學(xué)生樹立扭曲、不健康的價(jià)值觀。此外,與 60 后、70 后相較, 社會(huì)主義的主流價(jià)值觀受到前所未有的沖擊,網(wǎng)絡(luò)信息在其中起到了重要作用。在多元價(jià)值觀的引導(dǎo)下, 面對(duì)多元化的選擇, 大學(xué)生不免會(huì)產(chǎn)生迷惘、焦慮等心態(tài),甚至可能做出有違社會(huì)道德評(píng)判標(biāo)準(zhǔn)的行為。網(wǎng)絡(luò)對(duì)大學(xué)生價(jià)值觀的深刻影響,使它成為一條大學(xué)生價(jià)值觀教育的新路徑。與大學(xué)生密切的聯(lián)系也使得這種路徑有著獨(dú)特的優(yōu)越性。
當(dāng)前,網(wǎng)絡(luò)已滲透到高校教學(xué)、科研和學(xué)生生活、活動(dòng)的各個(gè)方面,充分利用網(wǎng)絡(luò)對(duì)大學(xué)生進(jìn)行價(jià)值觀教育不僅成為可能,而且已經(jīng)成為現(xiàn)實(shí)。通過(guò)網(wǎng)絡(luò)豐富價(jià)值觀教育的內(nèi)容, 利用多樣化的載體創(chuàng)造多元的教育方式。使事與理、情與法、形與聲、形與神等有機(jī)地交融在一起,以豐富多彩、生動(dòng)活潑的形式給大學(xué)生造成鮮明清晰的視覺印象。
網(wǎng)絡(luò)特有的信息共享性、即時(shí)性,能迅速吸引大學(xué)生注意力,這是以往的教育內(nèi)容和形式都無(wú)法比擬的。在網(wǎng)絡(luò)上,既可方便地獲取校內(nèi)校外、國(guó)內(nèi)國(guó)外、上至天文下至地理的各種信息,又可與外界自由地交流思想,無(wú)疑能極大地激發(fā)學(xué)生求知欲望和想象力。虛擬化的環(huán)境弱化了身份、地位等信息,平等性交流成為可能, 為有針對(duì)性開展價(jià)值觀引導(dǎo)工作創(chuàng)造良好的心理溝通 “ 場(chǎng)”。網(wǎng)絡(luò)提升了大學(xué)生的心理效用,大學(xué)生有許多利益訴求, 現(xiàn)實(shí)中無(wú)法被采納, 通過(guò)網(wǎng)絡(luò)論壇、網(wǎng)絡(luò)投票等方式積極參與到政治觀點(diǎn)與訴求的表達(dá)中來(lái), 從心理上得到被重視的效能體驗(yàn)。在這個(gè)過(guò)程中強(qiáng)化了價(jià)值觀教育中受眾大學(xué)生的代入感與認(rèn)同感。
網(wǎng)絡(luò)克服了單一的感官感知的教育方祛,最大限度地調(diào)動(dòng)學(xué)生獲取信息的主動(dòng)性、自由性和參與性,使教育形態(tài)從平面性走上立體化,從靜態(tài)變?yōu)閯?dòng)態(tài),從被動(dòng)變?yōu)榛?dòng),使學(xué)生成為真正意義上的價(jià)值觀教育主體。豐富了對(duì)大學(xué)生價(jià)值觀教育的內(nèi)容?;?dòng)性促使學(xué)生不再是被動(dòng)的接受者, 而成為不再受權(quán)威與規(guī)則限制主體。豐富的資源與開放性的溝通拓展學(xué)生視野, 通過(guò)搜索引擎能查閱到任意知識(shí)點(diǎn), 擺脫對(duì)權(quán)威的崇拜, 不斷獵奇激發(fā)完善知識(shí)結(jié)構(gòu)的求知欲, 進(jìn)而激發(fā)創(chuàng)造性思維。網(wǎng)絡(luò)技術(shù)的進(jìn)步進(jìn)一步加大了思想政治工作的空間和渠道,但同時(shí)也帶來(lái)了很多負(fù)面的影響。適應(yīng)網(wǎng)絡(luò)環(huán)境發(fā)展帶來(lái)的新變化,高校教育工作者必須變革傳統(tǒng)的教育理念、教育內(nèi)容、教育方式等,使價(jià)值觀教育既要符合社會(huì)發(fā)展目的與個(gè)體發(fā)展目的,也要契合網(wǎng)絡(luò)傳播規(guī)律、個(gè)體成長(zhǎng)規(guī)律與教育的普遍規(guī)律,實(shí)現(xiàn)合目的性與合規(guī)律性的有機(jī)統(tǒng)一?!?/p>
價(jià)值觀具有明顯的目的性,目的性體現(xiàn)著人的主體地位,這是因?yàn)槿耸怯幸庾R(shí)、有選擇、有目的的人,人通過(guò)意識(shí)理解價(jià)值,并在理解的基礎(chǔ)上進(jìn)行選擇,在選擇的過(guò)程中形成目的。大學(xué)生價(jià)值觀教育的目標(biāo)只有既代表社會(huì)發(fā)展的正確方向,又代表個(gè)體發(fā)展的正確方向的目標(biāo),才是合目的性的。在我國(guó),大學(xué)生社會(huì)主義價(jià)值觀培育是黨的意識(shí)形態(tài)工作的重要組成部分,具有鮮明的意識(shí)形態(tài)屬性。作為青年中最富有創(chuàng)造精神和超越意識(shí)的大學(xué)生群體,只有確立以馬克思主義指導(dǎo)思想為靈魂、以中國(guó)特色社會(huì)主義共同理想為主題、以民族精神和時(shí)代精神為精髓、以社會(huì)主義榮辱觀為基礎(chǔ)的核心價(jià)值觀,才能最終成為中國(guó)特色社會(huì)主義事業(yè)的合格建設(shè)者和可靠接班人。
但另一方面,人是價(jià)值觀的主體。對(duì)大學(xué)生進(jìn)行價(jià)值觀教育必須關(guān)注他們個(gè)體生命的發(fā)展,關(guān)注他們的正當(dāng)利益。列寧說(shuō):“沒有人的情感,就從來(lái)沒有也不可能有人對(duì)真理的追求。”所以,當(dāng)今對(duì)大學(xué)生的價(jià)值觀教育必須關(guān)注存在于他們個(gè)體的生命世界,進(jìn)而促進(jìn)人格的完滿發(fā)展。總之,當(dāng)今的大學(xué)生價(jià)值觀教育既要與社會(huì)發(fā)展的正確方向相一致,又與青年學(xué)生個(gè)體發(fā)展的正確方向相一致,才會(huì)贏得青年學(xué)生的普遍認(rèn)可,受到青年學(xué)生的普遍歡迎,才能在實(shí)施過(guò)程中落到實(shí)處,見到實(shí)效。
通過(guò)網(wǎng)絡(luò)信息傳播正確的價(jià)值觀,黨和國(guó)家已經(jīng)認(rèn)識(shí)到其重要性,并且已經(jīng)通過(guò)有力的宣傳手段,收到了良好的效果。近年來(lái),中國(guó)特色社會(huì)主義和中國(guó)夢(mèng)深入人心,社會(huì)主義核心價(jià)值觀和中華優(yōu)秀傳統(tǒng)文化廣泛弘揚(yáng)。主旋律更加響亮,正能量更加強(qiáng)勁。這與不斷完善互聯(lián)網(wǎng)建設(shè)與管理有著密不可分的關(guān)系。
黨的十九大明確指出:“培育和踐行社會(huì)主義核心價(jià)值觀。社會(huì)主義核心價(jià)值觀是當(dāng)代中國(guó)精神的集中體現(xiàn),凝結(jié)著全體人民共同的價(jià)值追求。要以培養(yǎng)擔(dān)當(dāng)民族復(fù)興大任的時(shí)代新人為著眼點(diǎn),強(qiáng)化教育引導(dǎo)、實(shí)踐養(yǎng)成、制度保障,發(fā)揮社會(huì)主義核心價(jià)值觀對(duì)國(guó)民教育、精神文明創(chuàng)建、精神文化產(chǎn)品創(chuàng)作生產(chǎn)傳播的引領(lǐng)作用,把社會(huì)主義核心價(jià)值觀融入社會(huì)發(fā)展各方面,轉(zhuǎn)化為人們的情感認(rèn)同和行為習(xí)慣?!?/p>
“加強(qiáng)互聯(lián)網(wǎng)內(nèi)容建設(shè),建立網(wǎng)絡(luò)綜合治理體系,營(yíng)造清朗的網(wǎng)絡(luò)空間?!庇行У貎艋W(wǎng)絡(luò)信息,發(fā)揚(yáng)網(wǎng)絡(luò)價(jià)值觀教育的長(zhǎng)處,彌補(bǔ)其不足,為大學(xué)生正確價(jià)值觀培養(yǎng)提供一片凈土。
對(duì)互聯(lián)網(wǎng)新時(shí)代下的大學(xué)生的倡議
習(xí)近平同志在黨的十九大報(bào)告中多次提到有關(guān)互聯(lián)網(wǎng)的內(nèi)容,在總結(jié)過(guò)去五年來(lái)互聯(lián)網(wǎng)發(fā)展成果的同時(shí)也對(duì)今后互聯(lián)網(wǎng)的發(fā)展做出了重要戰(zhàn)略部署,為加快推進(jìn)互聯(lián)網(wǎng)建設(shè)與應(yīng)用指明了目標(biāo)與方向?;ヂ?lián)網(wǎng)是如今人們社會(huì)交流的主要方式之一,嚴(yán)守網(wǎng)絡(luò)陣地至關(guān)重要。在互聯(lián)網(wǎng)治理方面,習(xí)近平同志強(qiáng)調(diào),“要加強(qiáng)互聯(lián)網(wǎng)內(nèi)容建設(shè),建立綜合治理體系,營(yíng)造良好的網(wǎng)絡(luò)空間?!弊鳛閮|萬(wàn)民眾共同的精神家園,網(wǎng)絡(luò)空間天朗氣清、生態(tài)良好,才符合人民利益。網(wǎng)絡(luò)空間治理體系是國(guó)家綜合治理體系的重要組成部分,面臨當(dāng)前迅速變化的國(guó)內(nèi)外形勢(shì),我們要在黨的統(tǒng)一領(lǐng)導(dǎo)下,綜合運(yùn)用習(xí)近平新時(shí)代中國(guó)特色社會(huì)主義思想,團(tuán)結(jié)全社會(huì)力量,正確把握網(wǎng)絡(luò)傳播規(guī)律,加強(qiáng)網(wǎng)絡(luò)內(nèi)容建設(shè)。同時(shí)牢固樹立陣地意識(shí),強(qiáng)化網(wǎng)絡(luò)輿論監(jiān)管,嚴(yán)守網(wǎng)絡(luò)意識(shí)形態(tài)紅線,營(yíng)造安全清朗的網(wǎng)絡(luò)空間。
如今,人們的學(xué)習(xí)生活工作越來(lái)越離不開互聯(lián)網(wǎng),互聯(lián)網(wǎng)成為了人們獲取公共服務(wù)的新平臺(tái),也成為了社會(huì)輿論的主要聚集地。我們作為大學(xué)生,要合理利用互聯(lián)網(wǎng)獲取自己所需要的信息,增強(qiáng)對(duì)于網(wǎng)絡(luò)信息的判斷力和鑒別力,避免遭受網(wǎng)絡(luò)上的不良影響。作為社會(huì)主義事業(yè)接班人的當(dāng)代青年,面對(duì)多樣化的挑戰(zhàn),更要堅(jiān)持馬克思主義的指導(dǎo)地位,牢固樹立中國(guó)特色社會(huì)主義共同理想和共產(chǎn)主義遠(yuǎn)大理想,堅(jiān)定對(duì)馬克思主義的信仰,堅(jiān)定對(duì)社會(huì)主義的信念。只有用先進(jìn)的科學(xué)理論武裝自己的頭腦,才能正確認(rèn)識(shí)國(guó)家的發(fā)展前途和命運(yùn),正確處理個(gè)人,集體,國(guó)家三者的利益關(guān)系,自覺識(shí)別和抵制享樂(lè)主義,實(shí)用主義,利己主義等一些錯(cuò)誤的人生觀,價(jià)值觀,道德觀的侵襲。在復(fù)雜的社會(huì)道德生活中,分清良莠,成為時(shí)代先進(jìn)道德的積極倡導(dǎo)者,從而在網(wǎng)絡(luò)社會(huì)中占據(jù)主體地位,成為網(wǎng)絡(luò)社會(huì)中的主人。
第五篇:總結(jié)資料
2013年述職報(bào)告
各位領(lǐng)導(dǎo)、同志們大家好:
轉(zhuǎn)眼間,2013年已經(jīng)過(guò)去,我們滿懷堅(jiān)定的信心,迎來(lái)了最具挑戰(zhàn)的2014年,對(duì)于我來(lái)說(shuō)2013年是學(xué)習(xí)的一年,是耕耘的一年也是收獲的一年。作為銅川攪拌站站主管全面工作的副站長(zhǎng),我將半年來(lái)的工作及崗位職責(zé)完成情況述職如下:
一、安全及生產(chǎn)方面:我與本年6月調(diào)入陜煤化建設(shè)商砼分公司銅川攪拌站,本站于7月份正式投入生產(chǎn),在公司領(lǐng)導(dǎo)及全體員工的共同努力下,本年安全生產(chǎn)商品混凝土1.2萬(wàn)立方,完成生產(chǎn)產(chǎn)值403萬(wàn)元,6月銅川攪拌站剛剛建成,到任后結(jié)合以前長(zhǎng)期在項(xiàng)目部工作的經(jīng)驗(yàn),先從制定制度尋找現(xiàn)場(chǎng)隱患,排除隱患開始做起,機(jī)械設(shè)備做到一機(jī)一閘一漏電,接零、接地完好。進(jìn)出場(chǎng)大門是車輛運(yùn)輸?shù)陌踩婪吨攸c(diǎn),著重設(shè)置了安全警示牌、反視鏡,加強(qiáng)車輛安全。設(shè)備基坑周邊全部做好安全防護(hù)。在新的工作挑戰(zhàn)面前認(rèn)真學(xué)習(xí)新的專業(yè)知識(shí),從理論知識(shí)的學(xué)習(xí)開始,堅(jiān)持理論指導(dǎo)實(shí)際,制定了“銅川攪拌站管理制度匯編”其中包含安全、生產(chǎn)管理制度十五篇,制定了各崗位工作流程;然后從操作樓、泵車、攪拌車維修班各操作人員的安全、生產(chǎn)教育入手,按制度規(guī)定定期召開安全周例會(huì)及班前會(huì),規(guī)范安全技術(shù)交底。在近半年的工作里,切實(shí)落實(shí)各項(xiàng)安全文明生產(chǎn)措施。積極響應(yīng)集團(tuán)公司、商砼公司的安全生產(chǎn)號(hào)召,組織開展了 “安全月”活動(dòng)、“百日安全無(wú)事故”活動(dòng)、“安全生產(chǎn)70天”活動(dòng)。有效防范了各類安全生產(chǎn)事故的萌發(fā),杜絕了人身安全事故的發(fā)生。
工作始終兢兢業(yè)業(yè)、腳踏實(shí)地以安全文明生產(chǎn)管理的主人翁和責(zé)任人的精神狀態(tài),克服各種困難和壓力順利完成公司下發(fā)的各項(xiàng)任務(wù)和指標(biāo),保證銅川攪拌站車輛及機(jī)械設(shè)備安全經(jīng)濟(jì)運(yùn)行,半年來(lái)安全、生產(chǎn)情況良好。
由于本站是新建站有新人多,人手少的困難,但經(jīng)過(guò)全體員工的努力,較好的完成了全年的生產(chǎn)任務(wù)。由于我們的行業(yè)特性,工作時(shí)間的不穩(wěn)定,并且持續(xù)時(shí)間較長(zhǎng),各崗位剛來(lái)的時(shí)侯都難以適應(yīng),工作壓力比較大,但他們都能盡快去適應(yīng),盡力做好本職工作,雖然也有工地投訴,但都能及時(shí)的想辦法補(bǔ)救吸取經(jīng)驗(yàn)教訓(xùn),在以后的工作中加以改進(jìn)。調(diào)度室是公司生產(chǎn)控制中心環(huán)節(jié),起著對(duì)內(nèi)對(duì)外進(jìn)行聯(lián)系紐帶作用,由于都是新人,缺乏經(jīng)驗(yàn)不能與施工單位及人員進(jìn)行良好的溝通,有時(shí)還存在不到位的情況,因此我經(jīng)常教育大家要加強(qiáng)職業(yè)道德學(xué)習(xí),提高業(yè)務(wù)水平,合理安排工地及生產(chǎn)任務(wù),提高服務(wù)質(zhì)量。操作員是生產(chǎn)的一個(gè)重要環(huán)節(jié),在過(guò)去的半年里都能認(rèn)真操作,認(rèn)真細(xì)致的輸入配方,基本沒有出現(xiàn)打錯(cuò)料的情況,杜絕了不合格產(chǎn)品的出現(xiàn),不足之處在于在打料過(guò)程中有時(shí)會(huì)出現(xiàn)水灰比掌握不好的情況,經(jīng)過(guò)學(xué)習(xí)和會(huì)議等方式都能吸取經(jīng)驗(yàn)教訓(xùn),加強(qiáng)責(zé)任心;對(duì)車輛車管部20xx年緊密圍繞公司中心任務(wù),認(rèn)真落實(shí)部門工作職責(zé)和目標(biāo),團(tuán)結(jié)拼搏、求真務(wù)實(shí)、開拓創(chuàng)新,較好地完成了各項(xiàng)工作任務(wù)。重點(diǎn)做好了以下幾方面的工作:
1、按公司要求每月中下旬召集司機(jī)開會(huì)學(xué)習(xí)傳達(dá)公司有關(guān)政策和一些新的要求。
2、對(duì)個(gè)別司機(jī)在工作期間表現(xiàn)較差的,如經(jīng)常上班不請(qǐng)假不打招呼擅自離開公司的人員都堅(jiān)決給予處分。
3、加強(qiáng)對(duì)車輛用油及配件輪胎購(gòu)進(jìn)的跟蹤,保證車輛用油及車輛配件的及時(shí)購(gòu)進(jìn),也保證了公司生產(chǎn)運(yùn)輸?shù)男枰?/p>
4、每天堅(jiān)持對(duì)砼攪拌車的車容、車貌、衛(wèi)生等情況進(jìn)行檢查,對(duì)于車輛保養(yǎng)做得差的司機(jī)都給予通報(bào)批評(píng)和處罰。
5、根據(jù)司機(jī)缺員情況協(xié)作行政事務(wù)部做好司機(jī)人員補(bǔ)充招聘工作,年內(nèi)有5人自動(dòng)辭職,招聘X人經(jīng)過(guò)考核后現(xiàn)以準(zhǔn)上車。
6、為保證車輛的正常運(yùn)行,對(duì)季度審、年審已到期的車輛都能做到及時(shí)辦理年審手續(xù),處理違章違規(guī)的車輛及駕駛員XX次,處理事故現(xiàn)場(chǎng)和需要保險(xiǎn)公司處理賠付的X次。
7、公司維修工,維修車輛每月達(dá)XXX次,外出搶修車輛約XX次。車輛正常出車率達(dá)到XXX以上,保障公司生產(chǎn)任務(wù)的完成,到施工現(xiàn)場(chǎng)巡查及上路達(dá)XX次以上,全年評(píng)估新工地勘察現(xiàn)場(chǎng)及施工情況達(dá)XX多個(gè)工地。
展望20xx年的工作計(jì)劃工作重點(diǎn)還是從車輛的行車安全上著手,結(jié)合跟司機(jī)簽訂的安全承諾書,緊緊圍繞安全行車這個(gè)主題抓好其他各項(xiàng)工作,做好以安全促效益,效益促發(fā)展,主要做到以下幾點(diǎn):
1、以人為本,從管人、管車入手,吸取經(jīng)驗(yàn)教訓(xùn),避免行車事故發(fā)生,確保行車安全。
2、嚴(yán)格執(zhí)行各種安全規(guī)章制度,對(duì)車輛進(jìn)行安全管理,只有以制度管人,才能使管理工作得以順利開展。
3、繼續(xù)搞好車輛管理工作,管好每個(gè)環(huán)節(jié),降耗增效,開源節(jié)流,使車輛管
理工作上一個(gè)新臺(tái)階。
4、嚴(yán)格把好公司考核關(guān),確保司機(jī)隊(duì)伍的整體素質(zhì)得以提高。
5、加大管理力度,勤上路和到工地檢查,及時(shí)發(fā)現(xiàn)安全隱患,以便和有關(guān)單位及公司有關(guān)部門的溝通,完善應(yīng)有的安全措施,清除隱患,以確保安全作業(yè)和運(yùn)輸?shù)陌踩?,保證按時(shí)完成生產(chǎn)運(yùn)輸任務(wù)。
三、市場(chǎng)部的全體業(yè)務(wù)人員,在部門領(lǐng)導(dǎo)的帶領(lǐng)下,客服金融風(fēng)暴給各行各業(yè)都帶來(lái)的極大打擊,他們堅(jiān)定信心,同心協(xié)力,根據(jù)客戶類型,具體分析對(duì)待,(如項(xiàng)目決策人、業(yè)務(wù)簽訂后的服務(wù)對(duì)象以及付款流程等相關(guān)信息)戰(zhàn)勝市場(chǎng)疲軟的沖擊,較好的完成公司下達(dá)的銷售任務(wù),為公司在本行業(yè)的立足,立下了汗馬功勞。但從銷售業(yè)績(jī)上看,還不是很理想,與公司下達(dá)的保底指標(biāo)年產(chǎn)XX萬(wàn)立方相差了X萬(wàn)多立方,整個(gè)建筑行業(yè)大幅縮水,混凝土銷量也逐漸減少,同行單位出現(xiàn)低價(jià)銷售爭(zhēng)搶工地,惡性競(jìng)爭(zhēng),致使一些施工單位只認(rèn)單價(jià)不認(rèn)服務(wù)和質(zhì)量,這對(duì)市場(chǎng)部開展市場(chǎng)造成很大壓力,客觀上的一些因素雖然存在,在工作中其它的一些做法也有很大的問(wèn)題,主要表現(xiàn)在與客戶溝通不夠深入,銷售人員與客戶溝通的過(guò)程中沒有了解客戶的真正想法和意圖;對(duì)客戶提出的某項(xiàng)建議沒能做出迅速的反應(yīng),工作中沒有一個(gè)明確的目標(biāo)和詳細(xì)的計(jì)劃,工作局面混亂,造成欠款、舊帳難收等各種不良的后果;市場(chǎng)部和各部門所存在的問(wèn)題: 1.團(tuán)隊(duì)互助精神欠佳,部門與部門之間的溝通缺少默契,沒有做好互相支持和理解;2.工作視野不夠開闊,在開展工作中,看問(wèn)題有時(shí)只看表面,不善于站在更高的角度去思考問(wèn)題和策劃活動(dòng);3.工作細(xì)節(jié)
考慮不周,工作魄力有待提高。在新的一年里,計(jì)劃銷售目標(biāo)為XX萬(wàn)立方米,全體業(yè)務(wù)人員將腳踏實(shí)地的做好銷售工作,利用資源、努力開發(fā)新客戶,在工作中多想辦法多出點(diǎn)子。加強(qiáng)對(duì)應(yīng)收款的資金回籠,舊帳回收工作,做好工地的協(xié)調(diào)與突發(fā)事件和處理,做好實(shí)驗(yàn)室與工地和質(zhì)檢管理部門之間的溝通,提高執(zhí)行力,提高服務(wù)水平,取得客戶的信任。
四、試驗(yàn)室在20xx年完成了從C10到C60的配合比的試配生產(chǎn)工作,共生產(chǎn)普通砼、泵送砼、道路砼、水下砼、膨脹砼、細(xì)石砼、旱強(qiáng)砼、高強(qiáng)砼8個(gè)品種(其中C60砼用于洲際花園C60樁芯),混凝土合格率達(dá)到98%以上。使用的水泥為海螺P.II42.5R,天山P.O42.5R水泥,水泥檢測(cè)合格率達(dá)到100%。使用的粉煤灰以珠海電廠II級(jí)為主,以海門灰、臺(tái)山灰、烏石灰II級(jí)為輔,入庫(kù)前都進(jìn)行檢驗(yàn),粉煤灰合格率達(dá)到95%。使用的碎石為新會(huì)產(chǎn)的5~31.5mm花崗碎石,該碎石干凈、含泥量少、質(zhì)地堅(jiān)硬、風(fēng)化石少,色澤好、針片狀少,但級(jí)配稍欠佳,從八月份開始采用5~20mm花崗石搭配,調(diào)整石子的合理級(jí)配,改善混凝土性能,使用的細(xì)石為公司對(duì)面石場(chǎng)生產(chǎn),使用前試驗(yàn)室亦派人到現(xiàn)場(chǎng)檢查合格后入庫(kù)使用。使用的河砂以粗細(xì)結(jié)合,杜絕細(xì)度模數(shù)在2.0以下的砂進(jìn)場(chǎng),凡含泥量高,貝殼含量大的粗砂亦杜絕進(jìn)場(chǎng),使用時(shí)兩種砂搭配,改善混凝土和易性能,降低水泥用量。使用的外加劑為江門強(qiáng)力外加劑和深圳豐通外加劑,其中豐通外加劑的減水率不穩(wěn)定,含固量有時(shí)不達(dá)標(biāo),后通知廠商改進(jìn)??傊?0xx年所使用的材料都是先檢查后使用,確?;炷翉?qiáng)度的穩(wěn)定
性,但在使用過(guò)程中亦存一定的不足,如海螺、天山水泥在8、9月份強(qiáng)度有所下降,亦同其試驗(yàn)室主任溝通后才能保證質(zhì)量,豐通外加劑含固量不達(dá)標(biāo)亦是通過(guò)廠商的反饋,質(zhì)量才得以改進(jìn)。
存在的問(wèn)題:第一是混凝土泌水較大,針對(duì)這個(gè)問(wèn)題,試驗(yàn)室分別將海螺水泥和天山水泥作了針對(duì)性的使用,將泌水性較大的天山水泥主要用于樓板部位,嚴(yán)禁柱子、使用天山水泥,防止因泌水較大出現(xiàn)麻面,蜂窩等現(xiàn)象,將泌水較小的海螺水泥用于、柱子等重要部位,一是確保混凝土強(qiáng)度;二是防止出現(xiàn)蜂窩、麻面;三是避免將海螺水泥用于樓板,造成板面混凝土因失水產(chǎn)生干燥收縮出現(xiàn)板裂;四是道路混凝土使用純硅水泥,因泌水較少,路面不宜起砂。通過(guò)將兩種水泥作了針對(duì)性的調(diào)整,將凌宇混凝土的投訴率一直控制在很低水平。其二工地投訴較大的問(wèn)題,就是石子粒徑偏大的問(wèn)題,石子粒徑偏大造成混凝土在泵送過(guò)程中都會(huì)因坍落度偏少或偏大造成混凝土離析而出現(xiàn)泵送困難。試驗(yàn)室針對(duì)此問(wèn)題要求材料部購(gòu)進(jìn)1-2石,在1-3石中摻20-30%的1-3石,改善石子的級(jí)配,確?;炷恋谋盟托阅?,因此下半年混凝土泵送困難大幅度減少,外面請(qǐng)的泵車都愿意泵送我公司的混凝土,在同行中有一定的競(jìng)爭(zhēng)優(yōu)勢(shì)。
試驗(yàn)室在20xx年亦出現(xiàn)一些問(wèn)題,針對(duì)此問(wèn)題,試驗(yàn)室將提出整改方案,同生產(chǎn)部配合,確?;炷临|(zhì)量。第一個(gè)問(wèn)題是質(zhì)控員和施工員素質(zhì)要得到提高,互相配合,質(zhì)控員不能為滿足工地泵送性能,盡量調(diào)大砂率,降低粗砂用量,今后施工員到達(dá)施工現(xiàn)場(chǎng),通過(guò)對(duì)混凝土性能的觀察反饋回質(zhì)控員,及時(shí)調(diào)整粗砂用量和砂率,降低用水
量和水灰比,為今后配合比優(yōu)化和降低水泥用量打下基礎(chǔ),質(zhì)控員亦應(yīng)在滿足施工性能的前提下,盡量降低坍落度,今后質(zhì)控員亦應(yīng)加強(qiáng)在道路砼和高強(qiáng)砼性能的認(rèn)識(shí),不能為將就工地,盲目調(diào)大坍落度;第二個(gè)問(wèn)題就是施工員必須有高度的責(zé)任心,今后如有大工地開工,必須呆在施工現(xiàn)場(chǎng),不能回站休息;第三、為確保混凝土質(zhì)量,應(yīng)隨時(shí)觀察原材料的變化,避免砂、石混堆,避免砂、石鏟錯(cuò)料。
五、行政部:作為公司的后勤部門,吃喝拉撒的亂事一大堆,主要有以下幾個(gè)方面
(一)、行政事務(wù):
1、以公司的戰(zhàn)略決策為中心,認(rèn)真學(xué)習(xí)新的法律法規(guī),并及時(shí)的融入公司的管理中,根據(jù)新的法規(guī)條款,及時(shí)調(diào)整公司的相關(guān)制度并付諸實(shí)施,配合有關(guān)部門做好違規(guī)違紀(jì)事故調(diào)查,并按法律法規(guī)和公司的有關(guān)規(guī)定做出處理;
2、做好公司的檔案管理,使其有條不紊;
3、與當(dāng)?shù)卮濉⒕游暗胤秸嚓P(guān)部門做好信息溝通工作,為公司的正常運(yùn)作搞好其公共關(guān)系;
4、及時(shí)辦理公司證件的年審,跟進(jìn)車輛及人員意外傷害保險(xiǎn)和接續(xù),及時(shí)為員工辦理工傷和意外傷害的報(bào)案及費(fèi)用理賠;
5、在員工出現(xiàn)傷病和困難時(shí),及時(shí)探望了解情況,盡可能給予幫助,充分體現(xiàn)公司的和諧氛圍,并在10月份聯(lián)系醫(yī)療部門為公司全體員工做了體檢;
6、12月份中旬,在公司領(lǐng)導(dǎo)的支持和各相關(guān)部門的配合下,較順利的通過(guò)了ISO90001質(zhì)量體系年審工作。;
7、經(jīng)常與保安公司溝通,加強(qiáng)保安人員崗位職責(zé)管理,提高其安全、防盜意識(shí),加大保安工作監(jiān)督巡查力度,做好新保安人員的相關(guān)培訓(xùn),使其更好的做好本職工作,將不安全隱患消滅在萌芽之中,確保公司財(cái)產(chǎn)安全。
(二)人力資源管理方面:
1、認(rèn)真學(xué)習(xí)并及時(shí)跟進(jìn)相關(guān)的法律法規(guī),把好招聘質(zhì)量關(guān),今年受金融危機(jī)大氣候的影響,人員流動(dòng)比較頻繁,給招聘工作帶來(lái)了很大難度,我部在克服人員少工作量大的情況下,挖掘多渠道(網(wǎng)上、電話、人力資源信息發(fā)布、周圍各個(gè)招聘現(xiàn)場(chǎng)等等)及時(shí)做好缺崗、離崗的人員招聘;對(duì)面試入職的人員,按不同崗位,檢查其相關(guān)證件是否合乎崗位要求,按規(guī)定做好入職人員的培訓(xùn)、及相關(guān)事項(xiàng)的告知,再由相關(guān)部門經(jīng)理或技術(shù)人員,對(duì)其進(jìn)行崗位技能考核,篩選合格后方可錄用;
2、及時(shí)為新入職及離職人員辦理相關(guān)資料歸檔、合同簽訂、參保、停保、辦理解除勞動(dòng)關(guān)系、工資結(jié)算等相關(guān)手續(xù);
3、完善公司員工檔案,處理公司員工之間的勞資糾紛,解釋公司的相關(guān)政策;
三)后勤工作方面:
1、搞好食堂伙食及環(huán)境衛(wèi)生工作:嚴(yán)格執(zhí)行食堂衛(wèi)生管理規(guī)定及食堂管理制度,把好采購(gòu)貨物價(jià)格以及質(zhì)量驗(yàn)收關(guān),防止貪污浪費(fèi),讓全體員工吃飽吃好,讓員工感覺公司就是我的家;
2、在防蚊蠅時(shí)節(jié),加大消毒、清洗、滅蟲等措施,對(duì)環(huán)境衛(wèi)生及時(shí)的清理清掃,對(duì)綠化帶及時(shí)除草施肥,眼見樹木已生長(zhǎng)茂盛,很好的改善了我司的環(huán)境。但美中不足的是在希望公司個(gè)別員工吸完煙的煙頭不要亂丟,以免在草樹枯黃的時(shí)候引起意外事件;
3、及時(shí)完成公司各項(xiàng)資料的打印、復(fù)印,辦公用品和辦公設(shè)施的管理及采購(gòu),目前公司的配套設(shè)施已處于年久老化階段,無(wú)形中加大了部門的工作
壓力,但行政部全體員工在部門經(jīng)理的帶領(lǐng)下,同心協(xié)力,都能以公司利益為重,在做好本職工作的前提下,以較少的人力,發(fā)揮其較大的能量,協(xié)助部門經(jīng)理,及時(shí)做好其它的部門工作,如:食堂及辦公用品的采購(gòu)、辦公設(shè)施的采購(gòu)及維護(hù)維修、宿舍房屋及水電設(shè)施的維護(hù)維修、門窗的維護(hù)維修、總之,大到吃飯,小到下水道疏通等)。
(四)總結(jié)經(jīng)驗(yàn),吸取教訓(xùn):過(guò)去,還存在很多不足:部門領(lǐng)導(dǎo)對(duì)公司領(lǐng)導(dǎo)的意圖領(lǐng)悟不準(zhǔn),事務(wù)處理僵硬,對(duì)部門人員的工作要求還不夠嚴(yán)格,導(dǎo)致部門工作有時(shí)完成不夠及時(shí),執(zhí)行公司規(guī)章制度力度不夠,今后一定會(huì)加以完善,更好的完成公司交給的一切任務(wù)。
六、財(cái)務(wù)部:他們?cè)诓块T經(jīng)理的帶領(lǐng)下,1、認(rèn)真學(xué)習(xí)財(cái)稅法規(guī),積極參加業(yè)務(wù)培訓(xùn),提高自身業(yè)務(wù)素質(zhì),認(rèn)真履行財(cái)務(wù)工作職責(zé),把好資金報(bào)銷審核關(guān),從憑證錄入,到編制財(cái)務(wù)會(huì)計(jì)報(bào)表,從各項(xiàng)稅費(fèi)計(jì)提到申報(bào)繳納,以及資金的統(tǒng)籌安排調(diào)撥,他們都能任勞任怨,實(shí)現(xiàn)了會(huì)計(jì)信息收集、處理傳遞的及時(shí)性、準(zhǔn)確性;
2、在公司收到金融危機(jī)沖擊時(shí),把好財(cái)會(huì)核算關(guān),從材料購(gòu)進(jìn)到商品混凝土銷售,把握好成本及費(fèi)用的核算,及時(shí)與倉(cāng)管人員對(duì)賬,不定時(shí)的抽查其賬目是否正確,發(fā)現(xiàn)錯(cuò)漏,及時(shí)更正,并做好沒有的盤點(diǎn)工作,對(duì)盈虧材料找出原因,杜絕浪費(fèi),督促相關(guān)部門,盡可能的節(jié)能降耗,節(jié)約挖潛;在銷售核算過(guò)程中,加大財(cái)務(wù)管理力度,及時(shí)與銷售人員的報(bào)表進(jìn)行核對(duì),使銷售人員能及時(shí)與施工單位確認(rèn)賬款數(shù)目,促進(jìn)資金回籠;
3、應(yīng)稅務(wù)部門的要求,配合會(huì)計(jì)事務(wù)所做好匯算清繳工作;本
雖然做出了一些工作,還有庫(kù)存商品沒有建賬建卡的不足,在新的一年里將不斷總結(jié)反省,做好本部門的工作。
我們總結(jié)過(guò)去,是為了更好的展望未來(lái),20xx年我們有公司領(lǐng)導(dǎo)的正確決策和全體員工的共同努力,相信我們的明天會(huì)更好,從09年的10月份我們的生產(chǎn)量已經(jīng)逐步回升,整體經(jīng)濟(jì)形勢(shì)有所回暖,公司感謝全體員工與公司共同抗擊金融危機(jī),度過(guò)難關(guān);在xx年的下半年,公司先后上調(diào)了公司大部分員工的基本底薪和績(jī)效工資系數(shù),為了讓員工得到更好的收入,讓公司領(lǐng)導(dǎo)決定:從20xx年12月份起,公司的績(jī)效工資的計(jì)算依據(jù),由原來(lái)以實(shí)際收款方量調(diào)整為以當(dāng)月實(shí)際生產(chǎn)方量為計(jì)算依據(jù),基本底薪和績(jī)效工資由原來(lái)的每月的15和25日分兩次發(fā)放,改為每月的20日合并一次性在銀行發(fā)放。通過(guò)全體員工投票,評(píng)選出20xx先進(jìn)部門一個(gè),優(yōu)秀部門經(jīng)理一人,優(yōu)秀員工9人人,希望被評(píng)為先進(jìn)集體和優(yōu)秀個(gè)人的,充分起到先進(jìn)表率作用,不辜負(fù)公司領(lǐng)導(dǎo)及全體員工對(duì)你們的工作支持好肯定,沒有評(píng)為先進(jìn)和優(yōu)秀的,也不要?dú)怵H,要學(xué)先進(jìn),趕先進(jìn),把公司營(yíng)造成為一個(gè)和諧的大家庭。
全體員工同志們:冬天已經(jīng)過(guò)去,春天就在眼前,讓我們以百倍信心,在以李總為首的公司領(lǐng)導(dǎo)班子的帶領(lǐng)下,戰(zhàn)勝一切困難,努力做好本職工作,與公司共進(jìn)退,為公司、為社會(huì)創(chuàng)造更多的效益,也為我們自己創(chuàng)造更好的收入,讓大家的錢袋子更鼓些吧!預(yù)祝大家新春快樂(lè)!全家幸福!